GTO SL-2000B, SL-1000B Solar Zones and Gate Activity, Estimated Maximum Number of Cycles Per Day

Page 19

INSTALLATION OF THE GTO TRANSFORMER CONT.

2)If the gate is binding or dragging, or if ball bearing rollers are not used, it will require more than 10 amps to move it. This will reduce the MNC.

3)The charts are based on the transformer being plugged into an outlet that provides a line voltage of 120 volts; if the outlet provides less than 120 volts (for example, some rural areas may only provide 105 volts), it can reduce the MNC by as much as 50%.

4)A fully charged standard battery has an inherent reserve of 20-50 cycles without requiring a charge. This allows peak loads at several points during the day, depending upon how much time the transformer has to provide a charge to the battery between cycles. The transformer is capable of fully recharging the battery in as little as five minutes at optimum conditions.

5)The charts on page 16 are based upon an ambient temperature of 40º F. Battery performance and speed at which it will recharge will fluctuate based upon temperature.

6)The MNC for dual gate applications will be about 50% less of those for a single gate.

IMPORTANT:

The GTO transformer is intended for indoor use. If the transformer can only be plugged into an outside electrical outlet, a weatherproof housing or cover (available at electrical supply stores) must be used.

Use of a surge protector is highly recommended.

Optional Solar Panels are available from a GTO dealer; see Accessory Catalog.

The GTO/PRO 24Amp Hour Battery Kit is required for the SL-2000 in solar applications, see Accessory Catalog.

NOTE: If your are considering using the GTO solar panel to maintain the system battery charge, please see the following chart:

SOLAR ZONES AND GATE ACTIVITY

This table and map illustrates the maximum number of cycles per day to be expected in a particular area, using either one or two of GTO’s 10 watt solar panels (see Accessory Catalog). Figures are shown for winter (minimum sunlight) and do not account for use of any accessory items.

NOTE: Accessories will draw additional power from the battery.

Zone 1

Zone 3

Zone 2

Zone 3

Zone 3

 

Estimated Maximum Number of Cycles Per Day

Winter Ratings

Watts

Zone 1

Zone 2

Zone 3

 

 

 

 

 

 

 

SL1000

10

4

8

13

 

SL1000

15

6

12

20

 

SL1000

20

8

16

26

 

Dual SL1000

15

3

6

10

 

Dual SL1000

20

4

8

13

 

 

 

 

 

 

 

Requires 24 Amp Hour Battery

 

 

 

 

 

 

 

 

 

 

SL2000

10

4

8

13

 

SL2000

15

6

12

20

 

SL2000

20

8

16

26

 

Dual SL2000

15

3

6

10

 

Dual SL2000

20

4

8

13

 

 

 

 

 

 

 

 

17

Image 19
Contents Automatic Gate Operator Table of Contents Important Safety Instructions For the System Designer For the InstallerBefore Installation II. During InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325No ONE should Cross the Path of the Moving Gate For the CONSUMER/END UserPoint hazard Required Safety Precautions for GatesSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Overview of Operator Installation Single Gate Operator InstallationGate Preparation Mounting the Legs on the Slide Gate Operator Recommended Wiring and USE of ConduitCentered between roller posts and aligned with string Determining the Mounting Position and Mounting the OperatorProceeding to the next step Before Pouring Concrete 1 Make sure operator isTo Open the Gate Manually Installing the ChainNo more than 1000 ft Powering the SystemConnecting the Battery Installation of the GTO TransformerEstimated Maximum Number of Cycles Per Day Solar Zones and Gate ActivityStep 18VAC See Illustration KRight Control Board SettingsPotentiometers Setting the Personal Transmitter Code Run the cable through PVC conduit to protect it from damage Mounting the ReceiverCounter Clockwise Adjusting the Limit SwitchesIf your gate opens from Right to Left However, if your gate opens from Left to RightConnecting Additional Safety Devices Connecting Safety DevicesORG Orange Used with GRN Green Connecting AccessoriesWHT White Used with GRN Green BLU Blue Used with GRN GreenAttaching the Housing Maintenance Maintenance Trouble Shooting GuideConnected to these terminals System Test SpecificationsWarranty and Repair Service Limited Two Year WarrantyInstructions for the Installation Dual Slide Gate System Second Gate Auxiliary Operator Parts & Hardware Dual Gate System InstallationControl Unit Preparing the GatesThis Step is for SL-2000/2200 Installation only Wiring the Second OperatorRefer to the illustrations on the next Setting the Control Board for Dual Gate InstallationsStep Accessories #41 Slide Gate Chain RB207 Vehicular Gate Operator Class Categories When You Know Multiply By To Find SymbolInstallation of this operator conforms to Class Installation Check ListInstructions