Burnham K50 manual

Page 40

“THERMOCOUPLE CONTROL SYSTEM”

CANADA ONLY

Fig. 38

PILOT PIPING

THERMOCOUPLE CONTROL SYSTEM

CANADA ONLY

Fig. 39

NOTE - TWO PILOT SAFETY SWITCHES REQUIRED ON 15 SECT. AND LARGER BOILERS.

INSTALLATION OF PILOT SAFETY SWITCH THERMOCOUPLE CONTROL SYSTEM

safety switch on bracket using two #10-32 x ½” MS. “IN” on pilot safety switch should be pointed in the direction of the Gas Train to which the pilot safety switch is to be connected, see Figure 39.

Using ¼” OD aluminum tubing, connect the pilot shutoff valve installed in the manual shutoff valve

in the gas train, to the inlet of the RV-12LT regulator (packed in Gas Train Carton). Regulator should be above Gas Train and near front of boiler, see Figure 38. Install 3/8” tee into outlet of regulator (USA boilers) and, using ¼” OD aluminum tubing, connect outlet of tee to “IN” connection on pilot safety switch, see Figure 38.

Using ¼” OD aluminum tubing, connect the outlet of the pilot safety switch to the tubing or fitting connected to the pilot burner, see Figure 38.

Connect Q309 thermocouple to pilot safety switch.

Connect power supply fused disconnect switch, service switch, primary and secondary of

Gas Valve Transformer, gas valves, and other controls - see Figure 55 or 56 for wiring type and connections to be made. All wiring must be adequately supported and strain relief provided.

All wiring including ground connections must comply with the requirements of the authority having jurisdiction and, in the absence of such to the National Electrical Code, ANSI NFPA No. 70- 2005.

2.INSTALLATION OF GAS VALVE TRANSFORMER AND COMPLETION OF WIRING - Attach the bracket for mounting of the junction box to the lower front corner of the Jacket

