Burnham K50 manual Open Steam or Water Trim Carton, Purpose of Tappings and Their Locations

Page 11

e.DRAW UP CENTER SECTION SLOWLY AND EVENLY, tightening each DRAW-UP ROD a little at a time so that sections are equally spaced. KEEP NIPPLES ALIGNED WITH NIPPLE PORTS. If necessary, tap Nipples lightly with a blunt tool or rod to keep Nipples from cocking while Sections are being drawn up. DO NOT DRAW UP SECTION(S) WHEN NIPPLES ARE COCKED. Continue tightening Draw-Up Rods equally until Sections meet iron-to-iron on the ground surface. BUMPING OUTER EDGES OF SECTION WITH WOODEN BLOCK WILL EASE DRAW-UP OPERATION.

f.KEEP DRAW-UP ROD THREADS, NUTS AND WASHERS LUBRICATED with grease or heavy oil to prevent damage to rods and threads and to make assembling easier.

g.Using a pinch bar, insert WOOD WEDGES under last Center Section assembled so as to raise it just above Boiler Base. This will keep the next section to be assembled above the base, thus making

it easier to join and draw-up. MOVE WOOD WEDGES FORWARD EACH time a Section has been drawn up.

7.ASSEMBLE REMAINING END SECTION WITH DRAW-UP RODS in a manner similar to that for assembling Center Sections. Remove wedges from under Boiler. Be sure Boiler is aligned and seated on Base.

a.After section assembly is completed install 5/8” tie rods from tie rod bundle through the upper lug holes in the front of Boiler and Lower lug holes in the rear of Boiler sections and tighten until they are finger tight only, to allow for expansion. This is necessary in order to allow clearance for installation of Flue cover plates. Finally, remove ¾” draw-up rods from nipple ports.

Open Steam or Water Trim Carton

8.Use the plugs in this carton to plug tappings in End Sections that will not be utilized on final installation, see Fig. 7.

Fig. 7

PURPOSE OF TAPPINGS AND THEIR LOCATIONS

PURPOSE OF TAPPINGS 1

Location

Tapping Per

Size

Steam Boilers

Water Boilers

End Section

 

 

 

 

A

1

3”

Supply

Supply

B

1

3”

Return

Return

C2

1

1-1/2”

Pressure Operating Control

Temperature Operating Control (less heater)

(Bushed to 1/4”)

Bushed to 3/4”; Plug (with heater)

 

 

 

D

1

1/2”

Pressure Gauge

Theraltimeter

E

2

1/2”

Water Gauge, LWCO & Pressure Limit

Plug

F

1

3/8”

Try-Cock (Special Order)

----

G3

1

----

Cover Plate

Cover Plate or Tankless Heater

H

1

1”

See Note 4

See Note 4

J

1

1-1/2”

Indirect Water Heater

----

Supply or Return

 

 

 

 

K

1

3/4”

Indirect Water Heater Limit

----

1Tappings on both end sections are identical - Recommend trim be installed in left end section or on same end as gas train.

2This tapping is used for safety valve and surface blowoff (steam boilers) and safety relief valve (water boilers) on end not equipped with trim.

3Temperature operating control location on tankless heater equipped boilers. Also alternate operating control location, tapped cover plate.

4If using a float type LWCO, feeder or pump controller on a steam boiler that does not use quick connect hook up fittings, install between tappings H and return B. Use opposite return B for system return connection. Water boilers using a probe LWCO must mount probe in supply pipe above boiler without any stop valves.

