Burnham K50 manual Series 5B Base / Pilot Assemblies

Page 90

90

TABLE 3C

SERIES 5B BASE / PILOT ASSEMBLIES

5006B THRU 5014B BOILERS - SINGLE BASE REQUIRED

(NATURAL GAS)

 

5006B

5007B

5008B

5009B

5010B

5011B

5012B

5013B

5014B

Complete Base Ass’y w/EI Pilot Ass’y

 

618130642 618130742 618130842 618130942 618131042

618131142

618131242

618131342

618131442

Complete Base Ass’y w/EO-EOP Pilot Ass’y

 

61813067

61813077

61813087

61813097

61813107

61813117

61813127

61813137

61813147

Complete Base Ass’y w/EE-EEP Pilot Ass’y

 

618130611 618130711 618130811 618130911 618131011

618131111

618131211

618131311

618131411

Complete Base Ass’y w/Thermocouple Pilot Ass’y

 

618130651

618130751

618130851

618130951

618131051

618131151

618131251

618131351

618131451

(LP GAS)

 

 

 

 

 

 

 

 

 

 

Complete Base Ass’y w/EO-EOP Pilot Ass’y

 

61813069

61813079

61813089

61813099

61813109

61813119

61813129

61813139

61813149

Complete Base Ass’y w/EE-EEP Pilot Ass’y

 

618130631 618130731 618130831 618130931 618131031

618131131

618131231

618131331

618131431

Complete Base Ass’y w/Thermocouple Pilot Ass’y

 

618130661

618130761

618130861

618130961

618131061

618131161

618131261

618131361

618131461

(NATURAL GAS)

5015B

5016B

5017B

5108B

5109B

5020B

5021B

5022B

5024B

5026B

Right Base Subass’y w/EI Pilot Ass’y

618130852 618130952 618131052 618131052 618130952 618131052

618131052

618131052

618131352

618131352

Right Base Subass’y w/EO-EOP Pilot Ass’y

61813088

61813098

61813098

61813108

61813108

61813108

61813108

61813108

61813138

61813138

Right Base Subass’y w/EE-EEP Pilot Ass’y

618130821 618130921 618130921 618131021 618131021 618131021

618131021

618131021

618131321

618131321

Right Base Subass’y w/Thermocouple Pilot Ass’y

618130871 618130971 618130971 618131071 618131071 618131071

618131071

618131071

618131371

618131371

Left Base Subass’y w/EI Pilot Ass’y

618131541 618131641 618131741 618131841 618131941 618132041

618132141

618131052

618131352

618131352

Left Base Subass’y w/EO-EOP Pilot Ass’y

61813155

61813165

61813175

61813185

61813195

61813205

61813215

61813225

61813245

61813265

Left Base Subass’y w/EE-EEP Pilot Ass’y

61813157

61813167

61813177

61813187

61813197

61813207

61813217

61813227

61813247

61813267

Left Base Subass’y w/Thermocouple Pilot Ass’y

61813159

61813169

61813179

61813189

61813199

61813209

61813219

61813229

61813249

61813269

(LP GAS)

 

 

 

 

 

 

 

 

 

 

