TABLE OF CONTENTS
TABLE OF CONTENTS
USING THIS MANUAL | 1 |
A. INSTRUCTION MANUALS | .1 |
B. SPECIAL ATTENTION BOXES | .1 |
1. PREINSTALLATION | 2 |
A. ACCESSIBILITY CLEARANCES . . . . . . . . . . .2
B. CLEARANCE FROM COMBUSTIBLE CONSTRUCTION . . . . . . . . . . . . . . . . . . . . . .3
C. COMBUSTION AND VENTILATION AIR . . . .3 D. CHIMNEY OR VENT . . . . . . . . . . . . . . . . . . . .3 E. BOILER SETTING . . . . . . . . . . . . . . . . . . . . . .4 F. INSTALLATION SURVEY . . . . . . . . . . . . . . . .5 G. PLANNING THE LAYOUT . . . . . . . . . . . . . . . .5 H. VERIFY COMPONENTS . . . . . . . . . . . . . . . . .5
2. PLACE THE BOILER | 10 |
A. PACKAGED BOILER . . . . . . . . . . . . . . . . . . .10 B. ASSEMBLED BLOCK BOILER . . . . . . . . . . .10
C. KNOCKDOWN BOILER – PLACING
THE SECTIONS . . . . . . . . . . . . . . . . . . . . . .10 D. INSTALL COILS OR PLATES . . . . . . . . . . . .17 E. HYDROSTATIC TEST THE BOILER . . . . . . .17 F. APPLY CLEANOUT COVER PLATES . . . . . .18 G. INSTALL FLUE COLLAR . . . . . . . . . . . . . . . .18 H. INSTALL FLUE BAFFLES . . . . . . . . . . . . . . .19 I. INSTALL CHAMBER LINER . . . . . . . . . . . . .19
3. PIPE THE BOILER | 20 |
A. PREPARATION . . . . . . . . . . . . . . . . . . . . . . .20 B. SUPPLY AND RETURN PIPING . . . . . . . . . .20 C. LOW SYSTEM TEMPERATURE . . . . . . . . . .20 D. CHILLED WATER SYSTEMS . . . . . . . . . . . .23 E. HIGH FLOW RATE PIPING . . . . . . . . . . . . . .23 F. MULTIPLE BOILER INSTALLATIONS . . . . . .23
4. ASSEMBLE THE JACKET | 27 |
A. PREPARE THE PARTS . . . . . . . . . . . . . . . . .27
B. APPLY JACKET SIDES AND CORNERS . . .27 C. APPLY JACKET FRONT PANELS . . . . . . . . .27 D. APPLY JACKET REAR PANEL . . . . . . . . . . .27 E. APPLY JACKET TOP PANELS . . . . . . . . . . .27 F. APPLY PLATES AND LABELS . . . . . . . . . . .27
5. | VENTING | 29 |
6. | INSTALL THE BURNER | 29 |
A. BURNER APPLICATION . . . . . . . . . . . . . . . .29 B. INSTALL BURNER MOUNTING PLATE . . . .29 C. MOUNT THE BURNER . . . . . . . . . . . . . . . . .29
7. CONNECT FUEL PIPING | 31 |
A. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . .31 B. INSTALL FUEL OIL PIPING . . . . . . . . . . . . .31 C. INSTALL GAS SUPPLY PIPING . . . . . . . . . .31 D. TEST GAS SUPPLY PIPING . . . . . . . . . . . . .31
8. INSTALL CONTROLS AND TRIM | 33 |
A. INSTALL SAFETY RELIEF VALVE . . . . . . . .33 B. INSTALL DRAIN VALVE . . . . . . . . . . . . . . . .33 C. INSTALL LOW WATER COUTOUT(S) . . . . .33 D. INSTALL CONTROLS & TRIM . . . . . . . . . . .33 E. PIPE TANKLESS HEATERS IF USED . . . . . .34 F. CONNECT SUPPLY WIRING . . . . . . . . . . . .34 G. INSTALL CONTROL WIRING . . . . . . . . . . . .34
9. STARTING THE BOILER | 37 |
A. CHECK THE PIPING . . . . . . . . . . . . . . . . . . .37 B. FILL THE BOILER . . . . . . . . . . . . . . . . . . . . .37 C. RUN BURNER
10. MAINTENANCE | 39 |
A. PLACING BOILER IN OPERATION . . . . . . . .40 B. TO SHUT DOWN THE BOILER . . . . . . . . . .40 C. MAINTENANCE – ANNUAL . . . . . . . . . . . . .40 D. MONTHLY MAINTENANCE . . . . . . . . . . . . .41 E. DAILY MAINTENANCE . . . . . . . . . . . . . . . . .41
11. BOILER RATINGS & DIMENSIONS | 42 |
12. REPAIR PARTS | 45 |
A SERIES LC BOILER ASSEMBLY . . . . . . . . .45 B. SERIES LCE BOILER ASSEMBLY . . . . . . . .48