GTO SL-1000B, SL-2000B installation manual Table of Contents

Page 2

TABLE OF CONTENTS

Gate Operator Class Categories --------------------------------------------------------

inside cover

Important Safety Instructions -----------------------------------------------------------

page 1

Important Safety Instructions for the System Designer ----------------------------

page 2

Important Safety Instructions for the Installer ---------------------------------------

page 2

Secondary means of Protection Against Entrapment -------------------------------

page 4

Important Safety Instructions for the Consumer/End User ------------------------

page 5

Warning Labels and Signs --------------------------------------------------------------

page 7

Technical Specifications for SL-1000----------------------------------------------------

page 9

Technical Specifications for SL-2000----------------------------------------------------

page 10

Parts Identification (Single Gate Operator) -------------------------------------------

page 11

Single Gate Operator Installation -------------------------------------------------------

page 12

Overview and Gate Preparation -------------------------------------------------------

page 12

Suggested Conduit & Wiring and Mounting the Legs ------------------------------

page 13

Determining the Mounting Position and Mounting the Operator -----------------

page 14

Installing the Chain ----------------------------------------------------------------------

page 15

Disconnecting Operator Chain for Manual Operation of Gate --------------------

page 15

Powering the System -----------------------------------------------------------------------

page 16

Maximum Operational Cycles Chart --------------------------------------------------

page 16

Installation of the Transformer ---------------------------------------------------------

page 16

Control Board settings ---------------------------------------------------------------------

page 20

DIP Switches ----------------------------------------------------------------------------------

page 20

Potentiometers --------------------------------------------------------------------------------

page 21

Connecting the Receiver to the Control Board ---------------------------------------

page 22

Setting Your Personal Transmitter Code --------------------------------------------------

page 22

Mounting the Receiver ----------------------------------------------------------------------

page 23

Adjusting the Limit Switches ------------------------------------------------------------

page 24

Connecting Safety Devices ----------------------------------------------------------------

page 25

Connecting Accessories---------------------------------------------------------------------

page 26

Maintenance ---------------------------------------------------------------------------------

page 28

Troubleshooting Guide ---------------------------------------------------------------------

page 29

Warranty and Repair Information ------------------------------------------------------

page 31

Dual Gate System Installation -----------------------------------------------------------

page 32

Preparing the Gates ----------------------------------------------------------------------

page 34

Wiring the Second Operator -----------------------------------------------------------

page 35

Setting the Control Board for Dual Gate Installations -----------------------------

page 36

Accessory Catalog -------------------------------------------------------------------------

page 38

Installation Check List -------------------------------------------------------

inside back cover

Image 2
Contents Automatic Gate Operator Table of Contents Important Safety Instructions II. During Installation For the InstallerBefore Installation For the System DesignerIII. After Installation Entrapment Alarm UL 325 Secondary Means of Protection Against EntrapmentFor the CONSUMER/END User No ONE should Cross the Path of the Moving GateRequired Safety Precautions for Gates Point hazardSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Gate Preparation Single Gate Operator InstallationOverview of Operator Installation Recommended Wiring and USE of Conduit Mounting the Legs on the Slide Gate OperatorBefore Pouring Concrete 1 Make sure operator is Determining the Mounting Position and Mounting the OperatorProceeding to the next step Centered between roller posts and aligned with stringInstalling the Chain To Open the Gate ManuallyInstallation of the GTO Transformer Powering the SystemConnecting the Battery No more than 1000 ftSolar Zones and Gate Activity Estimated Maximum Number of Cycles Per DayStep See Illustration K 18VACControl Board Settings RightPotentiometers Setting the Personal Transmitter Code Mounting the Receiver Run the cable through PVC conduit to protect it from damageHowever, if your gate opens from Left to Right Adjusting the Limit SwitchesIf your gate opens from Right to Left Counter ClockwiseConnecting Safety Devices Connecting Additional Safety DevicesBLU Blue Used with GRN Green Connecting AccessoriesWHT White Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Maintenance Trouble Shooting Guide MaintenanceSystem Test Specifications Connected to these terminalsLimited Two Year Warranty Warranty and Repair ServiceInstructions for the Installation Dual Slide Gate System Dual Gate System Installation Second Gate Auxiliary Operator Parts & HardwarePreparing the Gates Control UnitWiring the Second Operator This Step is for SL-2000/2200 Installation onlySetting the Control Board for Dual Gate Installations Refer to the illustrations on the nextStep Accessories #41 Slide Gate Chain RB207 When You Know Multiply By To Find Symbol Vehicular Gate Operator Class CategoriesInstructions Installation Check ListInstallation of this operator conforms to Class