GTO SL-2000B Mounting the Receiver, Run the cable through PVC conduit to protect it from damage

Page 25

MOUNTING THE RECEIVER

Use the transmitter to check the range of the receiver before permanently mounting it.

Consider the following when mounting the receiver:

Receiver cable length is 20 feet (receivers with a longer cable are available as special order items; Call the GTO Sales Department). NEVER splice receiver cable!

Run the cable through PVC conduit to protect it from damage.

• DO NOT run cable through metal conduit because the receiver signal range will be decreased.

• DO NOT run cable in a conduit containing AC wiring.

DO NOT mount receiver on a metal fence or post; doing so will decrease signal range.

DO NOT overtighten the mounting screws.

The receiver range can vary from 50 to 100 feet depending upon weather, topography, and external interference.

FCC Regulation

This device complies with FCC rules Part 15. Operation is subject to the following conditions:

1.This device may not cause harmful interference.

2.This device must accept an interference that may cause undesired operation.

Transmitter distance may vary due to circumstances beyond our control. NOTE: The manufacturer is not responsible for any radio or TV interference caused by unauthorized modifications to this equipment. Such modifications could void the user’s authority to operate the equipment.

23

Image 25
Contents Automatic Gate Operator Table of Contents Important Safety Instructions Before Installation For the InstallerII. During Installation For the System DesignerIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325No ONE should Cross the Path of the Moving Gate For the CONSUMER/END UserPoint hazard Required Safety Precautions for GatesSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Overview of Operator Installation Single Gate Operator InstallationGate Preparation Mounting the Legs on the Slide Gate Operator Recommended Wiring and USE of ConduitProceeding to the next step Determining the Mounting Position and Mounting the OperatorBefore Pouring Concrete 1 Make sure operator is Centered between roller posts and aligned with stringTo Open the Gate Manually Installing the ChainConnecting the Battery Powering the SystemInstallation of the GTO Transformer No more than 1000 ftEstimated Maximum Number of Cycles Per Day Solar Zones and Gate ActivityStep 18VAC See Illustration KRight Control Board SettingsPotentiometers Setting the Personal Transmitter Code Run the cable through PVC conduit to protect it from damage Mounting the ReceiverIf your gate opens from Right to Left Adjusting the Limit SwitchesHowever, if your gate opens from Left to Right Counter ClockwiseConnecting Additional Safety Devices Connecting Safety DevicesWHT White Used with GRN Green Connecting AccessoriesBLU Blue Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Maintenance Maintenance Trouble Shooting GuideConnected to these terminals System Test SpecificationsWarranty and Repair Service Limited Two Year WarrantyInstructions for the Installation Dual Slide Gate System Second Gate Auxiliary Operator Parts & Hardware Dual Gate System InstallationControl Unit Preparing the GatesThis Step is for SL-2000/2200 Installation only Wiring the Second OperatorRefer to the illustrations on the next Setting the Control Board for Dual Gate InstallationsStep Accessories #41 Slide Gate Chain RB207 Vehicular Gate Operator Class Categories When You Know Multiply By To Find SymbolInstallation of this operator conforms to Class Installation Check ListInstructions