PB Heat Gas/Oil Boilers manual 2A Series LCE Repair Parts

Page 51

REPAIR PARTS

Table 12.2A: Series LCE Repair Parts

Item

No.

Description

Part Selection Information

Stock Code

1

Front Section

See Table for Stock Code

 

 

 

 

2

Top Flue Outlet Intermediate Section

 

 

 

 

 

 

Intermediate Section w/1" Tapping

 

 

 

 

 

3

Intermediate Section

 

 

 

 

 

4

Back Section (Closed Back)

 

86022

 

 

 

 

 

Back Section w/Tankless Coil Opening

 

86036

 

 

 

 

5

Tapped Intermediate Section

 

86008

 

 

 

 

 

Upper Flow Port Gasket

2 Required per Flueway

51671

 

 

 

 

 

Lower Flow Port Gasket

1 Required per Flueway

51672

 

 

 

 

6

Tie Rod

4 Required per Flueway

51721

 

 

 

 

 

5/8" Diameter High Temp Rope

13 Feet Required per Flueway

55723

 

 

 

 

7

Ceramic Fiber Base Liner

For All LCE Boilers

50862

 

 

 

 

8

Ceramic Fiber Target Wall

 

50854

 

 

 

 

9

Front Cleanout Plate (C.I.)

 

51162

 

 

 

 

10

5/16"-18 x 1-1/4" Studs w/Brass Nuts

4 Required

 

 

 

 

 

11

Steel Cover Plate

 

51776

 

 

 

 

12

Steel Cover Plate

 

51777

 

 

 

 

13

Tankless Heater Location 1

Specify Heater Model Number

 

 

 

 

 

14

Tankless Heater Location 2

Specify Heater Model Number

 

 

 

 

 

15

Tankless Heater Location 3

Not Used on Water

 

 

 

 

 

16

Rubber Gasket

Specify Quantity

51800

 

 

 

 

17

3/8"-16 x 3/4" SS Hex Head Cap Screw

Specify Quantity

 

 

 

 

 

18

Rear Observation Assembly

 

90923

 

 

 

 

19

5/16"-18 x 3/4" Hex Head Cap Screw

Specify Quantity

 

 

 

 

 

20

Burner Mounting Plate

Specify Burner Model

 

 

 

 

 

21

3/8"-16 x 2-1/4" Studs with Nuts

7 Required

 

 

 

 

 

22

Front Observation Assembly

 

90922

 

 

 

 

23

3/8"-16 x 1" Studs for Burner Mounting

4 Required

 

 

 

 

 

24

1/4"-20 x 1/2" Hex Head Machine Screw

4 Required

 

 

 

 

 

25

Cleanout Cover Plate (Steel)

1 Required per Flueway

51772

 

 

 

 

26

Rear Flue Cover Plate

For All LCE Boilers

51131

 

 

 

 

27

Rear Flue Cover Stud 5/16"-18 x 1-1/2"

5 Required

 

 

 

 

 

28

Rear Flue Cover Hi Temp Rope, 1/4" Dia. x 65" Long

 

 

 

 

 

 

29

Side Jacket Panel LC-6000

For Models LCE-13, -17, -20 & -21

 

 

 

 

 

 

Side Jacket Panel LC-6001

For Models LCE-13 to LCE-15, LCE-17 to LCE-24

 

 

 

 

 

 

Side Jacket Panel LC-6002

For All LCE Boilers

 

 

 

 

 

30

Left Front Jacket Corner Panel LC-6011

 

 

 

 

 

 

31

Right Front Jacket Corner Panel LC-6010

 

 

 

 

 

 

32

Upper Front Jacket Panel LC-6007

 

 

33

Middle Front Jacket Panel LC-6008

 

 

 

 

 

 

34

Lower Front Jacket Rail LC-6009

 

 

 

 

 

 

35

Back Jacket Panel LC-6012

 

 

36

Side Jacket Panel Support Angle LC-6014

 

 

 

 

 

 

37

Front Top Jacket Panel LC-6005

 

 

 

 

 

 

38

Top Jacket Panel LC-6004

For Models LCE-13, -17, -20 & -21

 

 

Top Jacket Panel LC-6004-1

For Models LCE-13 to LCE-15, LCE-17 to LCE-24

 

 

 

 

 

49

Image 51
Contents Series LC/LCE Table of Contents Special Attention Boxes Using this ManualAccessibility Clearances PreinstallationClearance from Combustible Construction Combustion and Ventilation AIRChimney or Vent Foundation Layout Boiler SettingFoundation Lengths Installation SurveyPlanning the Layout Verify ComponentsLwco 2A Series LC Shipping ListInterm Back 2B Series LCE Shipping List6A Burner Mounting Plates Standard and Optional Sections for Knockdown BoilersStandard and Optional Jacket Cartons, Front/Back Panels Standard and Optional Jacket Cartons, Top/Side Panels6B Burner Mounting Plates Trim CartonsControl Cartons Knockdown Boiler Place the BoilerPackaged Boiler Assembled Block BoilerApply Silcone Sealant Place the Boiler Series LC Boiler Assembly Right Side View Series LCE Boiler Assembly Right Side View Model Torque Specification/ProcedureLC/LCE Boiler Section Assembly Sequence Install Coils or Plates Hydrostatic Test the BoilerTankless Coil Ratings Install Flue Collar Apply Cleanout Cover PlatesInstall Chamber Liner Install Flue BafflesPreparation LOW System TemperatureLow Return Temperature Piping, General Pipe the BoilerReturn Connections @ 20F Output RiseSize Header Variable Low Temperature Constant Low TemperatureMultiple Boiler Installations Chilled Water SystemsHigh Flow Rate Piping Piping for Variable Low Temperature Systems, Single Boiler Pipe the Boiler Pipe the Boiler Assemble the Jacket Jacket Assembly Burner Application Install the BurnerInstall Burner Mounting Plate VentingChamber Burner Front Plate Extension Past Jacket Inches Beckett Carlin Gordon Power Webster Inches PiattGeneral Install Fuel OIL PipingInstall GAS Supply Piping Connect Fuel PipingPipe Length PipeSpecific Gravity Multiply Capacity by Install LOW Water Cutoffs Install Controls and TrimInstall Safety Relief Valve Install Drain ValveConnect Supply Wiring Install Control WiringPipe Tankless Heaters if Used Control and Pipe Tapping Locations Suggested Piping Single Tankless Coil Installation RUN Burner CHECK-OUT Starting the BoilerCheck the Piping Fill the BoilerCheck Boiler Controls Typical Combustion Chamber Pressure and Boiler Draft LossModel Combustion Chamber Pressure Boiler Draft Loss Maintenance Maintenance Annual Placing Boiler in OperationTo Shut Down the Boiler Daily Maintenance Monthly MaintenanceSeries LC/LCE Boiler Ratings Boiler Ratings & DimensionsSeries LC Dimensional Diagram Series LC/LCE Boiler Dimensions Series LC/LCE Boiler DimensionsSeries LC Boiler Assembly Repair PartsDescription Part Selection Information Stock Code 1A Series LC Repair Parts1B Series LC Repair Parts Series LCE Boiler Assembly 2A Series LCE Repair Parts 2B Series LCE Repair Parts Page Page Series LC/LCE