GTO SL-2000B Dual Gate System Installation, Second Gate Auxiliary Operator Parts & Hardware

Page 35

DUAL GATE SYSTEM INSTALLATION

Install the second gate operator in the same manner as the Single gate operator starting on page 14 of this manual. The second gate preparation and wiring of the second (auxiliary) operator follow on the next two pages. Once the second gate operator is installed, Set the DIP switches for DUAL gates and the order in which the gates open (“sequencing”). Setting the Control Board for Dual Gate Installations begins on page 37.

SECOND GATE (AUXILIARY) OPERATOR PARTS & HARDWARE

Second Gate Operator

(2)2”squarex48”longlegs

The SL-2200 comes with a battery and control box the SL-1200 does not.

Battery

Operator Housing

32’ Drive Chain

 

 

60’ Power Cable

(2) Chain Brackets

Battery Cable

w/ Strain Relief

 

 

(4) 1/4-20 x 1/2Screws (RB226)

(4) 3/8Lock Washers

(RB641)

(4)

3/8”-16 x 2” diameter U-Bolts and

 

(8)

3/8Serrated Nuts (RB210)

(2) Chain Master Links

 

 

 

(RB208)

(4) 3/8Nuts

 

 

 

(RB668)

 

 

 

(4) 3/8-16 x 3Carriage Bolts (RB659)

(2) Quick Release Pins (211IH)

33

Image 35
Contents Automatic Gate Operator Table of Contents Important Safety Instructions For the System Designer For the InstallerBefore Installation II. During InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325No ONE should Cross the Path of the Moving Gate For the CONSUMER/END UserPoint hazard Required Safety Precautions for GatesSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Gate Preparation Single Gate Operator InstallationOverview of Operator Installation Mounting the Legs on the Slide Gate Operator Recommended Wiring and USE of ConduitCentered between roller posts and aligned with string Determining the Mounting Position and Mounting the OperatorProceeding to the next step Before Pouring Concrete 1 Make sure operator isTo Open the Gate Manually Installing the ChainNo more than 1000 ft Powering the SystemConnecting the Battery Installation of the GTO TransformerEstimated Maximum Number of Cycles Per Day Solar Zones and Gate ActivityStep 18VAC See Illustration KRight Control Board SettingsPotentiometers Setting the Personal Transmitter Code Run the cable through PVC conduit to protect it from damage Mounting the ReceiverCounter Clockwise Adjusting the Limit SwitchesIf your gate opens from Right to Left However, if your gate opens from Left to RightConnecting Additional Safety Devices Connecting Safety DevicesORG Orange Used with GRN Green Connecting AccessoriesWHT White Used with GRN Green BLU Blue Used with GRN GreenAttaching the Housing Maintenance Maintenance Trouble Shooting GuideConnected to these terminals System Test SpecificationsWarranty and Repair Service Limited Two Year WarrantyInstructions for the Installation Dual Slide Gate System Second Gate Auxiliary Operator Parts & Hardware Dual Gate System InstallationControl Unit Preparing the GatesThis Step is for SL-2000/2200 Installation only Wiring the Second OperatorRefer to the illustrations on the next Setting the Control Board for Dual Gate InstallationsStep Accessories #41 Slide Gate Chain RB207 Vehicular Gate Operator Class Categories When You Know Multiply By To Find SymbolInstructions Installation Check ListInstallation of this operator conforms to Class