PB Heat Gas/Oil Boilers manual 1A Series LC Repair Parts

Page 48

REPAIR PARTS

Table 12.1A: Series LC Repair Parts

Item

No.

Description

Part Selection Information

Stock Code

1

Front Section

See Table 3 for Stock Code

 

 

 

 

2

Intermediate Section w/1" Tapping

See Table 3 for Stock Code

 

 

 

 

3

Intermediate Section

See Table 3 for Stock Code

 

 

 

 

4

Back Section

See Table 3 for Stock Code

 

 

 

 

5

Tapped Intermediate Section

See Table 3 for Stock Code

 

 

 

 

 

 

Upper Flow Port Gasket

2

Required per Flueway

51671

 

 

 

 

 

 

Lower Flow Port Gasket

1

Required per Flueway

51672

 

 

 

 

 

6

Tie Rod

4

Required per Flueway

51721

 

 

 

 

 

5/8" Diameter High Temp Rope

13 Feet Required per Flueway

55723

 

 

 

 

7

Ceramic Fiber Base Liner

Models LC-04 through LC-12

50862

 

 

 

 

 

8

Ceramic Fiber Target Wall

 

 

50854

 

 

 

 

 

9

Front Cleanout Plate (C.I.)

 

 

51162

 

 

 

 

 

10

5/16"-18 x 1-1/4" Studs w/Brass Nuts

4

Required

 

 

 

 

 

 

11

Steel Cover Plate

 

 

51776

 

 

 

 

 

12

Steel Cover Plate

 

 

51777

 

 

 

 

13

Tankless Heater Location 1

Specify Heater Model Number

 

 

 

 

 

14

Tankless Heater Location 2

Specify Heater Model Number

 

 

 

 

 

16

Rubber Gasket

Specify Quantity

51800

 

 

 

 

17

3/8"-16 x 3/4" SS Hex Head Cap Screw

Specify Quantity

 

 

 

 

 

 

18

Rear Observation Assembly

 

 

90923

 

 

 

 

19

5/16"-18 x 3/4" Hex Head Cap Screw

Specify Quantity

 

 

 

 

 

20

Burner Mounting Plate

Specify Burner Model

 

 

 

 

 

 

21

3/8"-16 x 2-1/4" Studs with Nuts

7

Required

 

 

 

 

 

 

22

Flame Observation Assembly

 

 

90922

 

 

 

 

 

23

3/8"-16 x 1" Studs for Burner Mounting

4

Required

 

 

 

 

 

 

24

1/4"-20 x 1/2" Hex Head Machine Screw

4

Required

 

 

 

 

 

 

25

Cleanout Cover Plate (Steel)

1

Required per Flueway

51772

 

 

 

 

26

Rear Flue Box w/9" Flue Outlet

Models LC-04 and LC-05

86040

 

 

 

 

 

Rear Flue Box w/10" Flue Outlet

Models LC-06, LC-07 and LC-08

86041

 

 

 

 

 

Rear Flue Box w/12" Flue Outlet

Models LC-09, LC-10, LC-11 and LC-12

86042

 

 

 

 

 

27

Rear Flue Box Stud 5/16"-18 x 1-1/2"

7

Required

 

 

 

 

 

 

28

Rear Flue Box Hi Temp Rope, 1/4" Diameter x 65" Long

 

 

 

 

 

 

 

29

Side Jacket Panel LC-6000

For Models LC-04 and LC-08

 

 

 

 

 

 

Side Jacket Panel LC-6001

For Models LC-05, LC-08, LC-09 and LC-10

 

 

 

 

 

 

Side Jacket Panel LC-6002

For Models LC-06, LC-10, LC-11 and LC-12

 

 

 

 

 

 

Side Jacket Panel LC-6003

For Models LC-07 and LC-12

 

 

 

 

 

 

30

Left Front Jacket Corner Panel LC-6011

 

 

 

 

 

 

 

 

31

Right Front Jacket Corner Panel LC-6010

 

 

 

 

 

 

 

 

32

Upper Front Jacket Panel LC-6007

 

 

 

33

Middle Front Jacket Panel LC-6008

 

 

 

 

 

 

 

 

34

Lower Front Jacket Rail LC-6009

 

 

 

 

 

 

 

 

35

Back Jacket Panel LC-6012

 

 

 

36

Side Jacket Panel Support Angle LC-6014

 

 

 

 

 

 

 

 

37

Front Top Jacket Panel LC-6005

 

 

 

 

 

 

 

 

46

Image 48
Contents Series LC/LCE Table of Contents Using this Manual Special Attention BoxesPreinstallation Accessibility ClearancesClearance from Combustible Construction Combustion and Ventilation AIRChimney or Vent Boiler Setting Foundation LayoutInstallation Survey Planning the LayoutVerify Components Foundation Lengths2A Series LC Shipping List Lwco2B Series LCE Shipping List Interm BackStandard and Optional Sections for Knockdown Boilers Standard and Optional Jacket Cartons, Front/Back PanelsStandard and Optional Jacket Cartons, Top/Side Panels 6A Burner Mounting Plates6B Burner Mounting Plates Trim CartonsControl Cartons Place the Boiler Packaged BoilerAssembled Block Boiler Knockdown BoilerApply Silcone Sealant Place the Boiler Series LC Boiler Assembly Right Side View Series LCE Boiler Assembly Right Side View Torque Specification/Procedure ModelLC/LCE Boiler Section Assembly Sequence Install Coils or Plates Hydrostatic Test the BoilerTankless Coil Ratings Apply Cleanout Cover Plates Install Flue CollarInstall Flue Baffles Install Chamber LinerLOW System Temperature Low Return Temperature Piping, GeneralPipe the Boiler PreparationReturn Connections @ 20F Output RiseSize Header Constant Low Temperature Variable Low TemperatureMultiple Boiler Installations Chilled Water SystemsHigh Flow Rate Piping Piping for Variable Low Temperature Systems, Single Boiler Pipe the Boiler Pipe the Boiler Assemble the Jacket Jacket Assembly Install the Burner Install Burner Mounting PlateVenting Burner ApplicationBeckett Carlin Gordon Power Webster Inches Piatt Chamber Burner Front Plate Extension Past Jacket InchesInstall Fuel OIL Piping Install GAS Supply PipingConnect Fuel Piping GeneralPipe Length PipeSpecific Gravity Multiply Capacity by Install Controls and Trim Install Safety Relief ValveInstall Drain Valve Install LOW Water CutoffsConnect Supply Wiring Install Control WiringPipe Tankless Heaters if Used Control and Pipe Tapping Locations Suggested Piping Single Tankless Coil Installation Starting the Boiler Check the PipingFill the Boiler RUN Burner CHECK-OUTCheck Boiler Controls Typical Combustion Chamber Pressure and Boiler Draft LossModel Combustion Chamber Pressure Boiler Draft Loss Maintenance Maintenance Annual Placing Boiler in OperationTo Shut Down the Boiler Monthly Maintenance Daily MaintenanceBoiler Ratings & Dimensions Series LC/LCE Boiler RatingsSeries LC Dimensional Diagram Series LC/LCE Boiler Dimensions Series LC/LCE Boiler DimensionsRepair Parts Series LC Boiler Assembly1A Series LC Repair Parts Description Part Selection Information Stock Code1B Series LC Repair Parts Series LCE Boiler Assembly 2A Series LCE Repair Parts 2B Series LCE Repair Parts Page Page Series LC/LCE