GTO SL-2000B, SL-1000B installation manual SL Series

Page 9

IMPORTANT SAFETY INSTRUCTIONS

These warning labels should be found at the locations specified below. If any of them are missing, immediately contact your installer for replacements.

!WARNING

Fingers, hands, and loose clothing may be dragged into chain sprockets.

Fingers and hands can

be injured by rotating sprockets.

• Keep hands, fingers,

and loose clothing away from chain and chain opening in operator housing.

warning labels (3). Located on both sides and back of operator housing

SL Series

Conforms to UL 325 STANDARDS

CUS Certified to CAN/CSA-C22.2 No.247-92

L

D

Maximum Gate: 500 lb. (226.7 kg); 30 ft. (9.1 m)

 

ISTE

9901178

Voltage: 12 Vdc; Frequency: 0 Hz; Power: 93.2 W

Class I, II and III Vehicular Slide Gate Operator

Serial Number: SL1000-xxxxxxx

Disconnect operator ONLY when the gate is NOT moving.

TO MANUALLY OPEN AND CLOSE THE GATE:

1.Lift quick release pins UP, then pull them OUT of chain brackets.

2.Lay chain down and manually slide gate to desired position.

GTO, Inc. Tallahassee, Florida USA

RB2001

Series

Conforms to UL 325 STANDARDS

Certified to CAN/CSA-C22.2 No.247-92

CUS

LI

D

Maximum Gate: 1000 lb. (453.4 kg); 30 ft. (9.1 m)

 

STE

9901178

Voltage: 12 Vdc; Frequency: 0 Hz; Power: 93.2 W

Class I, II and III Vehicular Slide Gate Operator

Serial Number: SL2000-xxxxxxx

Disconnect operator ONLY when the gate is NOT moving.

TO MANUALLY OPEN AND CLOSE THE GATE:

1.Lift quick release pins UP, then pull them OUT of chain brackets.

2.Lay chain down and manually slide gate to desired position.

GTO, Inc. Tallahassee, Florida USA

RB2002

!WARNING

Moving parts inside are capable of causing injury to fingers and hands.

DO NOT remove operator housing.

Consult your safety manual before making adjustments.

For service, call an experienced technician.

AUTOMATIC GATE OPENERS 1-800-543-GATE

warning label located on front of operator housing

!WARNING

• Fingers, hands, and loose clothing may be dragged into chain sprockets.

• Fingers and hands can be injured by rotating sprockets.

• Keep hands, fingers, and loose clothing away from chain and sprockets.

warning label located on top of control box

product identification and manual operation instruction label installed on control box cover

7

Image 9
Contents Automatic Gate Operator Table of Contents Important Safety Instructions Before Installation For the InstallerII. During Installation For the System DesignerIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325No ONE should Cross the Path of the Moving Gate For the CONSUMER/END UserPoint hazard Required Safety Precautions for GatesSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Single Gate Operator Installation Overview of Operator InstallationGate Preparation Mounting the Legs on the Slide Gate Operator Recommended Wiring and USE of ConduitProceeding to the next step Determining the Mounting Position and Mounting the OperatorBefore Pouring Concrete 1 Make sure operator is Centered between roller posts and aligned with stringTo Open the Gate Manually Installing the ChainConnecting the Battery Powering the SystemInstallation of the GTO Transformer No more than 1000 ftEstimated Maximum Number of Cycles Per Day Solar Zones and Gate ActivityStep 18VAC See Illustration KRight Control Board SettingsPotentiometers Setting the Personal Transmitter Code Run the cable through PVC conduit to protect it from damage Mounting the ReceiverIf your gate opens from Right to Left Adjusting the Limit SwitchesHowever, if your gate opens from Left to Right Counter ClockwiseConnecting Additional Safety Devices Connecting Safety DevicesWHT White Used with GRN Green Connecting AccessoriesBLU Blue Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Maintenance Maintenance Trouble Shooting GuideConnected to these terminals System Test SpecificationsWarranty and Repair Service Limited Two Year WarrantyInstructions for the Installation Dual Slide Gate System Second Gate Auxiliary Operator Parts & Hardware Dual Gate System InstallationControl Unit Preparing the GatesThis Step is for SL-2000/2200 Installation only Wiring the Second OperatorRefer to the illustrations on the next Setting the Control Board for Dual Gate InstallationsStep Accessories #41 Slide Gate Chain RB207 Vehicular Gate Operator Class Categories When You Know Multiply By To Find SymbolInstallation Check List Installation of this operator conforms to ClassInstructions