Schematic wiring diagram 15 Thru 26 SECT. Boilers, EI Control System
Install
Warranty
Dimension
BASE-BURNER-MANIFOLD Assemblys
Minimum Input Adjustments
Cleaning of Flueways
Safety
Fluid Power GAS Trains USA
Section V Service
Page 49
49
Fig. 44
SCHEMATIC wiring diagram - 15 THRU 26 SECT. BOILERS
EI CONTROL SYSTEM
Page 48
Page 50
Image 49
Page 48
Page 50
Contents
Series 5B
Section I Equipment Check List
Important Information
Canadian Equipment Check List
Canadian Equipment Check List
Natural GAS Maximum 14 W.C. Minimum 5.5 W.C
Dimensional Data
Provide Combustion and Ventilation AIR
Do not Install this Boiler on Carpeting
Single Manifold Base 5006B Thru 5014B Section Boilers
BASE-BURNER-MANIFOLD Assemblys
Dual Manifold Bases 5015B Thru 5026B Section Boilers
LEH Section on Base Assembly of Center Sections
Arrangement of Sections and Canopys
Purpose of Tappings and Their Locations
Open Steam or Water Trim Carton
Testing Boiler Assembly for Leaks
Installation of BUILT-IN Heater
Connect Supply and Return Piping to Heating System
Attachment of Flue Covers
Sealing of BASE, Installation Flue Covers and Canopies
Oxygen Corrosion
Page
Page
Page
Page
Supply Connection & I Return Connection
Recommended Water Boiler Piping
Supply Connections & 2 Return Connections
Sizes 5006B Thru 5019B
Installation of Jacket Support Brackets to Base END Panels
Installation of Jacket Parts Common to ALL Boiler Sizes
Page
Exploded View of Jacket 6 Thru 10 Section Boilers
Securing of CANOPY/DRAFTHOOD
CANOPY/DRAFTHOOD Mounting Diagram
Exploded View of Jacket 11 Thru 19 SECT. Boilers
Completion of Jacket Installation 11 Thru 26 Section Boilers
Exploded View of Jacket 20 Thru 22 SECT. Boilers
Exploded View of Jacket 26 SECT. Boilers
Steam Trim and Controls
Shutoff Valve Between Safety Valve
Mounting Elevations of M&M 150 and a 67M Float Lwco
Water Trim and Controls
Open GAS Train Cartons
Recommended Piping to BUILT-IN Tankless Heaters
Open Gas Controls Cartons
Pilot Piping EI Control System Robertshaw7000 A B Thru 5009B
Installation of S8610M Module
A B Thru 5026B NAT. GAS Canada 5006B Thru 5026B NAT. GAS
Pilot Piping EI Control System V88A
Installation of Pilot Safety Switch EO Control System
Installation of Pilot Safety Switch
Pilot Piping EO Control System
EE Control System
Installation of EO and EE Mounting Bracket and Controls
Pilot Piping EE Control System
Sect. and larger boilers
Pilot Piping EOP Control System
Installation of Pilot Safety Switch EOP Control System
Pilot Piping EEP Control System
EEP Control System
Page
Single Vent System Manifold Vent System
Venting
Page
General
Section IV Operation
Table IV Water Content
Control Variations
Condensation
Be sure power is off when checking high voltage connections
A B Thru 5009B
Sequence of Operation
Schematic Wiring Diagram EI Control System V88 GAS Train
A B Thru 5014B
Canada 5006B Thru 5014B
EI Control System
Schematic wiring diagram 15 Thru 26 SECT. Boilers
Sequence of Operation
Page
Pilot Failure
Safety Switch Circuit
Wiring diagram 6 Thru 14 SECT. Boilers
Proceed to Paragraph 15- Minimum Input
Wiring diagram 15 Thru 26 SECT. Boilers
Operating and safety controls. Should any
EE Control System
Wiring diagram 15 Thru 26 SECT. Boilers
Proceed to Paragraph 15- Minimum Input
Wiring Diagram 6 Thru 14 SECT. Boilers EOP Control System
Turn on Main Power Switch. Main Power Light will light
Wiring Diagram 15 Thru 26 SECT. Boilers EOP Control System
Safety Switch Circuit
Wiring Diagram 6 Thru 14 SECT. Boilers EEP Control System
Pilot Failure
Safety Switch Circuit
Wiring Diagram 15 Thru 26 SECT. Boilers EEP Control System
Make sure all manual resets are activated where applicable
Normal Operation Sequence
Page
Check GAS Input Rate to Boiler
V8944B Combination Valve
Minimum Input Adjustments
Motorized Modulating Actuator
Screw
Test Ignition System Safety SHUT-OFF Device AS Follows
Combustion Chamber BURN-OFF
Thermocouple Pilot System
Removal of Jacket Front Panel
Section V Service
Avoid Breathing Fiber Particulates and Dust
Lubrication
Cleaning of Flueways
Pilot Locations
Pilot Flame Honeywell Q3481B
Main Burner Flame Adjustment
Pilot Flame
Honeywell Q179D Pilot w/THERMOCOUPLE
Honeywell Q327A Pilot w/THERMOCOUPLE
Pilot Flame Honeywell Q179C Pilot
Do not drain water below gauge glass
Jackets
Base Parts
Number in in Table Relates to Corresponding Number
Series 5B Base Parts 5006B thru 5014B
Base Parts
5015B 5016B 5017B 5018B 5019B 5020B 5021B 5022B 5024B 5026B
Series 5B Base Parts 5015B thru 5026B
Base Parts
Boiler Size Quantity Part Size
Canopy
Integral Canopy Drafthoods & Sections
Series 5B Section Replacement Chart
Series 5B Base / Pilot Assemblies
Series 5B Jackets
60413075 5007B Lower Top Panel 2 x 37-3/16 60413085 5008B
2 x 20-7/8
Complete Jackets
Jackets
Boiler Size
5006B 5008B 5009B 5014B 5015B 5016B 5017B 5026B
Boiler Size
V88A GAS Trains Canada Natural GAS only
Fluid Power GAS Trains USA
5006B 5009B 5015B 5016B 5017B
100
Diaphragm Valve LO-HI-LO GAS Train Canada Natural GAS only
101
102
Fluid Power GAS Trains Canada
Ignition Module & Support Bracket EI Control System
103
104
Pilot Safety Switch
Description Manifold Module Support L62GB-3C
A. 5010B-5026B NAT. GAS Canada 5006B-5026B NAT. GAS
105
Transformer & Pilot Line Regulator EO Control System
106
107
108
109
110
EOP & EEP Control Panel
111
112
EI Control System Pilot Assembly
6236007 NAT. GAS
113
EI GAS
6236003 NAT. GAS
114
Not Available for LP
115
Date Service Performed
116
Limited Warranty
Related pages
All Diagram page
Thermal Grilling Chart for Tricity Bendix BS 685
Jumper Block Diagrams for BlueStorm for Connect Tech BlueStorm Universal PCI
Block Diagram for Numark Industries DM 1835X
System connection diagram for Swann SW243-9MB
PC Compatibility Chart for Sharp LC-C5277UN
QTY Diagram for ICP DAS USA DFS2H318J2A
Configuration diagram 1 When using RS-232C for Mitsubishi Electronics MR-J2S- A
Projection Distance Chart for Meridian America MF10
International Mode Frequency Chart for West Marine VHF50
Wiring Diagram for Desa MSVFBNR Series
How does the
Four-Stage Cooking
function work in Kenmore ovens?
Top
Page
Image
Contents