FireplaceXtrordinair 36CF installation manual 48Index

Page 48

48Index

Index

Andiron Installation

47

Installation Options

6

Additional Items Required

7

Listing Details

2

Air Shutter Adjustment

37

LP Conversion Instructions

43

Altitude Considerations

19

Mantel Requirements

35

Approved Vent

19

Minimum Framing

11

Battery Installation

16

Overview

2

Battery Pack / Learn Switch Installation

15

Packing List

7

Clearances

10

Power Heat Duct Installation

47

Dimensions

6

Preparing the Fireplace Stand-offs

9

Non-Combustible Facing

34

Raised Fireplaces

10

Facing Requirements

33

Recommended Installation Procedure

7

Fireplace Placement Requirements

10

Remote Synchronization

17

Framing Dimensions

12

Safety Precautions

4

Gas Inlet Pressure

18

Specifications

6

Gas Line Connection

18

Termination Requirements

30

Gas Line Requirements

18

Vent Clearances

20

Glass Frame Removal and Installation

38

Vent Installation

19

Hearth Requirements – Recessed Hearth

32

Vent Requirements

19

Hearth Requirements

31

 

 

© Travis Industries

4090102

100-01212_000

Image 48
Contents CF ST/Pier Gas Fireplace 2Introduction Overview Listing DetailsTable of Contents Safety Precautions Safety WarningsSafety Precautions Features and Specifications Installation OptionsSpecifications DimensionsRecommended Installation Procedure Packing ListAdditional Items Required Massachusetts Requirements Preparing the Fireplace Stand-offs Fireplace Placement Requirements ClearancesRaised Fireplaces Minimum Framing 36 CF ST See Through BackFraming Dimensions 36 CF Pier FrontAttaching Stand-Offs to Framing Required Electrical Connection Battery Pack / Learn Switch Installation Do not route the wires over the top FireplaceSteps for Installing the Battery Box and Learn Switch Installation Warning Remote SynchronizationBattery Installation Remote Synchronization Synchronizing the RemoteGas Line Requirements Gas Line ConnectionGas Inlet Pressure Vent Installation Vent RequirementsApproved Vent Altitude ConsiderationsVent Clearances Vent LocationApproved Vent Configurations Exhaust Restrictor AdjustmentApproved Vent Configuration Rear Vent, Horz. Term 45 Elbow 0feet Max 5feetFeet max 0feet 5feet 10feet 15feet 20max Max 0feet 5feet 10feet 15feet 20max Feet Max Feet max 0feet 5feet 10feet 15feet 20max Installation for qualified installers only 0feet 5feet Feet max 10feet 15feet 40feet max Feet 5feet 10feet 15feet 20max Max 40feet max Feet 5feet 10feet 15feet Termination Requirements Hearth Requirements Flush HearthHearth Requirements Recessed Hearth Facing Requirements Non-Combustible Facing Mantel Requirements See ThroughFinalizing the Installation for qualified installers only Steps for Finalizing the InstallationFinalizing the Installation for qualified installers only Air Shutter AdjustmentGlass Frame Removal and Installation Glass Frame Glass TrimLog Set Installation Ember PlacementRock Wool Placement Log Installation Top 2 logs last 2 logs Picture from opposite side Picture from end Pier only LP Conversion Instructions Finalizing the Installation for qualified installers only Orifice Table Rate Screws Power Heat Duct Installation Andiron Installation48Index