GTO SL-1000B, SL-2000B installation manual Single Gate Operator Installation, Gate Preparation

Page 14

SINGLE GATE OPERATOR INSTALLATION

GATE PREPARATION

Be sure the gate is properly installed and slides smoothly before installing the GTO/PRO Slide Gate Operator. The gate must be plumb, level, and move freely. The gate must not bind or drag on the ground. Never use a wheel on the gate, because the additional drag and resistance can cause the operator to obstruct.

Level

Plumb

Concrete

Concrete

OVERVIEW OF OPERATOR INSTALLATION

The diagram below shows a single slide gate installation with recommended safety features. The operator must be installed on the inside of the gate. GTO requires using safety edges and roller guards to help reduce the possibility of bodily injury.

 

 

 

Contact Sensor

 

 

Roller Guard

(REQUIRED)

 

 

 

Contact Sensor

Contact Sensor

(REQUIRED)

Receiver

 

(REQUIRED)

(REQUIRED)

 

(cable in separate

 

 

 

conduit)

!WARNING

Moving Gate Can Cause

120 Volt Indoor

Injury Or Death

Transformer

Chain Bracket

Chain Bracket

 

STAND CLEAR

(Surge Protector

 

 

 

CAUTION

not supplied)

 

Operator

 

Chain

Roller Guard

 

(REQUIRED)

Roller Guard

 

(REQUIRED)

 

Use PVC Conduit

Run 1000' (max.) of low

voltage wire to control

(not included)

box from transformer

for power cables.

(wire not included).

12

Image 14
Contents Automatic Gate Operator Table of Contents Important Safety Instructions II. During Installation For the InstallerBefore Installation For the System DesignerIII. After Installation Entrapment Alarm UL 325 Secondary Means of Protection Against EntrapmentFor the CONSUMER/END User No ONE should Cross the Path of the Moving GateRequired Safety Precautions for Gates Point hazardSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Gate Preparation Single Gate Operator InstallationOverview of Operator Installation Recommended Wiring and USE of Conduit Mounting the Legs on the Slide Gate OperatorBefore Pouring Concrete 1 Make sure operator is Determining the Mounting Position and Mounting the OperatorProceeding to the next step Centered between roller posts and aligned with stringInstalling the Chain To Open the Gate ManuallyInstallation of the GTO Transformer Powering the SystemConnecting the Battery No more than 1000 ftSolar Zones and Gate Activity Estimated Maximum Number of Cycles Per DayStep See Illustration K 18VACControl Board Settings RightPotentiometers Setting the Personal Transmitter Code Mounting the Receiver Run the cable through PVC conduit to protect it from damageHowever, if your gate opens from Left to Right Adjusting the Limit SwitchesIf your gate opens from Right to Left Counter ClockwiseConnecting Safety Devices Connecting Additional Safety DevicesBLU Blue Used with GRN Green Connecting AccessoriesWHT White Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Maintenance Trouble Shooting Guide MaintenanceSystem Test Specifications Connected to these terminalsLimited Two Year Warranty Warranty and Repair ServiceInstructions for the Installation Dual Slide Gate System Dual Gate System Installation Second Gate Auxiliary Operator Parts & HardwarePreparing the Gates Control UnitWiring the Second Operator This Step is for SL-2000/2200 Installation onlySetting the Control Board for Dual Gate Installations Refer to the illustrations on the nextStep Accessories #41 Slide Gate Chain RB207 When You Know Multiply By To Find Symbol Vehicular Gate Operator Class CategoriesInstructions Installation Check ListInstallation of this operator conforms to Class