Heat & Glo LifeStyle ESC-42ST Remove the Shipping Materials, Clean the Appliance, Accessories

Page 48

5.Ensure all three bottom glass latch tabs are engaged and centered in the three slots in the glass frame. The glass latch tab should protrude through the slot in the glass frame about 1/4 in. See Figure 14.5

Figure 14.5 Bottom Glass Latch Tabs Installed in Glass Frame

6.Engage the three glass latches on top. Push the top of the glass toward the fireplace. Use index fingers to manipulate top glass latches and pull out and latch the three glass assembly latches into the engagement grooves. See Figure 14.6 and Figure 14.7.

Figure 14.6 Top Glass Latch Access

GLASS FRAME

TAB

REFRACTORY

TAB

Figure 14.7. Top Glass Latch Detail

Removing Fixed Glass Assembly

Remove glass assembly by reversing these glass in- stallation instructions.

B. Remove the Shipping Materials

Remove shipping materials from inside or underneath the firebox.

C. Clean the Appliance

Clean/vacuum any sawdust that may have accumulated inside the firebox or underneath in the control cavity.

D. Accessories

Install approved accessories per instructions included with accessories. Contact your dealer for a list of ap- proved accessories.

WARNING! Risk of Fire and Electric Shock! Use ONLY Hearth & Home Technologies-approved optional acces- sories with this appliance. Using non-listed accessories could result in a safety hazard and will void the warranty.

E. Installing the Optional Heat-Zone®Gas Kit

1.Remove the knockout from the side of the appliance and discard it (see Figure 14.8).

2.Center the duct collar around the exposed hole and attach it to the appliance with 3 screws. Note: Do this BEFORE final positioning of the appliance.

3.Determine the location for the air register/fan housing assembly.

Reference the Heat-Zone®Gas Kit instructions for the remaining installations steps.

HEAT-ZONE®

KNOCKOUTS

Figure 14.8 Heat-Zone® Gas Knockouts.

48

Heat & Glo • ESC-42ST2146-900 Rev. o • 5/12

Image 48
Contents Model ESC-42ST What to do if you smell gasDo Discardnot Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingReference Materials Limited Lifetime Warranty Limited Lifetime Warranty Warranty ConditionsListing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Fixed Glass Assembly Remote ControlClear Space Decorative Doors and FrontsIPI Battery Tray/Battery Installation Module ResetNine Hour Safety Shutdown Feature Control Module OperationLighting Instructions IPI Final inspection byFrequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Exterior of Installed Glass Only Doors, Surrounds, FrontsMaintenance Tasks-Qualified Service Technician Glass Cleaning Exterior and Interior of Installed GlassGasket Seal and Glass Assembly Inspection LogsLight Bulb Maintenance Frequency As neededGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Selecting Appliance LocationBoard not Shown Attached to Minimum Framing Dimensions Constructing the Appliance ChaseClearances Mantel and Wall Projections MIN MAX NON-COMBUSTIBLE Material Fireplace OpeningHearth Extension Combustible MaterialTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Inches U.S.AVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination Top Vent Horizontal Termination One ElbowTwo Elbows H1+ H2Top Vent Horizontal Termination Three Elbows 12 ft V1 + V2 + H1 = 50 ft 15.2 m Max Ht Max Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Non-Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Appliance Package IdentificationInstalling Vent Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections Assemble Pipe SectionsAssemble Slip Sections Secure the Vent Sections10 Rotate Seams for Disassembly Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Horizontal Termination CapHeat Shield Requirements for Horizontal Termination Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements IntelliFire Plus Ignition System WiringElectrical Service and Repair Junction Box Installation Electrical InformationIPI Wiring Diagram Finishing Facing Material DoorsModel Description Elevated Appliance Dimension Elevated Hearth SystemsESC-42ST Appliance Setup TABClean the Appliance AccessoriesInstalling the Optional Heat-ZoneGas Kit Remove the Shipping MaterialsInstall Light Bulbs Ember LightsAccent Lights ScrewsInstall Refractory NotchFlange Outer Firebox Flange Refractory ClipsInstall Teco-Sil Glass Ember Rock Mystic Ember PlacementLOG Placement Instructions Grate BAR Grate Tine 4 Ember/Mineral Wool Placement Install Outer Refractory PanelsInstall Mesh Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsTroubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Troubleshooting Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-AS2DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2 DVP-TRAPRF6M RF12M Optional Wire Harness Description Part NumberRefractory Assembly Log Set Assembly Service PartsService Parts List At DepotDescription Comments Part Number Pre SN Stocked#28 IPI Valve Assembly Post SN Contact Information