GTO SL-2000B, SL-1000B installation manual GTO PRO SL-1000 Series Technical Specifications

Page 11

GTO PRO SL-1000 SERIES TECHNICAL SPECIFICATIONS

DRIVE

Powered by a 12 V motor with integral case hardened steel gear reduction to 90 rpm. Generates 155 in. lb. of torque at 12 V. Motor temperature range -30 °F to +160 °F.

Gate velocity: 1 ft/s.

POWER

The PRO SL-1000system is powered by a 12 Vdc, 7.0 Ah, sealed, rechargeable battery.

Battery charge for PRO SL-1000is maintained by a 18 Vac (40 VA) transformer rectified to 14.5 Vdc through the GTO Control Board. Two (2) blade-style control board fuses rated for 15 A.

NOTE: The transformer should not be connected directly to any battery. Transformer must be connected with a

minimum of 16 gauge, multi-stranded, dual conductor, direct burial low voltage wire. NOTE: Do not replace fuses with higher ampere rated fuses; doing so will void the warranty and may damage the control board.

Battery charge maintained by GTO Solar Panel Charger: float voltage 14.5 Vdc output from a

193/8” x 151/4” silicon alloy panel. Generates minimum of 10 W at 600 mA. Gated diode on the control board prevents battery discharge.

CONTROL

GTO microprocessor controlled board with temperature compensated circuits. Auto-memorization of digital transmitter code. Charging regulated by circuit on control board. “Sleep draw” is 40 mA; “active draw” is 2 to 5 A.

GTO remote-mounted RF receiver tuned to 318 MHz.

Limit controls are mechanical. Normally open contact.

Adjustable auto-close timer (OFF to 120 s), inertia, and obstruction sensitivity using three (3) potentiometers.

Power terminal block accommodates a transformer and solar panels.

Operator terminal blocks accommodate safety edges and photoelectric sensors for opening and closing modes.

Fully compatible accessory terminal block provides connections for safety loops, wands, intercoms, card readers, phone systems, etc.

DIP switches simplify setup of gate operator.

audio entrapment alarm sounds if unit obstructs twice while opening or closing.

OPERATIONAL CAPACITY

The GTO/PRO SL-1000 and GTO/PRO SL-1000Bwill handle gates weighing up to 500 lb. (226.7 kg) and up to 30 ft. (9.14 m) in length (per leaf) if the proper installation procedures have been followed. Note that ball bearing rollers and covers should be used on all gates.

The GTO/PRO SL-1000series operators are capable high volume cycling; however, the total cycles per day will depend on the motor current and efficiency of the gate installation (see chart below). For questions relating to specific applications and for information regarding cycling duty when charged by solar panels, call the GTO Service Department at (800) 543- 1236.

Gate Capacity Chart for SL-1000 Series

(estimated number of cycles based on use with a transformer)

Gate Opening

20 ft.

120

110

100

90

16 ft.

140

130

120

110

12 ft.

160

150

140

130

8 ft.

180

170

160

150

200 lb. 300 lb. 400 lb. 500 lb.

Gate Weight

Cycles shown are for single gate, dual gates will get approximately half as many cycles.

Housing Dimensions:

Height: 18” Width: 211/2” Depth: 11”

Shipping Weight:

Approximately 90 lb.

 

 

Rollers should be lubricated at least four times per year.

SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE.

9

Image 11
Contents Automatic Gate Operator Table of Contents Important Safety Instructions For the System Designer For the InstallerBefore Installation II. During InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325No ONE should Cross the Path of the Moving Gate For the CONSUMER/END UserPoint hazard Required Safety Precautions for GatesSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Gate Preparation Single Gate Operator InstallationOverview of Operator Installation Mounting the Legs on the Slide Gate Operator Recommended Wiring and USE of ConduitCentered between roller posts and aligned with string Determining the Mounting Position and Mounting the OperatorProceeding to the next step Before Pouring Concrete 1 Make sure operator isTo Open the Gate Manually Installing the ChainNo more than 1000 ft Powering the SystemConnecting the Battery Installation of the GTO TransformerEstimated Maximum Number of Cycles Per Day Solar Zones and Gate ActivityStep 18VAC See Illustration KRight Control Board SettingsPotentiometers Setting the Personal Transmitter Code Run the cable through PVC conduit to protect it from damage Mounting the ReceiverCounter Clockwise Adjusting the Limit SwitchesIf your gate opens from Right to Left However, if your gate opens from Left to RightConnecting Additional Safety Devices Connecting Safety DevicesORG Orange Used with GRN Green Connecting AccessoriesWHT White Used with GRN Green BLU Blue Used with GRN GreenAttaching the Housing Maintenance Maintenance Trouble Shooting GuideConnected to these terminals System Test SpecificationsWarranty and Repair Service Limited Two Year WarrantyInstructions for the Installation Dual Slide Gate System Second Gate Auxiliary Operator Parts & Hardware Dual Gate System InstallationControl Unit Preparing the GatesThis Step is for SL-2000/2200 Installation only Wiring the Second OperatorRefer to the illustrations on the next Setting the Control Board for Dual Gate InstallationsStep Accessories #41 Slide Gate Chain RB207 Vehicular Gate Operator Class Categories When You Know Multiply By To Find SymbolInstructions Installation Check ListInstallation of this operator conforms to Class