10 Installing Vent Pipe

A. Assemble Vent Sections

Attach Vent to the Firebox Assembly

Note: The end of the pipe sections with the lanced tabs will face toward the appliance.

Attach the first pipe section to the starting collar:

Lanced pipe end to the starting collar

Inner pipe over inner collar

Push the pipe section until all lanced tabs snap in place

Lightly tug on pipe to confirm it has locked.

Commercial, Multi-family (Multi-level exceeding two sto- ries), or High-Rise Applications

All outer pipe joints must be sealed with high temperature silicone (minimum of 300ºF continuous exposure rating)

,including the slip section that connects directly to the horizontal termination cap.

Figure 10.1 High Temperature Silicone Sealant

Apply a bead of silicone sealant (minimum of 300ºF continuous exposure rating) inside the female outer pipe joint prior to joining sections. See Figure 10.1

Only outer pipes need to be sealed. All unit collar, pipe, slip section, elbow and cap outer flues shall be sealed in this manner, unless otherwise stated.

WARNING! Risk of Fire or Explosion! DO NOT break silicone seals on slip sections. Use care when remov- ing termination cap from slip pipe. If slip section seals are broken during removal of the termination cap, vent may leak.

Assemble Pipe Sections

A

B

Figure 10.2

Lances

Figure 10.3

Per Figure 10.2:

Start the inner pipe on the lanced end of Section A into the flared end of Section B.

Start the outer pipe of Section A over the outer pipe of Section B.

Once both vents sections are started, push firmly until all lanced tabs lock into place.

Lightly tug on the pipe to confirm the tabs have locked.

It is acceptable to use screws no longer than 1/2 in. (13

mm)to hold outer pipe sections together. If predrilling holes, DO NOT penetrate inner pipe.

For 90° and 45° elbows that are changing the vent direction from horizontal to vertical, one screw minimum should be put in the outer flue at the horizontal elbow joint to prevent the elbow from rotating. Use screws no longer than 1/2 in. (13 mm). If predrilling screw holes, DO NOT penetrate inner pipe.

Note: Make sure that the seams are not aligned to prevent unintentional disconnection.

CORRECT

Figure 10.4 Seams

INCORRECT

36

Heat & Glo • ESC-42ST2146-900 Rev. o • 5/12

Image 36
Contents Model ESC-42ST What to do if you smell gasDo Discardnot Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingReference Materials Limited Lifetime Warranty Limited Lifetime Warranty Warranty ConditionsListing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Fixed Glass Assembly Remote ControlClear Space Decorative Doors and FrontsIPI Battery Tray/Battery Installation Module ResetNine Hour Safety Shutdown Feature Control Module OperationLighting Instructions IPI Final inspection byFrequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Exterior of Installed Glass Only Doors, Surrounds, FrontsMaintenance Tasks-Qualified Service Technician Glass Cleaning Exterior and Interior of Installed GlassGasket Seal and Glass Assembly Inspection LogsLight Bulb Maintenance Frequency As neededGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Selecting Appliance LocationBoard not Shown Attached to Minimum Framing Dimensions Constructing the Appliance ChaseClearances Mantel and Wall Projections MIN MAX NON-COMBUSTIBLE Material Fireplace OpeningHearth Extension Combustible MaterialTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Inches U.S.AVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination Top Vent Horizontal Termination One ElbowTwo Elbows H1+ H2Top Vent Horizontal Termination Three Elbows 12 ft V1 + V2 + H1 = 50 ft 15.2 m Max Ht Max Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Non-Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Appliance Package IdentificationInstalling Vent Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections Assemble Pipe SectionsAssemble Slip Sections Secure the Vent Sections10 Rotate Seams for Disassembly Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Horizontal Termination CapHeat Shield Requirements for Horizontal Termination Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements IntelliFire Plus Ignition System WiringElectrical Service and Repair Junction Box Installation Electrical InformationIPI Wiring Diagram Finishing Facing Material DoorsModel Description Elevated Appliance Dimension Elevated Hearth SystemsESC-42ST Appliance Setup TABClean the Appliance AccessoriesInstalling the Optional Heat-ZoneGas Kit Remove the Shipping MaterialsInstall Light Bulbs Ember LightsAccent Lights ScrewsInstall Refractory NotchFlange Outer Firebox Flange Refractory ClipsInstall Teco-Sil Glass Ember Rock Mystic Ember PlacementLOG Placement Instructions Grate BAR Grate Tine 4 Ember/Mineral Wool Placement Install Outer Refractory PanelsInstall Mesh Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsTroubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Troubleshooting Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-AS2DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2 DVP-TRAPRF6M RF12M Optional Wire Harness Description Part NumberRefractory Assembly Log Set Assembly Service PartsService Parts List At DepotDescription Comments Part Number Pre SN Stocked#28 IPI Valve Assembly Post SN Contact Information