Right Base Subass’y w/EO-EOP Pilot Ass’y

618130801 618130901 618130901 618131001 618131001 618131001

618131001

618131001

618131301

618131301

Right Base Subass’y w/EE-EEP Pilot Ass’y

618130841 618130941 618130941 618131041 618131041 618131041

618131041

618131041

618131341

618131341

Right Base Subass’y w/Thermocouple Pilot Ass’y

618130881 618130971 618130971 618131071 618131071 618131071

618131071

618131071

618131371

618131371

Left Base Subass’y w/EO-EOP Pilot Ass’y

61813156

61813166

61813176

61813186

61813196

61813206

61813216

61813226

61813246

61813266

Left Base Subass’y w/EE-EEP Pilot Ass’y

61813158

61813168

61813178

61813188

6181398

61813208

61813218

61813228

61813248

61813268

Left Base Subass’y w/Thermocouple Pilot Ass’y

618131511

618131611

618131711

618131811

618131911

618132011

618132111

618132211

618132411

618132611

Image 90
Contents Series 5B Section I Equipment Check List Important Information Canadian Equipment Check List Canadian Equipment Check List Dimensional Data Natural GAS Maximum 14 W.C. Minimum 5.5 W.CDo not Install this Boiler on Carpeting Provide Combustion and Ventilation AIRBASE-BURNER-MANIFOLD Assemblys Single Manifold Base 5006B Thru 5014B Section BoilersLEH Section on Base Assembly of Center Sections Dual Manifold Bases 5015B Thru 5026B Section BoilersArrangement of Sections and Canopys Open Steam or Water Trim Carton Purpose of Tappings and Their LocationsInstallation of BUILT-IN Heater Testing Boiler Assembly for LeaksConnect Supply and Return Piping to Heating System Sealing of BASE, Installation Flue Covers and Canopies Attachment of Flue CoversOxygen Corrosion Page Page Page Page Supply Connections & 2 Return Connections Recommended Water Boiler PipingSupply Connection & I Return Connection Sizes 5006B Thru 5019BInstallation of Jacket Parts Common to ALL Boiler Sizes Installation of Jacket Support Brackets to Base END PanelsPage Exploded View of Jacket 6 Thru 10 Section Boilers Securing of CANOPY/DRAFTHOOD CANOPY/DRAFTHOOD Mounting Diagram Exploded View of Jacket 11 Thru 19 SECT. Boilers Completion of Jacket Installation 11 Thru 26 Section Boilers Exploded View of Jacket 20 Thru 22 SECT. Boilers Exploded View of Jacket 26 SECT. Boilers Shutoff Valve Between Safety Valve Steam Trim and ControlsMounting Elevations of M&M 150 and a 67M Float Lwco Water Trim and Controls Recommended Piping to BUILT-IN Tankless Heaters Open GAS Train CartonsOpen Gas Controls Cartons Installation of S8610M Module Pilot Piping EI Control System Robertshaw7000 A B Thru 5009BPilot Piping EI Control System V88A A B Thru 5026B NAT. GAS Canada 5006B Thru 5026B NAT. GASInstallation of Pilot Safety Switch Installation of Pilot Safety Switch EO Control SystemPilot Piping EO Control System Installation of EO and EE Mounting Bracket and Controls EE Control SystemSect. and larger boilers Pilot Piping EE Control SystemInstallation of Pilot Safety Switch EOP Control System Pilot Piping EOP Control SystemEEP Control System Pilot Piping EEP Control SystemPage Venting Single Vent System Manifold Vent SystemPage Section IV Operation GeneralTable IV Water Content Condensation Control VariationsBe sure power is off when checking high voltage connections A B Thru 5009B A B Thru 5014B Schematic Wiring Diagram EI Control System V88 GAS TrainSequence of Operation Canada 5006B Thru 5014BSchematic wiring diagram 15 Thru 26 SECT. Boilers EI Control SystemSequence of Operation Page Safety Switch Circuit Pilot FailureWiring diagram 6 Thru 14 SECT. Boilers Proceed to Paragraph 15- Minimum Input Wiring diagram 15 Thru 26 SECT. Boilers Operating and safety controls. Should any EE Control System Wiring diagram 15 Thru 26 SECT. Boilers Proceed to Paragraph 15- Minimum Input Wiring Diagram 6 Thru 14 SECT. Boilers EOP Control System Turn on Main Power Switch. Main Power Light will light Wiring Diagram 15 Thru 26 SECT. Boilers EOP Control System Safety Switch Circuit Wiring Diagram 6 Thru 14 SECT. Boilers EEP Control System Pilot Failure Safety Switch Circuit Wiring Diagram 15 Thru 26 SECT. Boilers EEP Control System Make sure all manual resets are activated where applicable Normal Operation Sequence Page Check GAS Input Rate to Boiler Motorized Modulating Actuator Minimum Input AdjustmentsV8944B Combination Valve ScrewTest Ignition System Safety SHUT-OFF Device AS Follows Thermocouple Pilot System Combustion Chamber BURN-OFFSection V Service Removal of Jacket Front PanelAvoid Breathing Fiber Particulates and Dust Cleaning of Flueways LubricationPilot Locations Pilot Flame Main Burner Flame AdjustmentPilot Flame Honeywell Q3481B Honeywell Q179D Pilot w/THERMOCOUPLEPilot Flame Honeywell Q179C Pilot Honeywell Q327A Pilot w/THERMOCOUPLEDo not drain water below gauge glass Base Parts JacketsSeries 5B Base Parts 5006B thru 5014B Number in in Table Relates to Corresponding NumberBase Parts Series 5B Base Parts 5015B thru 5026B 5015B 5016B 5017B 5018B 5019B 5020B 5021B 5022B 5024B 5026BBase Parts Canopy Boiler Size Quantity Part SizeIntegral Canopy Drafthoods & Sections Series 5B Section Replacement Chart Series 5B Base / Pilot Assemblies Series 5B Jackets 60413075 5007B Lower Top Panel 2 x 37-3/16 60413085 5008B 2 x 20-7/8 Complete Jackets Jackets Boiler Size Boiler Size 5006B 5008B 5009B 5014B 5015B 5016B 5017B 5026BV88A GAS Trains Canada Natural GAS only Fluid Power GAS Trains USA 100 5006B 5009B 5015B 5016B 5017B101 Diaphragm Valve LO-HI-LO GAS Train Canada Natural GAS onlyFluid Power GAS Trains Canada 102103 Ignition Module & Support Bracket EI Control SystemPilot Safety Switch 104Description Manifold Module Support L62GB-3C 105 A. 5010B-5026B NAT. GAS Canada 5006B-5026B NAT. GAS106 Transformer & Pilot Line Regulator EO Control System107 108 109 110 111 EOP & EEP Control PanelEI Control System Pilot Assembly 112113 6236007 NAT. GASEI GAS 114 6236003 NAT. GASNot Available for LP Date Service Performed 115Limited Warranty 116