FireplaceXtrordinair 36CF Gas Line Requirements, Gas Line Connection, Gas Inlet Pressure

Page 18

18

Installation (for qualified installers only)

Gas Line Requirements

MASSACHUSETTS INSTALLATIONS - WARNING:

THIS PRODUCT MUST BE INSTALLED BY A LICENSED PLUMBER OR GAS FITTER WHEN INSTALLED WITHIN THE COMMONWEALTH OF MASSACHUSETTS.

OTHER MASSACHUSETTS CODE REQUIREMENTS:

Flexible connector must not be longer than 36 inches.

Shutoff valve must be a “T” handle gas cock.

Only direct vent sealed combustion products are approved for bedrooms or bathrooms.

Fireplace dampers must be removed or welded in the open position prior to the installation of a fireplace insert or gas log.

A carbon monoxide (CO) detector is required in the same room as the appliance.

The gas line must be installed in accordance with all local codes, if any; if not, follow ANSI 223.1 and the requirements listed below.

The fireplace and gas control valve must be disconnected from the gas supply piping during any pressure testing of that system at test pressures in excess of 1/2 psig. For pressures under 1/2 psig, isolate the gas supply piping by closing the manual shutoff valve.

Leak test all gas line joints and the gas control valve prior to and after starting the fireplace.

This fireplace is designed either for natural gas or for propane (but not for both). Make sure the correct fuel is used.

An accessible manual shut-off valve (“t” handle gas cock) is required within 6’ of the fireplace.

Gas Line Connection

Installation must be performed by a qualified installer, service agency or the gas supplier (In Massachusetts a licensed plumber/gasfitter).

A shutoff valve is built into the fireplace. It is located on the back side of the fireplace and acts as the gas inlet connection. After installing the gas line (and testing), remove the cover plate shown below and turn the gas shutoff valve to “ON”.

Gas Line (1/2" M.P.T.)

NOTE: This cover plate may be removed to access the shut-off valve.

Figure 10

Gas Inlet Pressure

 

Standard Input Pressure

 

 

Natural Gas

7" W.C. (1.74 kPA)

Propane

13" W.C. (2.73 kPA)

If the pressure is not sufficient, make sure the piping used is large enough, the supply regulator is adequately adjusted, and the total gas load for the residence does not exceed the amount supplied.

The supply regulator (the regulator that attaches directly to the residence inlet or to the propane tank) should supply gas at the suggested input pressure listed above. Contact the local gas supplier if the regulator is at an improper pressure.

© Travis Industries

4090102

100-01212_000

Image 18
Contents CF ST/Pier Gas Fireplace 2Introduction Overview Listing DetailsTable of Contents Safety Precautions Safety WarningsSafety Precautions Specifications Features and SpecificationsInstallation Options DimensionsRecommended Installation Procedure Packing ListAdditional Items Required Massachusetts Requirements Preparing the Fireplace Stand-offs Fireplace Placement Requirements ClearancesRaised Fireplaces Minimum Framing 36 CF ST See Through BackFraming Dimensions 36 CF Pier FrontAttaching Stand-Offs to Framing Required Electrical Connection Battery Pack / Learn Switch Installation Do not route the wires over the top FireplaceSteps for Installing the Battery Box and Learn Switch Installation Warning Remote SynchronizationBattery Installation Remote Synchronization Synchronizing the RemoteGas Line Requirements Gas Line ConnectionGas Inlet Pressure Approved Vent Vent InstallationVent Requirements Altitude ConsiderationsVent Clearances Vent LocationApproved Vent Configurations Exhaust Restrictor AdjustmentApproved Vent Configuration Rear Vent, Horz. Term 45 Elbow 0feet Max 5feetFeet max 0feet 5feet 10feet 15feet 20max Max 0feet 5feet 10feet 15feet 20max Feet Max Feet max 0feet 5feet 10feet 15feet 20max Installation for qualified installers only 0feet 5feet Feet max 10feet 15feet 40feet max Feet 5feet 10feet 15feet 20max Max 40feet max Feet 5feet 10feet 15feet Termination Requirements Hearth Requirements Flush HearthHearth Requirements Recessed Hearth Facing Requirements Non-Combustible Facing Mantel Requirements See ThroughFinalizing the Installation for qualified installers only Steps for Finalizing the InstallationFinalizing the Installation for qualified installers only Air Shutter AdjustmentGlass Frame Removal and Installation Glass Frame Glass TrimLog Set Installation Ember PlacementRock Wool Placement Log Installation Top 2 logs last 2 logs Picture from opposite side Picture from end Pier only LP Conversion Instructions Finalizing the Installation for qualified installers only Orifice Table Rate Screws Power Heat Duct Installation Andiron Installation48Index