GTO SL-2000B, SL-1000B installation manual Step

Page 39

FIRST OPERATOR OPENS FIRST, SECOND OPERATOR CLOSES FIRST

SEQ1 = OFF SEQ2 = ON

If SEQ1 is set to OFF, and SEQ2 is set to ON, the FIRST OPERATOR will open first, and the SECOND OPERATOR will close first (see illustration).

FIRST OPERATOR OPENS FIRST,

FIRST OPERATOR CLOSES FIRST

SEQ1 = ON SEQ2 = ON

If SEQ1 is set to ON, and SEQ2 is set to ON, The FIRST OPERATOR opens and closes first.

 

 

 

OBSTRUCT

 

 

 

 

SENS.

PULL/PUSH

 

4

 

 

SNGL/DUAL

 

3

MIN

MAX

SEQ1

ON

2

 

 

SEQ2

1

LEARN

 

 

 

 

 

 

OBSTRUCT

 

 

 

 

SENS.

PULL/PUSH

 

4

 

 

SNGL/DUAL

 

3

MIN

MAX

SEQ1

ON

2

 

 

SEQ2

1

LEARN

 

 

 

BOTH OPERATORS OPEN SIMULTANEOUSLY SECOND OPERATOR CLOSES FIRST

SEQ1 = OFF SEQ2 = OFF

If both SEQ1 and SEQ2 are set to OFF, the FIRST OPERATOR and SECOND OPERATOR will open simultaneously. The SECOND OPERATOR will close first.

PULL/PUSH

SNGL/DUAL

SEQ1

SEQ2

 

4

 

3

ON

2

1

OBSTRUCT

SENS.

MINMAX

LEARN

STEP 7:

Replace the control box cover. Turn the control box power switch to ON. Set the closed gate positions for the first and second operators by adjusting the limit switch (review page 24).

37

Image 39
Contents Automatic Gate Operator Table of Contents Important Safety Instructions For the System Designer For the InstallerBefore Installation II. During InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325No ONE should Cross the Path of the Moving Gate For the CONSUMER/END UserPoint hazard Required Safety Precautions for GatesSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Single Gate Operator Installation Overview of Operator InstallationGate Preparation Mounting the Legs on the Slide Gate Operator Recommended Wiring and USE of ConduitCentered between roller posts and aligned with string Determining the Mounting Position and Mounting the OperatorProceeding to the next step Before Pouring Concrete 1 Make sure operator isTo Open the Gate Manually Installing the ChainNo more than 1000 ft Powering the SystemConnecting the Battery Installation of the GTO TransformerEstimated Maximum Number of Cycles Per Day Solar Zones and Gate ActivityStep 18VAC See Illustration KRight Control Board SettingsPotentiometers Setting the Personal Transmitter Code Run the cable through PVC conduit to protect it from damage Mounting the ReceiverCounter Clockwise Adjusting the Limit SwitchesIf your gate opens from Right to Left However, if your gate opens from Left to RightConnecting Additional Safety Devices Connecting Safety DevicesORG Orange Used with GRN Green Connecting AccessoriesWHT White Used with GRN Green BLU Blue Used with GRN GreenAttaching the Housing Maintenance Maintenance Trouble Shooting GuideConnected to these terminals System Test SpecificationsWarranty and Repair Service Limited Two Year WarrantyInstructions for the Installation Dual Slide Gate System Second Gate Auxiliary Operator Parts & Hardware Dual Gate System InstallationControl Unit Preparing the GatesThis Step is for SL-2000/2200 Installation only Wiring the Second OperatorRefer to the illustrations on the next Setting the Control Board for Dual Gate InstallationsStep Accessories #41 Slide Gate Chain RB207 Vehicular Gate Operator Class Categories When You Know Multiply By To Find SymbolInstallation Check List Installation of this operator conforms to ClassInstructions