Heat & Glo LifeStyle ESC-42ST owner manual Facing Material, Doors

Page 45

23 IN.

 

3-1/2 IN.

 

NO COMBUSTIBLES

1/2 IN. BUILDING MATERIAL

IN THIS AREA

(MAY BE COMBUSTIBLE)

 

39 IN.

COMBUSTIBLE

 

 

FRAMING

4 IN.

 

 

FACTORY-

 

SUPPLIED 1/2 IN.

 

NON-

 

COMBUSTIBLE

 

BOARD

Figure 13.5

B. Facing Material

Metal front faces may be covered with non-combustible materials only.

Facing and/or finishing materials must not interfere with air flow through louvers, operation of louvers or doors, or access for service.

Facing and/or finishing materials must never overhang into the glass opening.

Observe all clearances when applying combustible materials.

WARNING! Risk of Fire! DO NOT apply combustible materials beyond the minimum clearances. Comply with all minimum clearances to combustibles as specified in this manual. Overlapping materials could ignite and will interfere with proper operation of doors and louvers.

COMBUSTIBLE MATERIAL

61-5/8 in.

0 in.

0 in.

0 in.

47-1/8 in.

NON-COMBUSTIBLE

BOARD

C. Doors

Only doors certified for use with this appliance model may be used. Contact your dealer for a list of doors that may be used. Once you have determined what kind of door and finishing material is going to be used on the fireplace, you may use the table below which shows the door mod- els and the finishing material thickness allowed.

FS-E42-XX

FSA-ESC42ST-XX

(REQUIRES ARCHKIT-ESC-42ST)

Figure 13.7 Approved Doors for ESC-42ST

Note: Optional firescreen sits out 1-1/2 inches from the face of the fireplace. When using thin finishing material, you may want to use thicker non-combustible backer board to bring the finishing material flush with the firescreen. This is not required.

Figure 13.6 Noncombustible Facing Diagram

Heat & Glo • ESC-42ST2146-900 Rev. o • 5/12

45

Image 45
Contents Model ESC-42ST What to do if you smell gasDo Discardnot Homeowner Reference Information CongratulationsUser Guide Table of ContentsAppliance Setup TroubleshootingReference Materials Limited Lifetime Warranty Warranty Conditions Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Remote Control Fixed Glass AssemblyClear Space Decorative Doors and FrontsModule Reset IPI Battery Tray/Battery InstallationNine Hour Safety Shutdown Feature Control Module OperationFinal inspection by Lighting Instructions IPIAfter Fireplace is Lit Frequently Asked QuestionsMaintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Exterior of Installed Glass Only Doors, Surrounds, FrontsGlass Cleaning Exterior and Interior of Installed Glass Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsFrequency As needed Light Bulb MaintenanceTypical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Selecting Appliance LocationBoard not Shown Attached to Minimum Framing Dimensions Constructing the Appliance ChaseClearances MIN MAX NON-COMBUSTIBLE Material Fireplace Opening Mantel and Wall ProjectionsCombustible Material Hearth ExtensionVent Termination Minimum Clearances Termination LocationsInches U.S.A Covered Alcove ApplicationsApproved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination One Elbow Top Vent Horizontal TerminationTwo Elbows H1+ H2Top Vent Horizontal Termination Three Elbows 12 ft V1 + V2 + H1 = 50 ft 15.2 m Max Ht Max Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Non-Combustible Wall PenetrationPipe DVP Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Top Vent Appliance PreparationAppliance Package Identification Securing and Leveling the ApplianceAttach Vent to the Firebox Assembly Installing Vent PipeAssemble Vent Sections Assemble Pipe SectionsSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections 10 Rotate Seams for DisassemblyAssemble and Install Storm Collar Install Metal Roof FlashingInstall Vertical Termination Cap Install Horizontal Termination CapHeat Shield Requirements for Horizontal Termination Fuel Conversion Gas InformationGas Pressure Gas ConnectionIntelliFire Plus Ignition System Wiring Wiring RequirementsElectrical Service and Repair Junction Box Installation Electrical InformationIPI Wiring Diagram Finishing Doors Facing MaterialModel Description Elevated Appliance Dimension Elevated Hearth SystemsESC-42ST TAB Appliance SetupAccessories Clean the ApplianceInstalling the Optional Heat-ZoneGas Kit Remove the Shipping MaterialsEmber Lights Install Light BulbsAccent Lights ScrewsNotch Install RefractoryFlange Outer Firebox Flange Refractory ClipsMystic Ember Placement Install Teco-Sil Glass Ember RockLOG Placement Instructions Grate Tine Grate BAR 4 Install Outer Refractory Panels Ember/Mineral Wool PlacementInstall Trim and/or Surround Install MeshAir Shutter Setting Air Shutter SettingsTroubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Troubleshooting Reference Materials Appliance Dimension DiagramDVP-AS2 Vent Components DiagramsDVP-TRAP DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2RF6M RF12M Description Part Number Optional Wire HarnessService Parts Refractory Assembly Log Set AssemblyService Parts List At DepotDescription Comments Part Number Stocked Pre SN#28 IPI Valve Assembly Post SN Contact Information