GTO SL-2000B Recommended Wiring and USE of Conduit, Mounting the Legs on the Slide Gate Operator

Page 15

RECOMMENDED WIRING AND USE OF CONDUIT

Run the low voltage wire and receiver wire through PVC conduit into the slider unit to protect it from lawn mowers, weed eaters, grazing animals, etc. PVC conduit should be used for accessory wires such as loop detectors, key pads, card readers or any other entry device.

Roller Guard

Roller Guard

 

CAUTION

CAUTION

 

STAND CLEAR

 

STAND CLEAR

 

 

Operator

Operator

 

Roller

Roller Guard

Roller Guard

Roller Guard

 

 

Separate PVC Conduits

Separate PVC Cond

 

for power, receiver

 

for power, receiver

and control wiring.

 

and control wiring.

 

 

Conduit through the concrete pad.

Conduit around the concrete pad.

MOUNTING THE LEGS ON THE SLIDE GATE OPERATOR

STEP 1

Mount the legs on the slide gate operator using the 3/8” x 3” Carriage Bolts, 3/8” Flat Washers, 3/8” Lock Washers, and 3/8” Nuts. See Illustration A.

3/8"-16x3" Carriage Bolts

G

RNIN

WA

R

N

3/8" Lock Washers

& Nuts

48" x 2" sq. Legs

Illustration A

13

Image 15
Contents Automatic Gate Operator Table of Contents Important Safety Instructions For the System Designer For the InstallerBefore Installation II. During InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325No ONE should Cross the Path of the Moving Gate For the CONSUMER/END UserPoint hazard Required Safety Precautions for GatesSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Single Gate Operator Installation Overview of Operator InstallationGate Preparation Mounting the Legs on the Slide Gate Operator Recommended Wiring and USE of ConduitCentered between roller posts and aligned with string Determining the Mounting Position and Mounting the OperatorProceeding to the next step Before Pouring Concrete 1 Make sure operator isTo Open the Gate Manually Installing the ChainNo more than 1000 ft Powering the SystemConnecting the Battery Installation of the GTO TransformerEstimated Maximum Number of Cycles Per Day Solar Zones and Gate ActivityStep 18VAC See Illustration KRight Control Board SettingsPotentiometers Setting the Personal Transmitter Code Run the cable through PVC conduit to protect it from damage Mounting the ReceiverCounter Clockwise Adjusting the Limit SwitchesIf your gate opens from Right to Left However, if your gate opens from Left to RightConnecting Additional Safety Devices Connecting Safety DevicesORG Orange Used with GRN Green Connecting AccessoriesWHT White Used with GRN Green BLU Blue Used with GRN GreenAttaching the Housing Maintenance Maintenance Trouble Shooting GuideConnected to these terminals System Test SpecificationsWarranty and Repair Service Limited Two Year WarrantyInstructions for the Installation Dual Slide Gate System Second Gate Auxiliary Operator Parts & Hardware Dual Gate System InstallationControl Unit Preparing the GatesThis Step is for SL-2000/2200 Installation only Wiring the Second OperatorRefer to the illustrations on the next Setting the Control Board for Dual Gate InstallationsStep Accessories #41 Slide Gate Chain RB207 Vehicular Gate Operator Class Categories When You Know Multiply By To Find SymbolInstallation Check List Installation of this operator conforms to ClassInstructions