Burnham
K50
manual
Wiring Diagram 6 Thru 14 SECT. Boilers EOP Control System
Install
Warranty
Dimension
BASE-BURNER-MANIFOLD Assemblys
Minimum Input Adjustments
Cleaning of Flueways
Safety
Fluid Power GAS Trains USA
Section V Service
Page 60
60
Fig. 51
WIRING DIAGRAM - 6 THRU 14 SECT. BOILERS
EOP CONTROL SYSTEM
Page 59
Page 61
Image 60
Page 59
Page 61
Contents
Series 5B
Section I Equipment Check List
Important Information
Canadian Equipment Check List
Canadian Equipment Check List
Dimensional Data
Natural GAS Maximum 14 W.C. Minimum 5.5 W.C
Do not Install this Boiler on Carpeting
Provide Combustion and Ventilation AIR
BASE-BURNER-MANIFOLD Assemblys
Single Manifold Base 5006B Thru 5014B Section Boilers
LEH Section on Base Assembly of Center Sections
Dual Manifold Bases 5015B Thru 5026B Section Boilers
Arrangement of Sections and Canopys
Open Steam or Water Trim Carton
Purpose of Tappings and Their Locations
Installation of BUILT-IN Heater
Testing Boiler Assembly for Leaks
Connect Supply and Return Piping to Heating System
Sealing of BASE, Installation Flue Covers and Canopies
Attachment of Flue Covers
Oxygen Corrosion
Page
Page
Page
Page
Recommended Water Boiler Piping
Supply Connection & I Return Connection
Supply Connections & 2 Return Connections
Sizes 5006B Thru 5019B
Installation of Jacket Parts Common to ALL Boiler Sizes
Installation of Jacket Support Brackets to Base END Panels
Page
Exploded View of Jacket 6 Thru 10 Section Boilers
Securing of CANOPY/DRAFTHOOD
CANOPY/DRAFTHOOD Mounting Diagram
Exploded View of Jacket 11 Thru 19 SECT. Boilers
Completion of Jacket Installation 11 Thru 26 Section Boilers
Exploded View of Jacket 20 Thru 22 SECT. Boilers
Exploded View of Jacket 26 SECT. Boilers
Shutoff Valve Between Safety Valve
Steam Trim and Controls
Mounting Elevations of M&M 150 and a 67M Float Lwco
Water Trim and Controls
Recommended Piping to BUILT-IN Tankless Heaters
Open GAS Train Cartons
Open Gas Controls Cartons
Installation of S8610M Module
Pilot Piping EI Control System Robertshaw7000 A B Thru 5009B
Pilot Piping EI Control System V88A
A B Thru 5026B NAT. GAS Canada 5006B Thru 5026B NAT. GAS
Installation of Pilot Safety Switch
Installation of Pilot Safety Switch EO Control System
Pilot Piping EO Control System
Installation of EO and EE Mounting Bracket and Controls
EE Control System
Sect. and larger boilers
Pilot Piping EE Control System
Installation of Pilot Safety Switch EOP Control System
Pilot Piping EOP Control System
EEP Control System
Pilot Piping EEP Control System
Page
Venting
Single Vent System Manifold Vent System
Page
Section IV Operation
General
Table IV Water Content
Condensation
Control Variations
Be sure power is off when checking high voltage connections
A B Thru 5009B
Schematic Wiring Diagram EI Control System V88 GAS Train
Sequence of Operation
A B Thru 5014B
Canada 5006B Thru 5014B
Schematic wiring diagram 15 Thru 26 SECT. Boilers
EI Control System
Sequence of Operation
Page
Safety Switch Circuit
Pilot Failure
Wiring diagram 6 Thru 14 SECT. Boilers
Proceed to Paragraph 15- Minimum Input
Wiring diagram 15 Thru 26 SECT. Boilers
Operating and safety controls. Should any
EE Control System
Wiring diagram 15 Thru 26 SECT. Boilers
Proceed to Paragraph 15- Minimum Input
Wiring Diagram 6 Thru 14 SECT. Boilers EOP Control System
Turn on Main Power Switch. Main Power Light will light
Wiring Diagram 15 Thru 26 SECT. Boilers EOP Control System
Safety Switch Circuit
Wiring Diagram 6 Thru 14 SECT. Boilers EEP Control System
Pilot Failure
Safety Switch Circuit
Wiring Diagram 15 Thru 26 SECT. Boilers EEP Control System
Make sure all manual resets are activated where applicable
Normal Operation Sequence
Page
Check GAS Input Rate to Boiler
Minimum Input Adjustments
V8944B Combination Valve
Motorized Modulating Actuator
Screw
Test Ignition System Safety SHUT-OFF Device AS Follows
Thermocouple Pilot System
Combustion Chamber BURN-OFF
Section V Service
Removal of Jacket Front Panel
Avoid Breathing Fiber Particulates and Dust
Cleaning of Flueways
Lubrication
Pilot Locations
Main Burner Flame Adjustment
Pilot Flame Honeywell Q3481B
Pilot Flame
Honeywell Q179D Pilot w/THERMOCOUPLE
Pilot Flame Honeywell Q179C Pilot
Honeywell Q327A Pilot w/THERMOCOUPLE
Do not drain water below gauge glass
Base Parts
Jackets
Series 5B Base Parts 5006B thru 5014B
Number in in Table Relates to Corresponding Number
Base Parts
Series 5B Base Parts 5015B thru 5026B
5015B 5016B 5017B 5018B 5019B 5020B 5021B 5022B 5024B 5026B
Base Parts
Canopy
Boiler Size Quantity Part Size
Integral Canopy Drafthoods & Sections
Series 5B Section Replacement Chart
Series 5B Base / Pilot Assemblies
Series 5B Jackets
60413075 5007B Lower Top Panel 2 x 37-3/16 60413085 5008B
2 x 20-7/8
Complete Jackets
Jackets
Boiler Size
Boiler Size
5006B 5008B 5009B 5014B 5015B 5016B 5017B 5026B
V88A GAS Trains Canada Natural GAS only
Fluid Power GAS Trains USA
100
5006B 5009B 5015B 5016B 5017B
101
Diaphragm Valve LO-HI-LO GAS Train Canada Natural GAS only
Fluid Power GAS Trains Canada
102
103
Ignition Module & Support Bracket EI Control System
Pilot Safety Switch
104
Description Manifold Module Support L62GB-3C
105
A. 5010B-5026B NAT. GAS Canada 5006B-5026B NAT. GAS
106
Transformer & Pilot Line Regulator EO Control System
107
108
109
110
111
EOP & EEP Control Panel
EI Control System Pilot Assembly
112
113
6236007 NAT. GAS
EI GAS
114
6236003 NAT. GAS
Not Available for LP
Date Service Performed
115
Limited Warranty
116
Related pages
All Diagram page
Wiring Diagrams for Hunter Fan 44377W
Hydraulic Schematic to SN AF3700155 for Multiquip SP706016
GEF-3GSDI-FO-141 Connection Diagram for Gefen GEF-3GSDI-FO-141
Character Chart for Motorola V188
Oven Components Diagram for Panasonic NN-S735
Cleaning chart for Whirlpool SC8630EB
AWG Rating Chart Cord Length for Harbor Freight Tools 40318
Main Unit Disassembly Flowchart for Acer 521
Lubrication Chart for Poulan PO17542STA
How to set up my Samsung TV?
Learn more
Top
Page
Image
Contents