PB Heat Gas/Oil Boilers manual

Page 53

NOTES

NOTES

51

Image 53
Contents Series LC/LCE Table of Contents Special Attention Boxes Using this ManualAccessibility Clearances PreinstallationChimney or Vent Clearance from Combustible ConstructionCombustion and Ventilation AIR Foundation Layout Boiler SettingPlanning the Layout Installation SurveyVerify Components Foundation LengthsLwco 2A Series LC Shipping ListInterm Back 2B Series LCE Shipping ListStandard and Optional Jacket Cartons, Front/Back Panels Standard and Optional Sections for Knockdown BoilersStandard and Optional Jacket Cartons, Top/Side Panels 6A Burner Mounting PlatesControl Cartons 6B Burner Mounting PlatesTrim Cartons Packaged Boiler Place the BoilerAssembled Block Boiler Knockdown BoilerApply Silcone Sealant Place the Boiler Series LC Boiler Assembly Right Side View Series LCE Boiler Assembly Right Side View Model Torque Specification/ProcedureLC/LCE Boiler Section Assembly Sequence Tankless Coil Ratings Install Coils or PlatesHydrostatic Test the Boiler Install Flue Collar Apply Cleanout Cover PlatesInstall Chamber Liner Install Flue BafflesLow Return Temperature Piping, General LOW System TemperaturePipe the Boiler PreparationSize Header Return Connections@ 20F Output Rise Variable Low Temperature Constant Low TemperatureHigh Flow Rate Piping Multiple Boiler InstallationsChilled Water Systems Piping for Variable Low Temperature Systems, Single Boiler Pipe the Boiler Pipe the Boiler Assemble the Jacket Jacket Assembly Install Burner Mounting Plate Install the BurnerVenting Burner ApplicationChamber Burner Front Plate Extension Past Jacket Inches Beckett Carlin Gordon Power Webster Inches PiattInstall GAS Supply Piping Install Fuel OIL PipingConnect Fuel Piping GeneralSpecific Gravity Multiply Capacity by Pipe LengthPipe Install Safety Relief Valve Install Controls and TrimInstall Drain Valve Install LOW Water CutoffsPipe Tankless Heaters if Used Connect Supply WiringInstall Control Wiring Control and Pipe Tapping Locations Suggested Piping Single Tankless Coil Installation Check the Piping Starting the BoilerFill the Boiler RUN Burner CHECK-OUTModel Combustion Chamber Pressure Boiler Draft Loss Check Boiler ControlsTypical Combustion Chamber Pressure and Boiler Draft Loss Maintenance To Shut Down the Boiler Maintenance AnnualPlacing Boiler in Operation Daily Maintenance Monthly MaintenanceSeries LC/LCE Boiler Ratings Boiler Ratings & DimensionsSeries LC Dimensional Diagram Series LC/LCE Boiler Dimensions Series LC/LCE Boiler DimensionsSeries LC Boiler Assembly Repair PartsDescription Part Selection Information Stock Code 1A Series LC Repair Parts1B Series LC Repair Parts Series LCE Boiler Assembly 2A Series LCE Repair Parts 2B Series LCE Repair Parts Page Page Series LC/LCE