FireplaceXtrordinair 36CF installation manual Required Electrical Connection

Page 14

14

Installation (for qualified installers only)

Required Electrical Connection

Make sure power to the heater has been turned off prior to installation (disable the breaker).

Do not connect 110-120 VAC to the gas control valve or the on/off circuit on this fireplace.

This fireplace utilizes 110 VAC to power the receiver module and intermittent pilot system.

The electrical line to the grounded receptacle inside the fireplace must be installed by a qualified installer and must meet all local codes. The fireplace must be properly grounded in accordance with local codes (or ANSI/NFPA 70-1987).

Make sure the household breaker is shut off prior to working on any electrical lines.

The fireplace must be properly grounded in accordance with local codes (or ANSI/NFPA 70-1987)

The electrical line must be a min. 14 gauge, and supply 120 Volts at 60 Hz (2 Amps)

Caution: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation.

Attach an electrical line to the receptacle inside the control box (see the illustration below). Make sure to connect the ground wire to the grounding tab on the receptacle (this grounds the fireplace).

Control Box

Cover Plate

Romex Connector

Grounded 110V

Power Supply

Attach the electrical line,

including the grounding wire,

to this receptacle.

© Travis Industries

4090102

100-01212_000

Image 14
Contents CF ST/Pier Gas Fireplace 2Introduction Overview Listing DetailsTable of Contents Safety Precautions Safety WarningsSafety Precautions Specifications Features and SpecificationsInstallation Options DimensionsAdditional Items Required Recommended Installation ProcedurePacking List Massachusetts Requirements Preparing the Fireplace Stand-offs Raised Fireplaces Fireplace Placement RequirementsClearances Minimum Framing 36 CF ST See Through BackFraming Dimensions 36 CF Pier FrontAttaching Stand-Offs to Framing Required Electrical Connection Battery Pack / Learn Switch Installation Do not route the wires over the top FireplaceBattery Installation Steps for Installing the Battery Box and Learn SwitchInstallation Warning Remote Synchronization Remote Synchronization Synchronizing the RemoteGas Inlet Pressure Gas Line RequirementsGas Line Connection Approved Vent Vent InstallationVent Requirements Altitude ConsiderationsVent Clearances Vent LocationApproved Vent Configurations Exhaust Restrictor AdjustmentApproved Vent Configuration Rear Vent, Horz. Term 45 Elbow 0feet Max 5feetFeet max 0feet 5feet 10feet 15feet 20max Max 0feet 5feet 10feet 15feet 20max Feet Max Feet max 0feet 5feet 10feet 15feet 20max Installation for qualified installers only 0feet 5feet Feet max 10feet 15feet 40feet max Feet 5feet 10feet 15feet 20max Max 40feet max Feet 5feet 10feet 15feet Termination Requirements Hearth Requirements Flush HearthHearth Requirements Recessed Hearth Facing Requirements Non-Combustible Facing Mantel Requirements See ThroughFinalizing the Installation for qualified installers only Steps for Finalizing the InstallationFinalizing the Installation for qualified installers only Air Shutter AdjustmentGlass Frame Removal and Installation Glass Frame Glass TrimRock Wool Placement Log Set InstallationEmber Placement Log Installation Top 2 logs last 2 logs Picture from opposite side Picture from end Pier only LP Conversion Instructions Finalizing the Installation for qualified installers only Orifice Table Rate Screws Power Heat Duct Installation Andiron Installation48Index