GTO SL-1000B, SL-2000B installation manual Moving Gate Can Cause Injury Or Death

Page 10

IMPORTANT SAFETY INSTRUCTIONS

Continued from page 7

These warning labels should be found at the locations specified below. If any of them are missing, immediately contact your installer for replacements.

!WARNING

!WARNING

• Fingers, hands, and loose clothing may be dragged into chain sprockets.

• Fingers and hands can be injured by rotating sprockets.

• Keep hands, fingers, and loose clothing away from chain and sprockets.

Moving Gate Can Cause

Injury Or Death

1.KEEP CLEAR! Gate may move at any time.

2.Do not allow children to operate gate or play in gate area.

3.This gate is for vehicles only. Pedestrians must use a separate entrance.

warning signs (2) to be installed on each side of the gate (3–5 feet above the bottom of the gate)

!WARNING

warning sign located (inside housing) over the top sprocket at back of operator

!WARNING

Adjusting limit switches with power on will activate gate.

Injury may result if fingers get caught under switch plate while adjusting switches.

Use extreme caution when adjusting switches.

warning label located on limit switch plate

• Fingers, hands, and loose clothing may be dragged into chain sprockets.

• Fingers and hands can be injured by rotating sprockets.

• Keep hands, fingers, and loose clothing away from chain and sprockets.

warning label located (inside housing) next to sprockets on back of operator

8

Image 10
Contents Automatic Gate Operator Table of Contents Important Safety Instructions II. During Installation For the InstallerBefore Installation For the System DesignerIII. After Installation Entrapment Alarm UL 325 Secondary Means of Protection Against EntrapmentFor the CONSUMER/END User No ONE should Cross the Path of the Moving GateRequired Safety Precautions for Gates Point hazardSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Overview of Operator Installation Single Gate Operator InstallationGate Preparation Recommended Wiring and USE of Conduit Mounting the Legs on the Slide Gate OperatorBefore Pouring Concrete 1 Make sure operator is Determining the Mounting Position and Mounting the OperatorProceeding to the next step Centered between roller posts and aligned with stringInstalling the Chain To Open the Gate ManuallyInstallation of the GTO Transformer Powering the SystemConnecting the Battery No more than 1000 ftSolar Zones and Gate Activity Estimated Maximum Number of Cycles Per DayStep See Illustration K 18VACControl Board Settings RightPotentiometers Setting the Personal Transmitter Code Mounting the Receiver Run the cable through PVC conduit to protect it from damageHowever, if your gate opens from Left to Right Adjusting the Limit SwitchesIf your gate opens from Right to Left Counter ClockwiseConnecting Safety Devices Connecting Additional Safety DevicesBLU Blue Used with GRN Green Connecting AccessoriesWHT White Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Maintenance Trouble Shooting Guide MaintenanceSystem Test Specifications Connected to these terminalsLimited Two Year Warranty Warranty and Repair ServiceInstructions for the Installation Dual Slide Gate System Dual Gate System Installation Second Gate Auxiliary Operator Parts & HardwarePreparing the Gates Control UnitWiring the Second Operator This Step is for SL-2000/2200 Installation onlySetting the Control Board for Dual Gate Installations Refer to the illustrations on the nextStep Accessories #41 Slide Gate Chain RB207 When You Know Multiply By To Find Symbol Vehicular Gate Operator Class CategoriesInstallation of this operator conforms to Class Installation Check ListInstructions