GTO SL-2000B, SL-1000B installation manual See Illustration K, 18VAC

Page 21

INSTALLATION OF THE GTO TRANSFORMER CONT.

STEP 12:

Illustration K

 

 

 

 

Strip 3/16” off the ends of the low voltage wire and

Correct

 

Wrong

Wrong

 

twist tightly. These wire ends will be attached to

 

 

 

 

 

 

 

 

the control board at the 18VAC terminals located

 

 

 

 

 

 

on the POWER IN terminal block (see Illustration

 

 

 

 

 

 

L).Wire sheathing should not come in contact with

 

 

 

 

 

 

terminals, however, it should not be stripped so far

 

 

 

 

 

 

that wires can come in contact with one another

 

 

 

 

 

 

(see Illustration K).

Wire

Terminal

Wire

Terminal

Wire

Terminal

 

Block

Block

Block

Insert one transformer wire

 

 

 

 

into an

18VAC terminal.

 

 

 

 

Insert the other transformer

 

 

 

 

wire into the remaining

 

 

 

 

18VAC

terminal

( see

 

RED BLK ORG BLU GRN CLSEDG

OPNEDG

RE

illustration L). Transformer

18VAC SOLAR

wires can be connected to the

~ ~ – +

 

 

 

 

 

 

 

18VAC terminals regardless

 

 

 

 

of color.

 

 

POWER IN

FIRST OPERATOR

 

SECOND OPER

Tighten set

screws

against

 

exposed end of wires (see

 

Illustration

K). A

dab of

RED BLACK

household petroleum jelly

 

on each wire end will help

 

prevent corrosion.

 

 

The ACCESSORY terminal

Power Cable

block provides the connection

point for safety loops, wands,

from First Operator

 

push buttons, intercoms, card

 

readers, etc.

See

page 27

Low Voltage Wire

for more information about

connecting accessories.

from AC Transformer

 

Transformer

SURGE PROTECTOR

HINT: Keep a few mothballs in the control box to discourage insects from entering it and damaging the control board.

STEP 13:

Plug the transformer into the electrical outlet. Check to see if the green LED on the control board is on. If it is not, see the Troubleshooting Guide on page 30.

NOTE: Use of a surge protector is strongly recommended.

19

Image 21
Contents Automatic Gate Operator Table of Contents Important Safety Instructions Before Installation For the InstallerII. During Installation For the System DesignerIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325No ONE should Cross the Path of the Moving Gate For the CONSUMER/END UserPoint hazard Required Safety Precautions for GatesSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Single Gate Operator Installation Overview of Operator InstallationGate Preparation Mounting the Legs on the Slide Gate Operator Recommended Wiring and USE of ConduitProceeding to the next step Determining the Mounting Position and Mounting the OperatorBefore Pouring Concrete 1 Make sure operator is Centered between roller posts and aligned with stringTo Open the Gate Manually Installing the ChainConnecting the Battery Powering the SystemInstallation of the GTO Transformer No more than 1000 ftEstimated Maximum Number of Cycles Per Day Solar Zones and Gate ActivityStep 18VAC See Illustration KRight Control Board SettingsPotentiometers Setting the Personal Transmitter Code Run the cable through PVC conduit to protect it from damage Mounting the ReceiverIf your gate opens from Right to Left Adjusting the Limit SwitchesHowever, if your gate opens from Left to Right Counter ClockwiseConnecting Additional Safety Devices Connecting Safety DevicesWHT White Used with GRN Green Connecting AccessoriesBLU Blue Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Maintenance Maintenance Trouble Shooting GuideConnected to these terminals System Test SpecificationsWarranty and Repair Service Limited Two Year WarrantyInstructions for the Installation Dual Slide Gate System Second Gate Auxiliary Operator Parts & Hardware Dual Gate System InstallationControl Unit Preparing the GatesThis Step is for SL-2000/2200 Installation only Wiring the Second OperatorRefer to the illustrations on the next Setting the Control Board for Dual Gate InstallationsStep Accessories #41 Slide Gate Chain RB207 Vehicular Gate Operator Class Categories When You Know Multiply By To Find SymbolInstallation Check List Installation of this operator conforms to ClassInstructions