FireplaceXtrordinair 36CF installation manual Power Heat Duct Installation, Andiron Installation

Page 47

Finalizing the Installation (for qualified installers only)

47

Power Heat Duct Installation

The optional power heat duct may be used with this fireplace. Refer to the part numbers below if you wish to insta this accessory. Instructions are includ with the power heat duct.

Power Heat Duct (98500769)

1080/36 ST-Pier CF Power Heat Duct Wiring Kit (94400995) - required for thermodisk controlled on/off operation

NOTE: The power heat duct must be attached at the time of firepla installation.

Andiron Installation

 

 

Floor

Junction Box

 

Boot

 

Maximum Duct

 

 

Length = 20'

Rheostat

 

 

(with cover plate)

 

 

Use 10” x 3-1/4”

 

Blower

 

Box

wall stack (duct)

 

 

 

when passing

 

Duct Adapter

through tight

 

(6” Round to 10” x 3-1/4”)

areas.

 

6" Duct

 

 

 

 

Starter Ring

 

 

Heat Duct

Grill

 

Electrical

Wall Adapter

Wiring

 

 

(for use on

 

 

2 x 4 walls)

 

 

 

Electrical

 

 

Source

This fireplace includes four andiron brackets that allow for use of the optional andirons. Follow the directions below if installing andirons. NOTE: The firebacks should be installed prior to installing the andirons.

1The andiron clip attaches to the front of the burner (there are two on each side for a total of four). Remove the screw and attach the clip. NOTE: the firebacks are not pictured in the pictures.

2Secure the andiron to the clip with the bolts included with the andirons. We recommend you pre-thread the andirons to ease installation.

© Travis Industries

4090102

100-01212_000

Image 47
Contents CF ST/Pier Gas Fireplace Overview Listing Details 2IntroductionTable of Contents Safety Warnings Safety PrecautionsSafety Precautions Dimensions Features and SpecificationsInstallation Options SpecificationsAdditional Items Required Recommended Installation ProcedurePacking List Massachusetts Requirements Preparing the Fireplace Stand-offs Raised Fireplaces Fireplace Placement RequirementsClearances Back Minimum Framing 36 CF ST See ThroughFront Framing Dimensions 36 CF PierAttaching Stand-Offs to Framing Required Electrical Connection Do not route the wires over the top Fireplace Battery Pack / Learn Switch InstallationBattery Installation Steps for Installing the Battery Box and Learn SwitchInstallation Warning Remote Synchronization Synchronizing the Remote Remote SynchronizationGas Inlet Pressure Gas Line RequirementsGas Line Connection Altitude Considerations Vent InstallationVent Requirements Approved VentVent Location Vent ClearancesExhaust Restrictor Adjustment Approved Vent Configurations0feet Max 5feet Approved Vent Configuration Rear Vent, Horz. Term 45 ElbowFeet max 0feet 5feet 10feet 15feet 20max Max 0feet 5feet 10feet 15feet 20max Feet Max Feet max 0feet 5feet 10feet 15feet 20max Installation for qualified installers only 0feet 5feet Feet max 10feet 15feet 40feet max Feet 5feet 10feet 15feet 20max Max 40feet max Feet 5feet 10feet 15feet Termination Requirements Flush Hearth Hearth RequirementsHearth Requirements Recessed Hearth Facing Requirements Non-Combustible Facing See Through Mantel RequirementsSteps for Finalizing the Installation Finalizing the Installation for qualified installers onlyAir Shutter Adjustment Finalizing the Installation for qualified installers onlyGlass Frame Glass Trim Glass Frame Removal and InstallationRock Wool Placement Log Set InstallationEmber Placement Log Installation Top 2 logs last 2 logs Picture from opposite side Picture from end Pier only LP Conversion Instructions Finalizing the Installation for qualified installers only Orifice Table Rate Screws Andiron Installation Power Heat Duct Installation48Index