40

Image 40
Contents Series 5B Section I Equipment Check List Important Information Canadian Equipment Check List Canadian Equipment Check List Dimensional Data Natural GAS Maximum 14 W.C. Minimum 5.5 W.CDo not Install this Boiler on Carpeting Provide Combustion and Ventilation AIRBASE-BURNER-MANIFOLD Assemblys Single Manifold Base 5006B Thru 5014B Section BoilersLEH Section on Base Assembly of Center Sections Dual Manifold Bases 5015B Thru 5026B Section BoilersArrangement of Sections and Canopys Open Steam or Water Trim Carton Purpose of Tappings and Their LocationsTesting Boiler Assembly for Leaks Installation of BUILT-IN HeaterConnect Supply and Return Piping to Heating System Attachment of Flue Covers Sealing of BASE, Installation Flue Covers and CanopiesOxygen Corrosion Page Page Page Page Recommended Water Boiler Piping Supply Connection & I Return ConnectionSupply Connections & 2 Return Connections Sizes 5006B Thru 5019BInstallation of Jacket Parts Common to ALL Boiler Sizes Installation of Jacket Support Brackets to Base END PanelsPage Exploded View of Jacket 6 Thru 10 Section Boilers Securing of CANOPY/DRAFTHOOD CANOPY/DRAFTHOOD Mounting Diagram Exploded View of Jacket 11 Thru 19 SECT. Boilers Completion of Jacket Installation 11 Thru 26 Section Boilers Exploded View of Jacket 20 Thru 22 SECT. Boilers Exploded View of Jacket 26 SECT. Boilers Shutoff Valve Between Safety Valve Steam Trim and ControlsMounting Elevations of M&M 150 and a 67M Float Lwco Water Trim and Controls Recommended Piping to BUILT-IN Tankless Heaters Open GAS Train CartonsOpen Gas Controls Cartons Installation of S8610M Module Pilot Piping EI Control System Robertshaw7000 A B Thru 5009BPilot Piping EI Control System V88A A B Thru 5026B NAT. GAS Canada 5006B Thru 5026B NAT. GASInstallation of Pilot Safety Switch EO Control System Installation of Pilot Safety SwitchPilot Piping EO Control System Installation of EO and EE Mounting Bracket and Controls EE Control SystemSect. and larger boilers Pilot Piping EE Control SystemInstallation of Pilot Safety Switch EOP Control System Pilot Piping EOP Control SystemEEP Control System Pilot Piping EEP Control SystemPage Venting Single Vent System Manifold Vent SystemPage Section IV Operation GeneralTable IV Water Content Condensation Control VariationsBe sure power is off when checking high voltage connections A B Thru 5009B Schematic Wiring Diagram EI Control System V88 GAS Train Sequence of OperationA B Thru 5014B Canada 5006B Thru 5014BSchematic wiring diagram 15 Thru 26 SECT. Boilers EI Control SystemSequence of Operation Page Safety Switch Circuit Pilot FailureWiring diagram 6 Thru 14 SECT. Boilers Proceed to Paragraph 15- Minimum Input Wiring diagram 15 Thru 26 SECT. Boilers Operating and safety controls. Should any EE Control System Wiring diagram 15 Thru 26 SECT. Boilers Proceed to Paragraph 15- Minimum Input Wiring Diagram 6 Thru 14 SECT. Boilers EOP Control System Turn on Main Power Switch. Main Power Light will light Wiring Diagram 15 Thru 26 SECT. Boilers EOP Control System Safety Switch Circuit Wiring Diagram 6 Thru 14 SECT. Boilers EEP Control System Pilot Failure Safety Switch Circuit Wiring Diagram 15 Thru 26 SECT. Boilers EEP Control System Make sure all manual resets are activated where applicable Normal Operation Sequence Page Check GAS Input Rate to Boiler Minimum Input Adjustments V8944B Combination ValveMotorized Modulating Actuator ScrewTest Ignition System Safety SHUT-OFF Device AS Follows Thermocouple Pilot System Combustion Chamber BURN-OFFSection V Service Removal of Jacket Front PanelAvoid Breathing Fiber Particulates and Dust Cleaning of Flueways LubricationPilot Locations Main Burner Flame Adjustment Pilot Flame Honeywell Q3481BPilot Flame Honeywell Q179D Pilot w/THERMOCOUPLEPilot Flame Honeywell Q179C Pilot Honeywell Q327A Pilot w/THERMOCOUPLEDo not drain water below gauge glass Base Parts JacketsSeries 5B Base Parts 5006B thru 5014B Number in in Table Relates to Corresponding NumberBase Parts Series 5B Base Parts 5015B thru 5026B 5015B 5016B 5017B 5018B 5019B 5020B 5021B 5022B 5024B 5026BBase Parts Canopy Boiler Size Quantity Part SizeIntegral Canopy Drafthoods & Sections Series 5B Section Replacement Chart Series 5B Base / Pilot Assemblies Series 5B Jackets 60413075 5007B Lower Top Panel 2 x 37-3/16 60413085 5008B 2 x 20-7/8 Complete Jackets Jackets Boiler Size Boiler Size 5006B 5008B 5009B 5014B 5015B 5016B 5017B 5026BV88A GAS Trains Canada Natural GAS only Fluid Power GAS Trains USA 100 5006B 5009B 5015B 5016B 5017B101 Diaphragm Valve LO-HI-LO GAS Train Canada Natural GAS onlyFluid Power GAS Trains Canada 102103 Ignition Module & Support Bracket EI Control System104 Pilot Safety SwitchDescription Manifold Module Support L62GB-3C 105 A. 5010B-5026B NAT. GAS Canada 5006B-5026B NAT. GAS106 Transformer & Pilot Line Regulator EO Control System107 108 109 110 111 EOP & EEP Control PanelEI Control System Pilot Assembly 1126236007 NAT. GAS 113EI GAS 6236003 NAT. GAS 114Not Available for LP Date Service Performed 115Limited Warranty 116