PB Heat Gas/Oil Boilers manual Check Boiler Controls

Page 40

STARTING THE BOILER

4.Adjust the burner as needed for a CO2 reading of:

a)Oil burners: CO2 approximately 12.5% or 1% less than the level at which the smoke reading goes above a trace on the Bacharach scale.

b)Gas burners: 9% to 10% with CO less than 50 ppm.

c)Inspect all flue gas joints (sections, attachments, breeching and vent) for gas tightness. Remove the jacket panels in order to thoroughly inspect all rope seal joints between the sections.

D.CHECK BOILER CONTROLS

1.Limit and Operating Temperature Controls

a)Lower the setting of each control until the burner shuts down.

2.Low Water Cutoffs

a)Test probe type controls by using the Push-to-Test Button.

b)Test float type controls. ASME CSD-1 requires the control to be piped with Test-n-Check valves in order to allow isolation for test.

3.Follow additional instructions in the Burner Manual for proving the burner component operation.

4.Check all controls to make sure they function correctly.

5.After all controls have been proven, set the Operating and High Limit Temperature Controls to the temperatures desired.

Table 9.1: Typical Combustion Chamber Pressure and Boiler Draft Loss

Model

Combustion Chamber Pressure

Boiler Draft Loss

with 0.1” w.c. at Rear Flue Box Test Port

(Inches w.c.)

 

(Inches w.c.)

 

 

 

 

 

LC-04

+ 0.22

0.12

LC-05R

+ 0.22

0.12

LC-05

+ 0.24

0.14

LC-06

+ 0.26

0.16

LC-07

+ 0.27

0.17

LC-08

+ 0.28

0.18

LC-09

+ 0.29

0.19

LC-10

+ 0.30

0.20

LC-11

+ 0.31

0.21

LC-12

+ 0.32

0.22

LCE-13

+ 0.24

0.14

LCE-14

+ 0.25

0.15

LCE-15

+ 0.26

0.16

LCE-16

+ 0.27

0.17

LCE-17

+ 0.28

0.18

LCE-18

+ 0.29

0.19

LCE-19

+ 0.30

0.20

LCE-20

+ 0.31

0.21

LCE-21

+ 0.31

0.21

LCE-22

+ 0.31

0.21

LCE-23

+ 0.32

0.22

LCE-24

+ 0.32

0.22

 

 

 

NOTE: Actual chamber pressure and draft loss readings may vary with each boiler and installation due to variation in the heat exchanger, deposits in the flueways, actual burner firing rate and excess air conditions. Use the above numbers as a general guide only. If the measured draft loss is considerably higher than the above, check the flueways for deposits and confirm the burner firing rate.

38

Image 40
Contents Series LC/LCE Table of Contents Using this Manual Special Attention BoxesPreinstallation Accessibility ClearancesCombustion and Ventilation AIR Clearance from Combustible ConstructionChimney or Vent Boiler Setting Foundation LayoutInstallation Survey Planning the LayoutVerify Components Foundation Lengths2A Series LC Shipping List Lwco2B Series LCE Shipping List Interm BackStandard and Optional Sections for Knockdown Boilers Standard and Optional Jacket Cartons, Front/Back PanelsStandard and Optional Jacket Cartons, Top/Side Panels 6A Burner Mounting PlatesTrim Cartons 6B Burner Mounting PlatesControl Cartons Place the Boiler Packaged BoilerAssembled Block Boiler Knockdown BoilerApply Silcone Sealant Place the Boiler Series LC Boiler Assembly Right Side View Series LCE Boiler Assembly Right Side View Torque Specification/Procedure ModelLC/LCE Boiler Section Assembly Sequence Hydrostatic Test the Boiler Install Coils or PlatesTankless Coil Ratings Apply Cleanout Cover Plates Install Flue CollarInstall Flue Baffles Install Chamber LinerLOW System Temperature Low Return Temperature Piping, GeneralPipe the Boiler Preparation@ 20F Output Rise Return ConnectionsSize Header Constant Low Temperature Variable Low TemperatureChilled Water Systems Multiple Boiler InstallationsHigh Flow Rate Piping Piping for Variable Low Temperature Systems, Single Boiler Pipe the Boiler Pipe the Boiler Assemble the Jacket Jacket Assembly Install the Burner Install Burner Mounting PlateVenting Burner ApplicationBeckett Carlin Gordon Power Webster Inches Piatt Chamber Burner Front Plate Extension Past Jacket InchesInstall Fuel OIL Piping Install GAS Supply PipingConnect Fuel Piping GeneralPipe Pipe LengthSpecific Gravity Multiply Capacity by Install Controls and Trim Install Safety Relief ValveInstall Drain Valve Install LOW Water CutoffsInstall Control Wiring Connect Supply WiringPipe Tankless Heaters if Used Control and Pipe Tapping Locations Suggested Piping Single Tankless Coil Installation Starting the Boiler Check the PipingFill the Boiler RUN Burner CHECK-OUTTypical Combustion Chamber Pressure and Boiler Draft Loss Check Boiler ControlsModel Combustion Chamber Pressure Boiler Draft Loss Maintenance Placing Boiler in Operation Maintenance AnnualTo Shut Down the Boiler Monthly Maintenance Daily MaintenanceBoiler Ratings & Dimensions Series LC/LCE Boiler RatingsSeries LC Dimensional Diagram Series LC/LCE Boiler Dimensions Series LC/LCE Boiler DimensionsRepair Parts Series LC Boiler Assembly1A Series LC Repair Parts Description Part Selection Information Stock Code1B Series LC Repair Parts Series LCE Boiler Assembly 2A Series LCE Repair Parts 2B Series LCE Repair Parts Page Page Series LC/LCE