GTO SL-2000B, SL-1000B installation manual III. After Installation

Page 5

IMPORTANT SAFETY INSTRUCTIONS

5. Mount access controls away from the gate (minimum distance is 10 feet). The user must have full view of the gate but be unable to touch it while operating the controls.

6.Secure outdoor or easily accessed gate operator controls in order to prohibit unauthorized use of the gate.

III.After Installation

1.Review ALL safety instructions with the consumer/end user and explain the basic operation and safety systems of the entire gate operator system, including disconnecting the chain for manual gate operation.

2.Inform the consumer/end user that servicing of the operator must only be done by an experienced technician.

3.Attach the warning signs (included) to each side of the gate to alert public of automatic gate operation. Take a photo of warning signs installed on gate. Record the date of the photo for your reference.

4.SAVE THESE INSTRUCTIONS. Leave IMPORTANT SAFETY INSTRUCTIONS (included) with consumer/end user.

3

Image 5
Contents Automatic Gate Operator Table of Contents Important Safety Instructions Before Installation For the InstallerII. During Installation For the System DesignerIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325No ONE should Cross the Path of the Moving Gate For the CONSUMER/END UserPoint hazard Required Safety Precautions for GatesSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Gate Preparation Single Gate Operator InstallationOverview of Operator Installation Mounting the Legs on the Slide Gate Operator Recommended Wiring and USE of ConduitProceeding to the next step Determining the Mounting Position and Mounting the OperatorBefore Pouring Concrete 1 Make sure operator is Centered between roller posts and aligned with stringTo Open the Gate Manually Installing the ChainConnecting the Battery Powering the SystemInstallation of the GTO Transformer No more than 1000 ftEstimated Maximum Number of Cycles Per Day Solar Zones and Gate ActivityStep 18VAC See Illustration KRight Control Board SettingsPotentiometers Setting the Personal Transmitter Code Run the cable through PVC conduit to protect it from damage Mounting the ReceiverIf your gate opens from Right to Left Adjusting the Limit SwitchesHowever, if your gate opens from Left to Right Counter ClockwiseConnecting Additional Safety Devices Connecting Safety DevicesWHT White Used with GRN Green Connecting AccessoriesBLU Blue Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Maintenance Maintenance Trouble Shooting GuideConnected to these terminals System Test SpecificationsWarranty and Repair Service Limited Two Year WarrantyInstructions for the Installation Dual Slide Gate System Second Gate Auxiliary Operator Parts & Hardware Dual Gate System InstallationControl Unit Preparing the GatesThis Step is for SL-2000/2200 Installation only Wiring the Second OperatorRefer to the illustrations on the next Setting the Control Board for Dual Gate InstallationsStep Accessories #41 Slide Gate Chain RB207 Vehicular Gate Operator Class Categories When You Know Multiply By To Find SymbolInstructions Installation Check ListInstallation of this operator conforms to Class