FireplaceXtrordinair
36CF
installation manual
Picture from end Pier only
Specification
Install
Dimension
Approved Vent Configurations
Air Shutter Adjustment
Ember Placement
Safety Precautions
Page 42
42 Finalizing the Installation
(for qualified installers only)
Picture from end (Pier only)
© Travis Industries
4090102
100-01212_000
Page 41
Page 43
Image 42
Page 41
Page 43
Contents
CF ST/Pier Gas Fireplace
2Introduction
Overview Listing Details
Table of Contents
Safety Precautions
Safety Warnings
Safety Precautions
Specifications
Features and Specifications
Installation Options
Dimensions
Recommended Installation Procedure
Packing List
Additional Items Required
Massachusetts Requirements
Preparing the Fireplace Stand-offs
Fireplace Placement Requirements
Clearances
Raised Fireplaces
Minimum Framing 36 CF ST See Through
Back
Framing Dimensions 36 CF Pier
Front
Attaching Stand-Offs to Framing
Required Electrical Connection
Battery Pack / Learn Switch Installation
Do not route the wires over the top Fireplace
Steps for Installing the Battery Box and Learn Switch
Installation Warning Remote Synchronization
Battery Installation
Remote Synchronization
Synchronizing the Remote
Gas Line Requirements
Gas Line Connection
Gas Inlet Pressure
Approved Vent
Vent Installation
Vent Requirements
Altitude Considerations
Vent Clearances
Vent Location
Approved Vent Configurations
Exhaust Restrictor Adjustment
Approved Vent Configuration Rear Vent, Horz. Term 45 Elbow
0feet Max 5feet
Feet max 0feet 5feet 10feet 15feet 20max Max
0feet 5feet 10feet 15feet 20max Feet Max
Feet max 0feet 5feet 10feet 15feet 20max
Installation for qualified installers only
0feet 5feet Feet max 10feet 15feet
40feet max Feet 5feet 10feet 15feet 20max Max
40feet max Feet 5feet 10feet 15feet
Termination Requirements
Hearth Requirements
Flush Hearth
Hearth Requirements Recessed Hearth
Facing Requirements
Non-Combustible Facing
Mantel Requirements
See Through
Finalizing the Installation for qualified installers only
Steps for Finalizing the Installation
Finalizing the Installation for qualified installers only
Air Shutter Adjustment
Glass Frame Removal and Installation
Glass Frame Glass Trim
Log Set Installation
Ember Placement
Rock Wool Placement
Log Installation
Top 2 logs last 2 logs Picture from opposite side
Picture from end Pier only
LP Conversion Instructions
Finalizing the Installation for qualified installers only
Orifice Table
Rate Screws
Power Heat Duct Installation
Andiron Installation
48Index
Related pages
Troubleshooting for Philips 170S2B
Specifications Affected by Preamp for Agilent Technologies N9010A
About the Indicator Lights for Sony VGNA600
L4451A Simplified Block Diagrams for Agilent Technologies L4400
When using for Philips VL1100
Installing accessories for Samsung SLM3320NDXAA
Parts LIST/LISTA DE PIEZAS/LISTE DES Pièces for Elkay ERS1-1E/2E
Language code list for Panasonic SC-BTT190
Differential AIR Pressure Switch Check for Quantum GAS-FIRED BOILERS
What are the troubleshooting tips in the
Jenn-Air parts manual
?
Top
Page
Image
Contents