GTO SL-1000B, SL-2000B installation manual Control Board Settings, Right

Page 22

CONTROL BOARD SETTINGS

DIP SWITCHES

The four DIP switches on the control board match the operator with the type of gate on which it is mounted. For example, gates may open right to left or left to right. Prior to packaging, the GTO/PRO SL-1000 and SL-2000 series control board was configured for a single slide gate that opens right to left. If your gate type matches this configuration, you DO NOT need to adjust the DIP switches. Proceed to the Potentiometers section on the next page. NOTE: The direction a gate opens is determined by standing inside the property and facing toward the gate.

NOTE: To change the DIP switch settings, you must turn the control box power switch OFF; move the switch; then turn the power back ON. Use a small screwdriver to

move the switches.

PULL/PUSH: Set to PULL for slide gates that open RIGHT to LEFT [factory setting]; PUSH for slide gates that open LEFT to

RIGHT.

SNGL/DUAL: Set to SNGL for a single gate leaf [factory setting]; DUAL for dual gate leaves.

SEQ1: Controls the opening order of dual gate leaves. See Setting the Control Board for Dual Gate Operator Installation on page 37

DIP switches

PULL/PUSH

 

 

 

 

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

SNGL/DUAL

 

 

 

 

3

 

 

 

SEQ1

ON

 

 

 

2

 

 

 

 

 

 

 

 

 

SEQ2

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OBSTRUCT

 

SENS.

MIN

MAX

LEARN

for more information. (the factory setting is OFF).

SEQ2: Controls the opening order of dual gate leaves. See Setting

the Control Board for Dual Gate Operator Installation on page 37 for more information (the factory setting is OFF).

 

AC

SOLAR

18V

~

 

+

~

 

 

 

 

 

 

 

 

 

 

 

 

POWER

IN

 

 

 

 

TT

 

 

+

BA

 

 

 

RED BLK ORG BLU GRN CLS OPN

 

TOR

FIRST

OPERA

 

 

 

 

 

 

 

OSE

 

 

 

 

AUTOCL

 

 

 

 

 

 

 

 

60

 

 

 

 

ATUS

 

 

 

 

 

 

PWR.

.

ST

 

 

 

 

 

 

SW

 

 

 

 

 

 

120

 

 

 

 

 

OFF

 

 

 

 

 

 

 

 

A

 

 

 

 

 

INERTI

 

 

 

 

 

 

 

 

 

 

 

 

MIN

 

 

MAX

 

 

 

 

 

 

 

 

 

 

 

 

 

OBSTRUCT

 

 

 

 

 

 

SENS

.

 

 

 

 

 

 

 

 

 

 

 

 

MIN

 

 

MAX

 

 

PULL/PUSH

 

 

 

 

 

 

 

AL

 

 

 

 

 

 

 

 

SNGL/DU

 

 

 

LEARN

 

 

SEQ1

 

 

 

 

 

SEQ2

 

 

 

 

 

 

RED

BLK ORG BLU GRN EDGCLS EDGOPN

GRN ORG BLU

WHT

R

B

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ORY

 

RCVR

 

 

 

 

 

 

 

 

 

 

 

 

ACCES

S

 

 

 

 

 

 

TOR

ALARM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OPERA

 

 

 

 

 

 

 

SECOND

 

 

 

 

 

 

 

20

Image 22
Contents Automatic Gate Operator Table of Contents Important Safety Instructions II. During Installation For the InstallerBefore Installation For the System DesignerIII. After Installation Entrapment Alarm UL 325 Secondary Means of Protection Against EntrapmentFor the CONSUMER/END User No ONE should Cross the Path of the Moving GateRequired Safety Precautions for Gates Point hazardSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Overview of Operator Installation Single Gate Operator InstallationGate Preparation Recommended Wiring and USE of Conduit Mounting the Legs on the Slide Gate OperatorBefore Pouring Concrete 1 Make sure operator is Determining the Mounting Position and Mounting the OperatorProceeding to the next step Centered between roller posts and aligned with stringInstalling the Chain To Open the Gate ManuallyInstallation of the GTO Transformer Powering the SystemConnecting the Battery No more than 1000 ftSolar Zones and Gate Activity Estimated Maximum Number of Cycles Per DayStep See Illustration K 18VACControl Board Settings RightPotentiometers Setting the Personal Transmitter Code Mounting the Receiver Run the cable through PVC conduit to protect it from damageHowever, if your gate opens from Left to Right Adjusting the Limit SwitchesIf your gate opens from Right to Left Counter ClockwiseConnecting Safety Devices Connecting Additional Safety DevicesBLU Blue Used with GRN Green Connecting AccessoriesWHT White Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Maintenance Trouble Shooting Guide MaintenanceSystem Test Specifications Connected to these terminalsLimited Two Year Warranty Warranty and Repair ServiceInstructions for the Installation Dual Slide Gate System Dual Gate System Installation Second Gate Auxiliary Operator Parts & HardwarePreparing the Gates Control UnitWiring the Second Operator This Step is for SL-2000/2200 Installation onlySetting the Control Board for Dual Gate Installations Refer to the illustrations on the nextStep Accessories #41 Slide Gate Chain RB207 When You Know Multiply By To Find Symbol Vehicular Gate Operator Class CategoriesInstallation of this operator conforms to Class Installation Check ListInstructions