PB Heat Gas/Oil Boilers manual Place the Boiler

Page 14

PLACE THE BOILER

Figure 2.4: Install Additional Sections. Use level on each section as tie rod bolts are drawn up.

12

Image 14
Contents Series LC/LCE Table of Contents Using this Manual Special Attention BoxesPreinstallation Accessibility ClearancesChimney or Vent Clearance from Combustible ConstructionCombustion and Ventilation AIR Boiler Setting Foundation LayoutVerify Components Installation SurveyPlanning the Layout Foundation Lengths2A Series LC Shipping List Lwco2B Series LCE Shipping List Interm BackStandard and Optional Jacket Cartons, Top/Side Panels Standard and Optional Sections for Knockdown BoilersStandard and Optional Jacket Cartons, Front/Back Panels 6A Burner Mounting PlatesControl Cartons 6B Burner Mounting PlatesTrim Cartons Assembled Block Boiler Place the BoilerPackaged Boiler Knockdown BoilerApply Silcone Sealant Place the Boiler Series LC Boiler Assembly Right Side View Series LCE Boiler Assembly Right Side View Torque Specification/Procedure ModelLC/LCE Boiler Section Assembly Sequence Tankless Coil Ratings Install Coils or PlatesHydrostatic Test the Boiler Apply Cleanout Cover Plates Install Flue CollarInstall Flue Baffles Install Chamber LinerPipe the Boiler LOW System TemperatureLow Return Temperature Piping, General PreparationSize Header Return Connections@ 20F Output Rise Constant Low Temperature Variable Low TemperatureHigh Flow Rate Piping Multiple Boiler InstallationsChilled Water Systems Piping for Variable Low Temperature Systems, Single Boiler Pipe the Boiler Pipe the Boiler Assemble the Jacket Jacket Assembly Venting Install the BurnerInstall Burner Mounting Plate Burner ApplicationBeckett Carlin Gordon Power Webster Inches Piatt Chamber Burner Front Plate Extension Past Jacket InchesConnect Fuel Piping Install Fuel OIL PipingInstall GAS Supply Piping GeneralSpecific Gravity Multiply Capacity by Pipe LengthPipe Install Drain Valve Install Controls and TrimInstall Safety Relief Valve Install LOW Water CutoffsPipe Tankless Heaters if Used Connect Supply WiringInstall Control Wiring Control and Pipe Tapping Locations Suggested Piping Single Tankless Coil Installation Fill the Boiler Starting the BoilerCheck the Piping RUN Burner CHECK-OUTModel Combustion Chamber Pressure Boiler Draft Loss Check Boiler ControlsTypical Combustion Chamber Pressure and Boiler Draft Loss Maintenance To Shut Down the Boiler Maintenance AnnualPlacing Boiler in Operation Monthly Maintenance Daily MaintenanceBoiler Ratings & Dimensions Series LC/LCE Boiler RatingsSeries LC Dimensional Diagram Series LC/LCE Boiler Dimensions Series LC/LCE Boiler DimensionsRepair Parts Series LC Boiler Assembly1A Series LC Repair Parts Description Part Selection Information Stock Code1B Series LC Repair Parts Series LCE Boiler Assembly 2A Series LCE Repair Parts 2B Series LCE Repair Parts Page Page Series LC/LCE