FireplaceXtrordinair 36CF installation manual Preparing the Fireplace Stand-offs

Page 9

Installation (for qualified installers only)

9

Preparing the Fireplace Stand-offs

This appliance is shipped with the header and side stand-offs in the retracted position. These stand- offs must be placed in their upright position prior to installing the fireplace. Secure the stand-offs to the framing with screws or other fasteners.

WARNING: Failure to correctly erect the stand-offs may lead to a serious fire-hazard and will void the listing and warranty of this fireplace.

b

c

a

d

e

Figure 3

© Travis Industries

4090102

100-01212_000

Image 9
Contents CF ST/Pier Gas Fireplace Overview Listing Details 2IntroductionTable of Contents Safety Warnings Safety PrecautionsSafety Precautions Installation Options Features and SpecificationsSpecifications DimensionsRecommended Installation Procedure Packing ListAdditional Items Required Massachusetts Requirements Preparing the Fireplace Stand-offs Fireplace Placement Requirements ClearancesRaised Fireplaces Back Minimum Framing 36 CF ST See ThroughFront Framing Dimensions 36 CF PierAttaching Stand-Offs to Framing Required Electrical Connection Do not route the wires over the top Fireplace Battery Pack / Learn Switch InstallationSteps for Installing the Battery Box and Learn Switch Installation Warning Remote SynchronizationBattery Installation Synchronizing the Remote Remote SynchronizationGas Line Requirements Gas Line ConnectionGas Inlet Pressure Vent Requirements Vent InstallationApproved Vent Altitude ConsiderationsVent Location Vent ClearancesExhaust Restrictor Adjustment Approved Vent Configurations0feet Max 5feet Approved Vent Configuration Rear Vent, Horz. Term 45 ElbowFeet max 0feet 5feet 10feet 15feet 20max Max 0feet 5feet 10feet 15feet 20max Feet Max Feet max 0feet 5feet 10feet 15feet 20max Installation for qualified installers only 0feet 5feet Feet max 10feet 15feet 40feet max Feet 5feet 10feet 15feet 20max Max 40feet max Feet 5feet 10feet 15feet Termination Requirements Flush Hearth Hearth RequirementsHearth Requirements Recessed Hearth Facing Requirements Non-Combustible Facing See Through Mantel RequirementsSteps for Finalizing the Installation Finalizing the Installation for qualified installers onlyAir Shutter Adjustment Finalizing the Installation for qualified installers onlyGlass Frame Glass Trim Glass Frame Removal and InstallationLog Set Installation Ember PlacementRock Wool Placement Log Installation Top 2 logs last 2 logs Picture from opposite side Picture from end Pier only LP Conversion Instructions Finalizing the Installation for qualified installers only Orifice Table Rate Screws Andiron Installation Power Heat Duct Installation48Index