PREPARING THE GATES

Install PVC conduit (not included) needed for power cables and low voltage wiring – see illustration below. The PRO SL-1200 and SL-2200 power cable and safety edge (required) wiring should be run through PVC conduit underneath the driveway. If you cut the driveway be sure to reseal it after all wiring is installed.

 

 

 

Contact Sensor

 

 

Roller Guard

(REQUIRED)

Contact Sensor

Contact Sensor

(REQUIRED)

Receiver

 

(REQUIRED)

(REQUIRED)

 

(cable in separate

 

 

 

conduit)

!WARNING

 

Injury Or Death

 

120 Volt Indoor

 

Moving Gate Can Cause

 

 

 

 

Chain Bracket

Transformer

 

Chain Bracket

 

 

STAND CLEAR

(Surge Protector

 

 

 

 

 

CAUTION

not supplied)

 

 

SL-1000

 

 

 

or SL-2000

 

 

 

First Operator

 

 

Chain

 

Roller Guard

 

 

 

(REQUIRED)

 

Roller Guard

 

 

PVC Conduit for

(REQUIRED)

 

 

First Gate Operator

 

Run up to 1000' of low

power cable.

PVC Conduit for

voltage wire to control

second operator

 

 

 

 

(Control Unit)

power cable.

box from transformer

 

 

(wire not included).

Contact Sensor

Roller Guard

 

Contact Sensor

(REQUIRED)

 

(REQUIRED)

 

Contact Sensor

(REQUIRED)

 

 

 

 

 

(REQUIRED)

 

 

 

! WARNING

 

 

 

Moving Gate Can Cause

 

 

 

Injury Or Death

 

 

Chain Bracket

 

 

 

CAUTION

 

Chain Bracket

 

STAND CLEAR

 

 

 

SL-1200

 

 

 

or SL-2200

 

 

 

Second Operator

 

 

 

 

 

Chain

Roller Guard

 

Roller Guard

PVC Conduit for

(REQUIRED)

 

(REQUIRED)

 

 

 

second operator

Second Gate Operator

power cable.

 

(Auxiliary Unit)

 

34

Image 36
Contents Automatic Gate Operator Table of Contents Important Safety Instructions For the Installer Before InstallationII. During Installation For the System DesignerIII. After Installation Entrapment Alarm UL 325 Secondary Means of Protection Against EntrapmentFor the CONSUMER/END User No ONE should Cross the Path of the Moving GateRequired Safety Precautions for Gates Point hazardSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Single Gate Operator Installation Overview of Operator InstallationGate Preparation Recommended Wiring and USE of Conduit Mounting the Legs on the Slide Gate OperatorDetermining the Mounting Position and Mounting the Operator Proceeding to the next stepBefore Pouring Concrete 1 Make sure operator is Centered between roller posts and aligned with stringInstalling the Chain To Open the Gate ManuallyPowering the System Connecting the BatteryInstallation of the GTO Transformer No more than 1000 ftSolar Zones and Gate Activity Estimated Maximum Number of Cycles Per DayStep See Illustration K 18VACControl Board Settings RightPotentiometers Setting the Personal Transmitter Code Mounting the Receiver Run the cable through PVC conduit to protect it from damageAdjusting the Limit Switches If your gate opens from Right to LeftHowever, if your gate opens from Left to Right Counter ClockwiseConnecting Safety Devices Connecting Additional Safety DevicesConnecting Accessories WHT White Used with GRN GreenBLU Blue Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Maintenance Trouble Shooting Guide MaintenanceSystem Test Specifications Connected to these terminalsLimited Two Year Warranty Warranty and Repair ServiceInstructions for the Installation Dual Slide Gate System Dual Gate System Installation Second Gate Auxiliary Operator Parts & HardwarePreparing the Gates Control UnitWiring the Second Operator This Step is for SL-2000/2200 Installation onlySetting the Control Board for Dual Gate Installations Refer to the illustrations on the nextStep Accessories #41 Slide Gate Chain RB207 When You Know Multiply By To Find Symbol Vehicular Gate Operator Class CategoriesInstallation Check List Installation of this operator conforms to ClassInstructions