GTO SL-2000B, SL-1000B Connecting Safety Devices, Connecting Additional Safety Devices

Page 27

CONNECTING SAFETY DEVICES

The GTO/PRO SL-1000 and SL-2000 series operators are equipped with built-in obstruction sensitivity. These operators are designed to stop and reverse the gate for 2 seconds when it comes in contact with an obstruction. However, obstruction sensitivity, even when properly adjusted, may not be sensitive enough to prevent bodily injury. For this reason, safety edges or photoelectric sensors MUST be installed on the gate. Safety edges (or photoelectric sensors) must be mounted in compliance with Underwriters Laboratories’ safety standard for gate operators, UL 325. Review page 6 for information about mounting requirements for safety edges and photo- electric sensors.

Refer to the sensor manufacturer’s instructions for information about installing these devices on a vehicular gate.

Make sure the control box power switch is OFF before connecting safety device wiring to the terminal blocks.

Insert the safety device wires into the CLS EDG terminal (located on the FIRST OPERATOR terminal block) for the gate closing mode. Ground the safety device at the GRN terminal. Connect the safety device wires for the gate opening mode to the OPN EDG terminal in the same manner.

MAKE SURE TO GROUND THE SAFETY DEVICES AT THE GRN TERMINAL! THE CONTROL BOARD COULD BE DAMAGED IF THE SAFETY DEVICES ARE NOT GROUNDED!

18VAC SOLAR ~ ~ – +

POWER IN

RED BLK ORG BLU GRN CLS EDG

OPN EDG

FIRST OPERATOR

 

RED BLK ORG BLU GRN CLS EDG OPN EDG

SECOND OPERATOR

SEQ1

ON

 

 

SEQ2

 

LEARN

 

 

 

GRN ORG

BLU

WHT

R

B G

 

 

 

ALARM ACCESSORY

 

RCVR

Power Cable from First Operator

Ground Wire

Wire from Close Safety Edge or Photoelectric Sensor

Ground Wire

Wire from Open

Safety Edge or Photoelectric Sensor

CONNECTING ADDITIONAL SAFETY DEVICES

Although GTO strongly recommends the use of additional safety devices, we do not endorse any specific brand names. Only use products that are certified and listed to be in compliance with UL (United Laboratories) and national and regional safety codes.

Call GTO Sales at 1-800-543-4283 for information on compatible products for your specific application.

25

Image 27
Contents Automatic Gate Operator Table of Contents Important Safety Instructions For the System Designer For the InstallerBefore Installation II. During InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325No ONE should Cross the Path of the Moving Gate For the CONSUMER/END UserPoint hazard Required Safety Precautions for GatesSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Single Gate Operator Installation Overview of Operator InstallationGate Preparation Mounting the Legs on the Slide Gate Operator Recommended Wiring and USE of ConduitCentered between roller posts and aligned with string Determining the Mounting Position and Mounting the OperatorProceeding to the next step Before Pouring Concrete 1 Make sure operator isTo Open the Gate Manually Installing the ChainNo more than 1000 ft Powering the SystemConnecting the Battery Installation of the GTO TransformerEstimated Maximum Number of Cycles Per Day Solar Zones and Gate ActivityStep 18VAC See Illustration KRight Control Board SettingsPotentiometers Setting the Personal Transmitter Code Run the cable through PVC conduit to protect it from damage Mounting the ReceiverCounter Clockwise Adjusting the Limit SwitchesIf your gate opens from Right to Left However, if your gate opens from Left to RightConnecting Additional Safety Devices Connecting Safety DevicesORG Orange Used with GRN Green Connecting AccessoriesWHT White Used with GRN Green BLU Blue Used with GRN GreenAttaching the Housing Maintenance Maintenance Trouble Shooting GuideConnected to these terminals System Test SpecificationsWarranty and Repair Service Limited Two Year WarrantyInstructions for the Installation Dual Slide Gate System Second Gate Auxiliary Operator Parts & Hardware Dual Gate System InstallationControl Unit Preparing the GatesThis Step is for SL-2000/2200 Installation only Wiring the Second OperatorRefer to the illustrations on the next Setting the Control Board for Dual Gate InstallationsStep Accessories #41 Slide Gate Chain RB207 Vehicular Gate Operator Class Categories When You Know Multiply By To Find SymbolInstallation Check List Installation of this operator conforms to ClassInstructions