GTO SL-1000B, SL-2000B installation manual GTO PRO SL-2000 Series Technical Specifications

Page 12

GTO PRO SL-2000 SERIES TECHNICAL SPECIFICATIONS

DRIVE

Powered by a 12 V motor with integral case hardened steel gear reduction to 90 rpm. Generates 310 in. lb. of torque at 12 V. Motor temperature range -30 °F to +160 °F.

Gate velocity: 1 ft/s.

POWER

The PRO SL-2000system is powered by a 12 Vdc, 7.0 Ah, sealed, rechargeable battery.

Battery charge for PRO SL-2000is maintained by a 18 Vac (40 VA) transformer rectified to 14.5 Vdc through the GTO Control Board. Two (2) blade-style control board fuses rated for 20 A.

IMPORTANT: The transformer should not be connected directly to any battery. Transformer must be connected to the control board with a minimum of 16 gauge, multi-stranded, dual conductor, direct burial low voltage wire. Do not replace fuses with higher ampere rated fuses; doing so will void the warranty and may damage the control board.

Solar Panel Charger can only be used on the SL-2000 if the optional 24 Amp hour battery kit is used (see Accessory Catalog on page 41). Battery charge maintained by GTO Solar Panel Charger: float voltage 14.5 Vdc output from a 193/8” x 151/4

silicon alloy panel. Generates minimum of 10 W at 600 mA. Gated diode on the control board prevents battery discharge.

CONTROL

GTO microprocessor controlled board with temperature compensated circuits. Auto-memorization of digital transmitter code. Charging regulated by circuit on control board. “Sleep draw” is 40 mA; “active draw” is 5 to 13 A.

GTO remote-mounted RF receiver tuned to 318 MHz.

Limit controls are mechanical. Normally open contact.

Adjustable auto-close timer (OFF to 120 s), inertia, and obstruction sensitivity using three (3) potentiometers.

Power terminal block accommodates a transformer and solar panels.

Operator terminal blocks accommodate safety edges and photoelectric sensors for opening and closing modes.

Fully compatible accessory terminal block provides connections for safety loops, wands, intercoms, card readers, phone systems, etc.

DIP switches simplify setup of gate operator.

audio entrapment alarm sounds if unit obstructs twice while opening or closing.

OPERATIONAL CAPACITY

The GTO/PRO SL-2000 and GTO/PRO SL-2000Bwill handle gates weighing up to 1000 lb. (453.4 kg) and up to 30 ft. (9.14 m) in length (per leaf) if the proper installation procedures have been followed. Note that ball bearing rollers and covers should be used on all gates.

The GTO/PRO SL-2000series operators are capable of high volume cycling; however, the total cycles per day will depend on the motor current and efficiency of the gate installation (see chart below). For questions relating to specific applications and for information regarding cycling duty when charged by solar panels, call the GTO Service Department at (800) 543- 1236.

Gate Capacity Chart for SL-2000 Series

(estimated number of cycles based on use with a transformer)

Opening

20 ft.

80

70

60

50

16 ft.

100

90

80

70

 

 

12 ft.

120

110

100

90

Gate

8 ft.

140

130

120

110

 

400 lb.

600 lb.

800 lb.

1000 lb.

Gate Weight

Cycles shown are for single gate, dual gates will get approximately half as many cycles.

Housing Dimensions:

Height: 18” Width: 211/2” Depth: 11”

Shipping Weight:

Approximately 90 lb.

 

 

Rollers should be lubricated at least four times per year.

SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE.

10

Image 12
Contents Automatic Gate Operator Table of Contents Important Safety Instructions For the Installer Before InstallationII. During Installation For the System DesignerIII. After Installation Entrapment Alarm UL 325 Secondary Means of Protection Against EntrapmentFor the CONSUMER/END User No ONE should Cross the Path of the Moving GateRequired Safety Precautions for Gates Point hazardSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Single Gate Operator Installation Overview of Operator InstallationGate Preparation Recommended Wiring and USE of Conduit Mounting the Legs on the Slide Gate OperatorDetermining the Mounting Position and Mounting the Operator Proceeding to the next stepBefore Pouring Concrete 1 Make sure operator is Centered between roller posts and aligned with stringInstalling the Chain To Open the Gate ManuallyPowering the System Connecting the BatteryInstallation of the GTO Transformer No more than 1000 ftSolar Zones and Gate Activity Estimated Maximum Number of Cycles Per DayStep See Illustration K 18VACControl Board Settings RightPotentiometers Setting the Personal Transmitter Code Mounting the Receiver Run the cable through PVC conduit to protect it from damageAdjusting the Limit Switches If your gate opens from Right to LeftHowever, if your gate opens from Left to Right Counter ClockwiseConnecting Safety Devices Connecting Additional Safety DevicesConnecting Accessories WHT White Used with GRN GreenBLU Blue Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Maintenance Trouble Shooting Guide MaintenanceSystem Test Specifications Connected to these terminalsLimited Two Year Warranty Warranty and Repair ServiceInstructions for the Installation Dual Slide Gate System Dual Gate System Installation Second Gate Auxiliary Operator Parts & HardwarePreparing the Gates Control UnitWiring the Second Operator This Step is for SL-2000/2200 Installation onlySetting the Control Board for Dual Gate Installations Refer to the illustrations on the nextStep Accessories #41 Slide Gate Chain RB207 When You Know Multiply By To Find Symbol Vehicular Gate Operator Class CategoriesInstallation Check List Installation of this operator conforms to ClassInstructions