PIPE THE BOILER

3. PIPE THE BOILER

A.PREPARATION

1.Make sure the boiler has been pressure tested as outlined in “Place the Boiler Sections” in this manual.

2.The Supply and Return piping can be installed before installing the jacket. Use nipples long enough to extend through the jacket.

3.Install a pipe plug or nipple and cap in the 3” tapping in the top of the tapped intermediate section when necessary. Use only the lower side connection, required for return piping as shown.

B.SUPPLY AND RETURN PIPING

1.Always locate the Supply and Return connections as shown in Figure 3.1 and other illustrations in this manual.

2.The suggested supply and return sizing in Table 3.1 and in the “Boiler Ratings and Dimensions” section in this manual is based on a flow rate through the boiler equivalent to a 20°F temperature rise (1 gpm flow for each 10,000 Btu/Hr of boiler output). Using higher flow rates is not recommended. This could cause poor water flow distribution in the boiler.

Lower flow rates (higher temperature rise) are acceptable provided the return temperature to the boiler is at least 130°F on gas boilers and 150°F on oil boilers to prevent condensation of flue gases.

3.Do not reduce the number or size of supply and return connections given in Table 3.1. These are required to control the flow velocities in the boiler and maintain uniform distribution.

4.When the boiler is connected to heating coils located in air handling units, the boiler piping system must be equipped with flow control valves or other automatic devices to prevent gravity circulation of the boiler water during the cooling cycle.

C. LOW SYSTEM TEMPERATURE

1.Low Return Temperature Piping, General

a)When the return temperature from the system will be below 130°F on gas boilers or 150°F on oil boilers for extended periods (heat pump systems, outdoor reset, snow melt, etc.), provide piping and controls to protect the boiler from condensation. Condensation will damage the boiler and will lead to shortened boiler life and maintenance problems.

Figure 3.1: Piping Detail, Supply and Return Connections

20

Image 22
Contents Series LC/LCE Table of Contents Using this Manual Special Attention BoxesPreinstallation Accessibility ClearancesCombustion and Ventilation AIR Clearance from Combustible ConstructionChimney or Vent Boiler Setting Foundation LayoutVerify Components Installation SurveyPlanning the Layout Foundation Lengths2A Series LC Shipping List Lwco2B Series LCE Shipping List Interm BackStandard and Optional Jacket Cartons, Top/Side Panels Standard and Optional Sections for Knockdown BoilersStandard and Optional Jacket Cartons, Front/Back Panels 6A Burner Mounting PlatesTrim Cartons 6B Burner Mounting PlatesControl Cartons Assembled Block Boiler Place the BoilerPackaged Boiler Knockdown BoilerApply Silcone Sealant Place the Boiler Series LC Boiler Assembly Right Side View Series LCE Boiler Assembly Right Side View Torque Specification/Procedure ModelLC/LCE Boiler Section Assembly Sequence Hydrostatic Test the Boiler Install Coils or PlatesTankless Coil Ratings Apply Cleanout Cover Plates Install Flue CollarInstall Flue Baffles Install Chamber LinerPipe the Boiler LOW System TemperatureLow Return Temperature Piping, General Preparation@ 20F Output Rise Return ConnectionsSize Header Constant Low Temperature Variable Low TemperatureChilled Water Systems Multiple Boiler InstallationsHigh Flow Rate Piping Piping for Variable Low Temperature Systems, Single Boiler Pipe the Boiler Pipe the Boiler Assemble the Jacket Jacket Assembly Venting Install the BurnerInstall Burner Mounting Plate Burner ApplicationBeckett Carlin Gordon Power Webster Inches Piatt Chamber Burner Front Plate Extension Past Jacket InchesConnect Fuel Piping Install Fuel OIL PipingInstall GAS Supply Piping GeneralPipe Pipe LengthSpecific Gravity Multiply Capacity by Install Drain Valve Install Controls and TrimInstall Safety Relief Valve Install LOW Water CutoffsInstall Control Wiring Connect Supply WiringPipe Tankless Heaters if Used Control and Pipe Tapping Locations Suggested Piping Single Tankless Coil Installation Fill the Boiler Starting the BoilerCheck the Piping RUN Burner CHECK-OUTTypical Combustion Chamber Pressure and Boiler Draft Loss Check Boiler ControlsModel Combustion Chamber Pressure Boiler Draft Loss Maintenance Placing Boiler in Operation Maintenance AnnualTo Shut Down the Boiler Monthly Maintenance Daily MaintenanceBoiler Ratings & Dimensions Series LC/LCE Boiler RatingsSeries LC Dimensional Diagram Series LC/LCE Boiler Dimensions Series LC/LCE Boiler DimensionsRepair Parts Series LC Boiler Assembly1A Series LC Repair Parts Description Part Selection Information Stock Code1B Series LC Repair Parts Series LCE Boiler Assembly 2A Series LCE Repair Parts 2B Series LCE Repair Parts Page Page Series LC/LCE