11

Image 11
Contents Series 5B Section I Equipment Check List Important Information Canadian Equipment Check List Canadian Equipment Check List Natural GAS Maximum 14 W.C. Minimum 5.5 W.C Dimensional DataProvide Combustion and Ventilation AIR Do not Install this Boiler on CarpetingSingle Manifold Base 5006B Thru 5014B Section Boilers BASE-BURNER-MANIFOLD AssemblysDual Manifold Bases 5015B Thru 5026B Section Boilers LEH Section on Base Assembly of Center SectionsArrangement of Sections and Canopys Purpose of Tappings and Their Locations Open Steam or Water Trim CartonConnect Supply and Return Piping to Heating System Installation of BUILT-IN HeaterTesting Boiler Assembly for Leaks Oxygen Corrosion Sealing of BASE, Installation Flue Covers and CanopiesAttachment of Flue Covers Page Page Page Page Sizes 5006B Thru 5019B Recommended Water Boiler PipingSupply Connection & I Return Connection Supply Connections & 2 Return ConnectionsInstallation of Jacket Support Brackets to Base END Panels Installation of Jacket Parts Common to ALL Boiler SizesPage Exploded View of Jacket 6 Thru 10 Section Boilers Securing of CANOPY/DRAFTHOOD CANOPY/DRAFTHOOD Mounting Diagram Exploded View of Jacket 11 Thru 19 SECT. Boilers Completion of Jacket Installation 11 Thru 26 Section Boilers Exploded View of Jacket 20 Thru 22 SECT. Boilers Exploded View of Jacket 26 SECT. Boilers Steam Trim and Controls Shutoff Valve Between Safety ValveMounting Elevations of M&M 150 and a 67M Float Lwco Water Trim and Controls Open GAS Train Cartons Recommended Piping to BUILT-IN Tankless HeatersOpen Gas Controls Cartons Pilot Piping EI Control System Robertshaw7000 A B Thru 5009B Installation of S8610M ModuleA B Thru 5026B NAT. GAS Canada 5006B Thru 5026B NAT. GAS Pilot Piping EI Control System V88APilot Piping EO Control System Installation of Pilot Safety SwitchInstallation of Pilot Safety Switch EO Control System EE Control System Installation of EO and EE Mounting Bracket and ControlsPilot Piping EE Control System Sect. and larger boilersPilot Piping EOP Control System Installation of Pilot Safety Switch EOP Control SystemPilot Piping EEP Control System EEP Control SystemPage Single Vent System Manifold Vent System VentingPage General Section IV OperationTable IV Water Content Control Variations CondensationBe sure power is off when checking high voltage connections A B Thru 5009B Canada 5006B Thru 5014B Schematic Wiring Diagram EI Control System V88 GAS TrainSequence of Operation A B Thru 5014BEI Control System Schematic wiring diagram 15 Thru 26 SECT. BoilersSequence of Operation Page Pilot Failure Safety Switch CircuitWiring diagram 6 Thru 14 SECT. Boilers Proceed to Paragraph 15- Minimum Input Wiring diagram 15 Thru 26 SECT. Boilers Operating and safety controls. Should any EE Control System Wiring diagram 15 Thru 26 SECT. Boilers Proceed to Paragraph 15- Minimum Input Wiring Diagram 6 Thru 14 SECT. Boilers EOP Control System Turn on Main Power Switch. Main Power Light will light Wiring Diagram 15 Thru 26 SECT. Boilers EOP Control System Safety Switch Circuit Wiring Diagram 6 Thru 14 SECT. Boilers EEP Control System Pilot Failure Safety Switch Circuit Wiring Diagram 15 Thru 26 SECT. Boilers EEP Control System Make sure all manual resets are activated where applicable Normal Operation Sequence Page Check GAS Input Rate to Boiler Screw Minimum Input AdjustmentsV8944B Combination Valve Motorized Modulating ActuatorTest Ignition System Safety SHUT-OFF Device AS Follows Combustion Chamber BURN-OFF Thermocouple Pilot SystemRemoval of Jacket Front Panel Section V ServiceAvoid Breathing Fiber Particulates and Dust Lubrication Cleaning of FluewaysPilot Locations Honeywell Q179D Pilot w/THERMOCOUPLE Main Burner Flame AdjustmentPilot Flame Honeywell Q3481B Pilot FlameHoneywell Q327A Pilot w/THERMOCOUPLE Pilot Flame Honeywell Q179C PilotDo not drain water below gauge glass Jackets Base PartsNumber in in Table Relates to Corresponding Number Series 5B Base Parts 5006B thru 5014BBase Parts 5015B 5016B 5017B 5018B 5019B 5020B 5021B 5022B 5024B 5026B Series 5B Base Parts 5015B thru 5026BBase Parts Boiler Size Quantity Part Size CanopyIntegral Canopy Drafthoods & Sections Series 5B Section Replacement Chart Series 5B Base / Pilot Assemblies Series 5B Jackets 60413075 5007B Lower Top Panel 2 x 37-3/16 60413085 5008B 2 x 20-7/8 Complete Jackets Jackets Boiler Size 5006B 5008B 5009B 5014B 5015B 5016B 5017B 5026B Boiler SizeV88A GAS Trains Canada Natural GAS only Fluid Power GAS Trains USA 5006B 5009B 5015B 5016B 5017B 100Diaphragm Valve LO-HI-LO GAS Train Canada Natural GAS only 101102 Fluid Power GAS Trains CanadaIgnition Module & Support Bracket EI Control System 103Description Manifold Module Support L62GB-3C Pilot Safety Switch104 A. 5010B-5026B NAT. GAS Canada 5006B-5026B NAT. GAS 105Transformer & Pilot Line Regulator EO Control System 106107 108 109 110 EOP & EEP Control Panel 111112 EI Control System Pilot AssemblyEI GAS 1136236007 NAT. GAS Not Available for LP 1146236003 NAT. GAS 115 Date Service Performed116 Limited Warranty