FireplaceXtrordinair 36CF installation manual CF ST/Pier Gas Fireplace

Page 1

36 CF ST/Pier

Gas Fireplace

Tested and Listed by

OMNI-Test Laboratories, Inc.

Portland, Oregon

Report # 028-F-87-5

ANSI Z21.88a-2007

Built-In Direct Vent Fireplace

Natural Gas or Propane

Residential or Mobile Home

Bedroom Approved

WARNING: If the information in these instructions is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life.

-Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance.

WHAT TO DO IF YOU SMELL GAS

Do not try to light any appliance.

Do not touch any electrical switch; do not use any phone in your building.

Immediately call gas supplier from a neighbor's phone. Follow the gas supplier's instructions.

If you cannot reach your gas supplier, call the fire department.

-Installation and service must be performed by a qualified installer, service agency or the gas supplier.

This appliance may be installed in an aftermarket permanently located, manufactured home (USA only) or mobile home, where not prohibited by local codes.

This appliance is only for use with the type(s) of gas indicated on the rating plate. A conversion kit is supplied with the appliance.

Installation Manual

Installer: After installation give this manual to the home- owner and explain operation of this heater.

Copyright 2009, T.I.

$10.00

100-01212_000

4090102

www.travisproducts.com

4800 Harbour Pointe Blvd. SW

Mukilteo, WA 98275

Image 1
Contents CF ST/Pier Gas Fireplace Overview Listing Details 2IntroductionTable of Contents Safety Warnings Safety PrecautionsSafety Precautions Installation Options Features and SpecificationsSpecifications DimensionsPacking List Recommended Installation ProcedureAdditional Items Required Massachusetts Requirements Preparing the Fireplace Stand-offs Clearances Fireplace Placement RequirementsRaised Fireplaces Back Minimum Framing 36 CF ST See ThroughFront Framing Dimensions 36 CF PierAttaching Stand-Offs to Framing Required Electrical Connection Do not route the wires over the top Fireplace Battery Pack / Learn Switch InstallationInstallation Warning Remote Synchronization Steps for Installing the Battery Box and Learn SwitchBattery Installation Synchronizing the Remote Remote SynchronizationGas Line Connection Gas Line RequirementsGas Inlet Pressure Vent Requirements Vent InstallationApproved Vent Altitude ConsiderationsVent Location Vent ClearancesExhaust Restrictor Adjustment Approved Vent Configurations0feet Max 5feet Approved Vent Configuration Rear Vent, Horz. Term 45 ElbowFeet max 0feet 5feet 10feet 15feet 20max Max 0feet 5feet 10feet 15feet 20max Feet Max Feet max 0feet 5feet 10feet 15feet 20max Installation for qualified installers only 0feet 5feet Feet max 10feet 15feet 40feet max Feet 5feet 10feet 15feet 20max Max 40feet max Feet 5feet 10feet 15feet Termination Requirements Flush Hearth Hearth RequirementsHearth Requirements Recessed Hearth Facing Requirements Non-Combustible Facing See Through Mantel RequirementsSteps for Finalizing the Installation Finalizing the Installation for qualified installers onlyAir Shutter Adjustment Finalizing the Installation for qualified installers onlyGlass Frame Glass Trim Glass Frame Removal and InstallationEmber Placement Log Set InstallationRock Wool Placement Log Installation Top 2 logs last 2 logs Picture from opposite side Picture from end Pier only LP Conversion Instructions Finalizing the Installation for qualified installers only Orifice Table Rate Screws Andiron Installation Power Heat Duct Installation48Index