PB Heat Gas/Oil Boilers manual Control and Pipe Tapping Locations

Page 37

INSTALL CONTROLS AND TRIM

Figure 8.2: Control and Pipe Tapping Locations

35

Image 37
Contents Series LC/LCE Table of Contents Special Attention Boxes Using this ManualAccessibility Clearances PreinstallationCombustion and Ventilation AIR Clearance from Combustible ConstructionChimney or Vent Foundation Layout Boiler SettingPlanning the Layout Installation SurveyVerify Components Foundation LengthsLwco 2A Series LC Shipping ListInterm Back 2B Series LCE Shipping ListStandard and Optional Jacket Cartons, Front/Back Panels Standard and Optional Sections for Knockdown BoilersStandard and Optional Jacket Cartons, Top/Side Panels 6A Burner Mounting PlatesTrim Cartons 6B Burner Mounting PlatesControl Cartons Packaged Boiler Place the BoilerAssembled Block Boiler Knockdown BoilerApply Silcone Sealant Place the Boiler Series LC Boiler Assembly Right Side View Series LCE Boiler Assembly Right Side View Model Torque Specification/ProcedureLC/LCE Boiler Section Assembly Sequence Hydrostatic Test the Boiler Install Coils or PlatesTankless Coil Ratings Install Flue Collar Apply Cleanout Cover PlatesInstall Chamber Liner Install Flue BafflesLow Return Temperature Piping, General LOW System TemperaturePipe the Boiler Preparation@ 20F Output Rise Return ConnectionsSize Header Variable Low Temperature Constant Low TemperatureChilled Water Systems Multiple Boiler InstallationsHigh Flow Rate Piping Piping for Variable Low Temperature Systems, Single Boiler Pipe the Boiler Pipe the Boiler Assemble the Jacket Jacket Assembly Install Burner Mounting Plate Install the BurnerVenting Burner ApplicationChamber Burner Front Plate Extension Past Jacket Inches Beckett Carlin Gordon Power Webster Inches PiattInstall GAS Supply Piping Install Fuel OIL PipingConnect Fuel Piping GeneralPipe Pipe LengthSpecific Gravity Multiply Capacity by Install Safety Relief Valve Install Controls and TrimInstall Drain Valve Install LOW Water CutoffsInstall Control Wiring Connect Supply WiringPipe Tankless Heaters if Used Control and Pipe Tapping Locations Suggested Piping Single Tankless Coil Installation Check the Piping Starting the BoilerFill the Boiler RUN Burner CHECK-OUTTypical Combustion Chamber Pressure and Boiler Draft Loss Check Boiler ControlsModel Combustion Chamber Pressure Boiler Draft Loss Maintenance Placing Boiler in Operation Maintenance AnnualTo Shut Down the Boiler Daily Maintenance Monthly MaintenanceSeries LC/LCE Boiler Ratings Boiler Ratings & DimensionsSeries LC Dimensional Diagram Series LC/LCE Boiler Dimensions Series LC/LCE Boiler DimensionsSeries LC Boiler Assembly Repair PartsDescription Part Selection Information Stock Code 1A Series LC Repair Parts1B Series LC Repair Parts Series LCE Boiler Assembly 2A Series LCE Repair Parts 2B Series LCE Repair Parts Page Page Series LC/LCE