PB Heat Gas/Oil Boilers manual Assemble the Jacket

Page 29

ASSEMBLE THE JACKET

4. ASSEMBLE THE JACKET

A.PREPARE THE PARTS

1.Collect all the jacket cartons: Jacket Front & Back Carton plus Jacket Side & Top Cartons. See the Shipping List in the front of this manual for the jacket cartons required. The cartons contain the jacket parts and screws. The jacket panels are pre- insulated.

2.Remove all needed knockouts from the jacket parts before beginning assembly.

2.Attach the Middle Front Panel and Lower Front Rail in the same manner.

3.Position the Jacket Assembly with the front panels pushed up against the front section. You will need the jacket in this position to install the Burner Front Plate.

D.APPLY JACKET REAR PANEL

1.Attach the Rear Jacket Panel to the Jacket Side Panels with #10 x 1/2" sheet metal screws.

B.APPLY JACKET SIDES AND CORNERS

1.See Figure 4.2 for details.

2.The Side Panels can be used on either side of the boiler.

3.Place the Jacket Side Panels on each side leaned against the Boiler Sections.

4.On Models LC-08 through LC-12, each side uses two panels. Place the panels so the seam is centered on the Tapped Intermediate Section. On LCE models, place panels in the sequence shown in Table 4.1.

5.On boilers with two or more Jacket Side Panels per side, join the panels together with #10 x 1/2" sheet metal screws. Also attach the Jacket Side Panel Reinforcing Angle inside the jacket at the bottom of the seam.

6.Attach the Left Front Corner Panel to the Left Side Panel with #10 x 1/2" sheet metal screws.

7.Attach the Right Front Corner Panel to the Right Side Panel with #10 x 1/2" sheet metal screws.

C.APPLY JACKET FRONT PANELS

1.Attach the Upper Front Panel to the Right and Left Front Corner Panels with #10 x 1/2" sheet metal screws.

Table 4.1: Jacket Top & Side Panel Placement

 

Locate Jacket Top and Side Panels in

 

 

 

the Position Below

 

Model

 

(Numbers are from Rear to Front)

 

 

 

 

 

 

5

 

4

3

2

1

 

 

 

(Front)

(Rear)

 

 

 

 

 

 

 

 

 

 

 

LCE-13

 

E

B

A

LCE-14

 

E

B

B

LCE-15

 

E

B

C

LCE-16

 

E

C

C

LCE-17

 

E

A

B

B

LCE-18

 

E

B

B

B

LCE-19

 

E

C

B

B

LCE-20

E

 

A

A

B

B

LCE-21

E

 

A

B

B

B

LCE-22

E

 

B

B

B

B

LCE-23

E

 

B

B

B

C

LCE-24

E

 

C

B

B

C

 

 

 

 

 

 

 

E.APPLY JACKET TOP PANELS

1.Attach the Top Front Panel to the Sides and Upper Front Panel with #10 x 1/2" sheet metal screws.

2.Models LC-08 through LC-12 use two Jacket Top Panels. Place them on top with the seam at the same point as the side panels. Join them at their seam with #10 x 1/2" sheet metal screws. On LCE models, place panels in the sequence shown in Table 4.1.

3.Attach the Jacket Top Panel to the Jacket Top Front Panel with #10 x 1/2" sheet metal screws.

4.Attach the Top Rear Panel to the Jacket Top Panel with #10 x 1/2" sheet metal screws.

5.Finish by placing #10 x 1/2" sheet metal screws in the remaining holes along the Jacket Top Panel flanges, into the Jacket Side Panels.

F.APPLY PLATES AND LABELS

1.Mount Boiler Rating Plates and Agency Plates on the Upper Jacket Front Panel as shown in Figure 4.1.

2.Secure metal plates with #6 x 1/4" sheet metal screws. Apply all adhesive-backed labels.

Figure 4.1: Location of Rating, Agency and

Instruction Plates on Jacket Front

Top Panel

27

Image 29
Contents Series LC/LCE Table of Contents Special Attention Boxes Using this ManualAccessibility Clearances PreinstallationChimney or Vent Clearance from Combustible ConstructionCombustion and Ventilation AIR Foundation Layout Boiler SettingPlanning the Layout Installation SurveyVerify Components Foundation LengthsLwco 2A Series LC Shipping ListInterm Back 2B Series LCE Shipping ListStandard and Optional Jacket Cartons, Front/Back Panels Standard and Optional Sections for Knockdown BoilersStandard and Optional Jacket Cartons, Top/Side Panels 6A Burner Mounting PlatesControl Cartons 6B Burner Mounting PlatesTrim Cartons Packaged Boiler Place the BoilerAssembled Block Boiler Knockdown BoilerApply Silcone Sealant Place the Boiler Series LC Boiler Assembly Right Side View Series LCE Boiler Assembly Right Side View Model Torque Specification/ProcedureLC/LCE Boiler Section Assembly Sequence Tankless Coil Ratings Install Coils or PlatesHydrostatic Test the Boiler Install Flue Collar Apply Cleanout Cover PlatesInstall Chamber Liner Install Flue BafflesLow Return Temperature Piping, General LOW System TemperaturePipe the Boiler PreparationSize Header Return Connections@ 20F Output Rise Variable Low Temperature Constant Low TemperatureHigh Flow Rate Piping Multiple Boiler InstallationsChilled Water Systems Piping for Variable Low Temperature Systems, Single Boiler Pipe the Boiler Pipe the Boiler Assemble the Jacket Jacket Assembly Install Burner Mounting Plate Install the BurnerVenting Burner ApplicationChamber Burner Front Plate Extension Past Jacket Inches Beckett Carlin Gordon Power Webster Inches PiattInstall GAS Supply Piping Install Fuel OIL PipingConnect Fuel Piping GeneralSpecific Gravity Multiply Capacity by Pipe LengthPipe Install Safety Relief Valve Install Controls and TrimInstall Drain Valve Install LOW Water CutoffsPipe Tankless Heaters if Used Connect Supply WiringInstall Control Wiring Control and Pipe Tapping Locations Suggested Piping Single Tankless Coil Installation Check the Piping Starting the BoilerFill the Boiler RUN Burner CHECK-OUTModel Combustion Chamber Pressure Boiler Draft Loss Check Boiler ControlsTypical Combustion Chamber Pressure and Boiler Draft Loss Maintenance To Shut Down the Boiler Maintenance AnnualPlacing Boiler in Operation Daily Maintenance Monthly MaintenanceSeries LC/LCE Boiler Ratings Boiler Ratings & DimensionsSeries LC Dimensional Diagram Series LC/LCE Boiler Dimensions Series LC/LCE Boiler DimensionsSeries LC Boiler Assembly Repair PartsDescription Part Selection Information Stock Code 1A Series LC Repair Parts1B Series LC Repair Parts Series LCE Boiler Assembly 2A Series LCE Repair Parts 2B Series LCE Repair Parts Page Page Series LC/LCE