The GTO Slide Gate Operator is designed for minimum maintenance. However, for optimum performance and safety, the following maintenance procedures should be taken:

GATE

Having a well maintained gate will ensure that the operator runs smoothly and safely. Make sure gate is hung level and plumb. Check and adjust periodically. Lubricate rollers periodically with grease appropriate for the

coldest weather in your area.

SAFETY EDGES

Periodically test the safety edges to make sure they are functioning correctly. If they are not, discard and replace immediately.

CONTROL DEVICES

From time to time, check to ensure that all of the control devices connected to the operator are functioning. This is especially important for safety devices.

OPERATOR

Occasionally inspect the chain to ensure that it is well lubricated, and oil the chain as necessary. Use CHAIN AND CABLE LUBE for best results. Check the gear sprockets and grease them as needed. Check the rollers and spray oil on them as needed.

28

Image 30
Contents Automatic Gate Operator Table of Contents Important Safety Instructions II. During Installation For the InstallerBefore Installation For the System DesignerIII. After Installation Entrapment Alarm UL 325 Secondary Means of Protection Against EntrapmentFor the CONSUMER/END User No ONE should Cross the Path of the Moving GateRequired Safety Precautions for Gates Point hazardSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Single Gate Operator Installation Overview of Operator InstallationGate Preparation Recommended Wiring and USE of Conduit Mounting the Legs on the Slide Gate OperatorBefore Pouring Concrete 1 Make sure operator is Determining the Mounting Position and Mounting the OperatorProceeding to the next step Centered between roller posts and aligned with stringInstalling the Chain To Open the Gate ManuallyInstallation of the GTO Transformer Powering the SystemConnecting the Battery No more than 1000 ftSolar Zones and Gate Activity Estimated Maximum Number of Cycles Per DayStep See Illustration K 18VACControl Board Settings RightPotentiometers Setting the Personal Transmitter Code Mounting the Receiver Run the cable through PVC conduit to protect it from damageHowever, if your gate opens from Left to Right Adjusting the Limit SwitchesIf your gate opens from Right to Left Counter ClockwiseConnecting Safety Devices Connecting Additional Safety DevicesBLU Blue Used with GRN Green Connecting AccessoriesWHT White Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Maintenance Trouble Shooting Guide MaintenanceSystem Test Specifications Connected to these terminalsLimited Two Year Warranty Warranty and Repair ServiceInstructions for the Installation Dual Slide Gate System Dual Gate System Installation Second Gate Auxiliary Operator Parts & HardwarePreparing the Gates Control UnitWiring the Second Operator This Step is for SL-2000/2200 Installation onlySetting the Control Board for Dual Gate Installations Refer to the illustrations on the nextStep Accessories #41 Slide Gate Chain RB207 When You Know Multiply By To Find Symbol Vehicular Gate Operator Class CategoriesInstallation Check List Installation of this operator conforms to ClassInstructions