FireplaceXtrordinair 36CF installation manual Table of Contents

Page 3

Table of Contents

3

Introduction

 

Overview

2

Listing Details

2

Safety Precautions

 

Safety Precautions

4

Features and Specifications

 

Installation Options

6

Specifications

6

Dimensions

6

Installation

 

Packing List

7

Additional Items Required

7

Recommended Installation Procedure

7

Massachusetts Requirements

8

Preparing the Fireplace Stand-offs

9

Fireplace Placement Requirements

10

Clearances

10

Raised Fireplaces

10

Minimum Framing 36 CF ST (See Through)

11

Framing Dimensions – 36 CF Pier

12

Attaching Stand-Offs to Framing

13

Required Electrical Connection

14

Battery Pack / Learn Switch Installation

15

Steps for Installing the Battery Box and Learn Switch..16

Battery Installation

16

Remote Synchronization

17

Gas Line Requirements

18

Gas Line Connection

18

Gas Inlet Pressure

18

Installation (continued)

 

 

 

Vent Requirements

 

19

Approved Vent

 

19

Altitude Considerations

 

19

Vent Clearances

 

20

Vent Installation

 

19

Approved Vent Configurations:

 

 

 

Exhaust Restrictor Adjustment

 

21

Vent Location

 

21

Rear Vent, Horz. Term. (1 45° Elbow)

22

Rear Vent, Horz. Term. (1 45° , 2 90°

Elbows)

23

Rear Vent, Horz. Term. (1 45° , 4 90°

Elbows)

24

Rear Vent, Vert. Term. (1 45° , 3 90°

Elbows)

25

Top Vent, Horz. Term. (1 45° , 1 90°

Elbow)

26

Top Vent, Horz. Term. (1 45° , 3 90°

Elbows)

27

Top Vent, Vert. Term. (1, 3, or 5 45°

Elbows)

28

Top Vent, Vert. Term. (1 45° , 2 90°

Elbows)

29

Termination Requirements

 

30

Hearth Requirements

 

31

Hearth Requirements – Recessed Hearth

32

Facing Requirements

 

33

Non-Combustible Facing

 

34

Mantel Requirements

 

35

Finalizing the Installation

 

 

 

Steps for Finalizing the Installation

 

36

Air Shutter Adjustment

 

37

Glass Frame Removal and Installation

........................

38

Log Set Installation

 

39

LP Conversion Instructions

 

43

Power Heat Duct Installation

 

47

Andiron Installation

 

47

Index

 

 

 

Index

48

© Travis Industries

4090102

100-01212_000

Image 3
Contents CF ST/Pier Gas Fireplace Overview Listing Details 2IntroductionTable of Contents Safety Warnings Safety PrecautionsSafety Precautions Dimensions Features and SpecificationsInstallation Options SpecificationsRecommended Installation Procedure Packing ListAdditional Items Required Massachusetts Requirements Preparing the Fireplace Stand-offs Fireplace Placement Requirements ClearancesRaised Fireplaces Back Minimum Framing 36 CF ST See ThroughFront Framing Dimensions 36 CF PierAttaching Stand-Offs to Framing Required Electrical Connection Do not route the wires over the top Fireplace Battery Pack / Learn Switch InstallationSteps for Installing the Battery Box and Learn Switch Installation Warning Remote SynchronizationBattery Installation Synchronizing the Remote Remote SynchronizationGas Line Requirements Gas Line ConnectionGas Inlet Pressure Altitude Considerations Vent InstallationVent Requirements Approved VentVent Location Vent ClearancesExhaust Restrictor Adjustment Approved Vent Configurations0feet Max 5feet Approved Vent Configuration Rear Vent, Horz. Term 45 ElbowFeet max 0feet 5feet 10feet 15feet 20max Max 0feet 5feet 10feet 15feet 20max Feet Max Feet max 0feet 5feet 10feet 15feet 20max Installation for qualified installers only 0feet 5feet Feet max 10feet 15feet 40feet max Feet 5feet 10feet 15feet 20max Max 40feet max Feet 5feet 10feet 15feet Termination Requirements Flush Hearth Hearth RequirementsHearth Requirements Recessed Hearth Facing Requirements Non-Combustible Facing See Through Mantel RequirementsSteps for Finalizing the Installation Finalizing the Installation for qualified installers onlyAir Shutter Adjustment Finalizing the Installation for qualified installers onlyGlass Frame Glass Trim Glass Frame Removal and InstallationLog Set Installation Ember PlacementRock Wool Placement Log Installation Top 2 logs last 2 logs Picture from opposite side Picture from end Pier only LP Conversion Instructions Finalizing the Installation for qualified installers only Orifice Table Rate Screws Andiron Installation Power Heat Duct Installation48Index