GTO SL-1000B Powering the System, Connecting the Battery, Installation of the GTO Transformer

Page 18

POWERING THE SYSTEM

CONNECTING THE BATTERY

OFF

Make sure the control box power switch is in the OFF position.

STEP 8

Unscrew and remove the front cover of the control box and slide battery into position with its terminals to the left (see illustration). Make sure the battery fits snugly in control box.

Connect the black battery lead to the negative () terminal, and the red battery lead to the positive (+) terminal. DO NOT allow battery leads to touch the control board! Touching the control board with battery leads can short circuit the system!

HINT: a dab of household petroleum jelly on each terminal will help prevent corrosion.

RED WIRE to positive (+)

BLACK WIRE to negative (–)

INSTALLATION OF THE GTO TRANSFORMER

Choose the electrical outlet into which the transformer will be plugged. Measure the distance from the electrical outlet to the control box, following the path where the low voltage wire will run (the maximum distance can be

no more than 1000 ft.).

NOTE: Transformer must be connected with no more than 1000 ft. of 16 gauge multi-stranded, dual conductor, direct burial low voltage wire.

Predicting the exact maximum number of operational cycles at peak load is more of an art form than an exact science. The charts below illustrate the average maximum number of cycles (the “MNC”) in a 24 hour period on a typical single gate, and is installed such that the motor draws 10 amperes to move the gate.

Gate Opening

Gate Capacity Chart for SL-1000 Series

(estimated number of cycles based on use with a transformer)

20 ft.

120

110

100

90

16 ft.

140

130

120

110

12 ft.

160

150

140

130

8 ft.

180

170

160

150

200 lb. 300 lb. 400 lb. 500 lb.

Gate Weight

Gate Opening

Gate Capacity Chart for SL-2000 Series

(estimated number of cycles based on use with a transformer)

20 ft.

80

70

60

50

16 ft.

100

90

80

70

12 ft.

120

110

100

90

8 ft.

140

130

120

110

400 lb. 600 lb.

800 lb. 1000 lb.

Gate Weight

 

NOTE: Cycles shown are for single gate, dual gates will get approximately half as many cycles.

1)The MNC for the GTO/PRO SL-2000 is roughly comparable to most AC powered operators, and the transformer provided with this operator should handle most high traffic situations. If the battery does not seem to be able to provide the constant charge required for your application, the addition of the GTO/PRO 24 Amp Hour Battery Kit (see Accessoy Catalog) should provide ample power to handle any situation. For more information, call GTO’s service department at 1-800-543-1236.

16

Image 18
Contents Automatic Gate Operator Table of Contents Important Safety Instructions II. During Installation For the InstallerBefore Installation For the System DesignerIII. After Installation Entrapment Alarm UL 325 Secondary Means of Protection Against EntrapmentFor the CONSUMER/END User No ONE should Cross the Path of the Moving GateRequired Safety Precautions for Gates Point hazardSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Single Gate Operator Installation Overview of Operator InstallationGate Preparation Recommended Wiring and USE of Conduit Mounting the Legs on the Slide Gate OperatorBefore Pouring Concrete 1 Make sure operator is Determining the Mounting Position and Mounting the OperatorProceeding to the next step Centered between roller posts and aligned with stringInstalling the Chain To Open the Gate ManuallyInstallation of the GTO Transformer Powering the SystemConnecting the Battery No more than 1000 ftSolar Zones and Gate Activity Estimated Maximum Number of Cycles Per DayStep See Illustration K 18VACControl Board Settings RightPotentiometers Setting the Personal Transmitter Code Mounting the Receiver Run the cable through PVC conduit to protect it from damageHowever, if your gate opens from Left to Right Adjusting the Limit SwitchesIf your gate opens from Right to Left Counter ClockwiseConnecting Safety Devices Connecting Additional Safety DevicesBLU Blue Used with GRN Green Connecting AccessoriesWHT White Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Maintenance Trouble Shooting Guide MaintenanceSystem Test Specifications Connected to these terminalsLimited Two Year Warranty Warranty and Repair ServiceInstructions for the Installation Dual Slide Gate System Dual Gate System Installation Second Gate Auxiliary Operator Parts & HardwarePreparing the Gates Control UnitWiring the Second Operator This Step is for SL-2000/2200 Installation onlySetting the Control Board for Dual Gate Installations Refer to the illustrations on the nextStep Accessories #41 Slide Gate Chain RB207 When You Know Multiply By To Find Symbol Vehicular Gate Operator Class CategoriesInstallation Check List Installation of this operator conforms to ClassInstructions