GTO
SL-1000B, SL-2000B
installation manual
Instructions for the Installation Dual Slide Gate System
Troubleshooting
Specs
Install
Entrapment Alarm UL 325
Connecting the Battery
Warranty
Maintenance
Accessories
Adjusting the Limit Switches
Control Board Settings
Page 34
INSTRUCTIONS FOR THE INSTALLATION OF
A DUAL SLIDE GATE SYSTEM
Use the
SL-1200
with the
SL-1000
and the
SL-2200
with
the
SL-2000
for dual slide gate systems.
®
AUTOMATIC GATE OPERATORS
32
Page 33
Page 35
Image 34
Page 33
Page 35
Contents
Automatic Gate Operator
Table of Contents
Important Safety Instructions
II. During Installation
For the Installer
Before Installation
For the System Designer
III. After Installation
Entrapment Alarm UL 325
Secondary Means of Protection Against Entrapment
For the CONSUMER/END User
No ONE should Cross the Path of the Moving Gate
Required Safety Precautions for Gates
Point hazard
SL Series
Moving Gate Can Cause Injury Or Death
GTO PRO SL-1000 Series Technical Specifications
GTO PRO SL-2000 Series Technical Specifications
Parts Identification
Overview of Operator Installation
Single Gate Operator Installation
Gate Preparation
Recommended Wiring and USE of Conduit
Mounting the Legs on the Slide Gate Operator
Before Pouring Concrete 1 Make sure operator is
Determining the Mounting Position and Mounting the Operator
Proceeding to the next step
Centered between roller posts and aligned with string
Installing the Chain
To Open the Gate Manually
Installation of the GTO Transformer
Powering the System
Connecting the Battery
No more than 1000 ft
Solar Zones and Gate Activity
Estimated Maximum Number of Cycles Per Day
Step
See Illustration K
18VAC
Control Board Settings
Right
Potentiometers
Setting the Personal Transmitter Code
Mounting the Receiver
Run the cable through PVC conduit to protect it from damage
However, if your gate opens from Left to Right
Adjusting the Limit Switches
If your gate opens from Right to Left
Counter Clockwise
Connecting Safety Devices
Connecting Additional Safety Devices
BLU Blue Used with GRN Green
Connecting Accessories
WHT White Used with GRN Green
ORG Orange Used with GRN Green
Attaching the Housing
Maintenance
Trouble Shooting Guide
Maintenance
System Test Specifications
Connected to these terminals
Limited Two Year Warranty
Warranty and Repair Service
Instructions for the Installation Dual Slide Gate System
Dual Gate System Installation
Second Gate Auxiliary Operator Parts & Hardware
Preparing the Gates
Control Unit
Wiring the Second Operator
This Step is for SL-2000/2200 Installation only
Setting the Control Board for Dual Gate Installations
Refer to the illustrations on the next
Step
Accessories
#41 Slide Gate Chain RB207
When You Know Multiply By To Find Symbol
Vehicular Gate Operator Class Categories
Installation of this operator conforms to Class
Installation Check List
Instructions
Related pages
All Install page
Where can I download a PDF of the
Dutchwest 2461 manual
?
Top
Page
Image
Contents