FireplaceXtrordinair 36CF installation manual Orifice Table

Page 45

Finalizing the Installation (for qualified installers only)

45

7The manifolds that secure the three orifices are visible at this point. Detach the air shutter stopper on the mixing tube brackets to gain full access to the orifices (2 screws hold them in place).

8Remove the NG orifices and replace with the LP orifices. See the table below for correct orifice selection (each orifice is stamped for identification).

NOTE: The LP orifice kit only includes two #56 orifices (these install on the side burners). For the center burner, remove one of the side burner orifices (# 52 - shipped on the fireplace for NG configuration) and place it on the center manifold.

ORIFICE TABLE

Center Burner

Side Burner (2)

 

 

 

NG

#32

#52

 

 

 

LP

#52

#56

 

 

 

9Switch the pilot hood to the “LP” size following the directions below.

Un-screw the pilot

Slide this silver tab out.

When in the LP position a hole

Tighten the pilot hood

 

will appear near one of the tabs.

until it is fully secure.

hood 1/4 turn.

 

 

7/16"Wrench

 

 

Figure 26

NOTE: The sliding portion of the pilot orifice may be positioned differently. Instead of pulling it towards you, you may push it away. Either way – when the hole appears near the tab, the orifice is in the LP position.

10 Remove the cover over the gas control valve.

© Travis Industries

4090102

100-01212_000

Image 45
Contents CF ST/Pier Gas Fireplace Overview Listing Details 2IntroductionTable of Contents Safety Warnings Safety PrecautionsSafety Precautions Installation Options Features and SpecificationsSpecifications DimensionsRecommended Installation Procedure Packing ListAdditional Items Required Massachusetts Requirements Preparing the Fireplace Stand-offs Fireplace Placement Requirements ClearancesRaised Fireplaces Back Minimum Framing 36 CF ST See ThroughFront Framing Dimensions 36 CF PierAttaching Stand-Offs to Framing Required Electrical Connection Do not route the wires over the top Fireplace Battery Pack / Learn Switch InstallationSteps for Installing the Battery Box and Learn Switch Installation Warning Remote SynchronizationBattery Installation Synchronizing the Remote Remote SynchronizationGas Line Requirements Gas Line ConnectionGas Inlet Pressure Vent Requirements Vent InstallationApproved Vent Altitude ConsiderationsVent Location Vent ClearancesExhaust Restrictor Adjustment Approved Vent Configurations0feet Max 5feet Approved Vent Configuration Rear Vent, Horz. Term 45 ElbowFeet max 0feet 5feet 10feet 15feet 20max Max 0feet 5feet 10feet 15feet 20max Feet Max Feet max 0feet 5feet 10feet 15feet 20max Installation for qualified installers only 0feet 5feet Feet max 10feet 15feet 40feet max Feet 5feet 10feet 15feet 20max Max 40feet max Feet 5feet 10feet 15feet Termination Requirements Flush Hearth Hearth RequirementsHearth Requirements Recessed Hearth Facing Requirements Non-Combustible Facing See Through Mantel RequirementsSteps for Finalizing the Installation Finalizing the Installation for qualified installers onlyAir Shutter Adjustment Finalizing the Installation for qualified installers onlyGlass Frame Glass Trim Glass Frame Removal and InstallationLog Set Installation Ember PlacementRock Wool Placement Log Installation Top 2 logs last 2 logs Picture from opposite side Picture from end Pier only LP Conversion Instructions Finalizing the Installation for qualified installers only Orifice Table Rate Screws Andiron Installation Power Heat Duct Installation48Index