FireplaceXtrordinair 36CF installation manual Feet max 0feet 5feet 10feet 15feet 20max

Page 25

Installation (for qualified installers only)

25

Approved Vent Configuration – Rear Vent, Vert. Term. (1 45° , 3 90° Elbows)

The termination must fall within the shaded area shown in the chart. Use the indicated restrictor positions.

30feet (max.)

25feet

20feet

15 feet

10 feet

5 feet

0 feet

0feet

5feet

10feet

15feet

20'(max)

30 feet (max.)

Exhaust Restrictor # 3

25 feet

Exhaust Restrictor # 2

20 feet

15 feet

Exhaust Restrictor # 1

10 feet

5 feet

0 feet

0feet

5feet

10feet

15feet

20'(max)

Figure 15

© Travis Industries

4090102

100-01212_000

Image 25
Contents CF ST/Pier Gas Fireplace Overview Listing Details 2IntroductionTable of Contents Safety Warnings Safety PrecautionsSafety Precautions Installation Options Features and SpecificationsSpecifications DimensionsPacking List Recommended Installation ProcedureAdditional Items Required Massachusetts Requirements Preparing the Fireplace Stand-offs Clearances Fireplace Placement RequirementsRaised Fireplaces Back Minimum Framing 36 CF ST See ThroughFront Framing Dimensions 36 CF PierAttaching Stand-Offs to Framing Required Electrical Connection Do not route the wires over the top Fireplace Battery Pack / Learn Switch InstallationInstallation Warning Remote Synchronization Steps for Installing the Battery Box and Learn SwitchBattery Installation Synchronizing the Remote Remote SynchronizationGas Line Connection Gas Line RequirementsGas Inlet Pressure Vent Requirements Vent InstallationApproved Vent Altitude ConsiderationsVent Location Vent ClearancesExhaust Restrictor Adjustment Approved Vent Configurations0feet Max 5feet Approved Vent Configuration Rear Vent, Horz. Term 45 ElbowFeet max 0feet 5feet 10feet 15feet 20max Max 0feet 5feet 10feet 15feet 20max Feet Max Feet max 0feet 5feet 10feet 15feet 20max Installation for qualified installers only 0feet 5feet Feet max 10feet 15feet 40feet max Feet 5feet 10feet 15feet 20max Max 40feet max Feet 5feet 10feet 15feet Termination Requirements Flush Hearth Hearth RequirementsHearth Requirements Recessed Hearth Facing Requirements Non-Combustible Facing See Through Mantel RequirementsSteps for Finalizing the Installation Finalizing the Installation for qualified installers onlyAir Shutter Adjustment Finalizing the Installation for qualified installers onlyGlass Frame Glass Trim Glass Frame Removal and InstallationEmber Placement Log Set InstallationRock Wool Placement Log Installation Top 2 logs last 2 logs Picture from opposite side Picture from end Pier only LP Conversion Instructions Finalizing the Installation for qualified installers only Orifice Table Rate Screws Andiron Installation Power Heat Duct Installation48Index