INSTALLATION CHECK LIST

The installation of this operator conforms to CLASS __________.

The installer verifies that (each item must be checked):

____ Required safety edges were installed.

____ Roller guards were installed over gate rollers.

____ Fence was screened so that no one can reach through the gate to operate controls.

____ Customer was informed that this gate is for vehicular use ONLY. Pedestrians MAY NOT use this gate.

____ A separate gate or entrance was installed for pedestrian use.

____ All warning signs and labels were installed as specified in the IMPORTANT SAFETY

INSTRUCTIONS.

____ Safety instructions were reviewed with the customer.

___ The IMPORTANT SAFETY INSTRUCTIONS manual was given to the customer.

____ Customer was instructed about proper use of the foot pedal release.

____ Customer was instructed about proper use of transmitter and (or) other entry controls.

____ Customer was asked to fill out customer support card and mail it to GTO, Inc.

____ Customer was asked to retain all receipts (receipts provide proof of warranty).

___ Customer was asked to retain IMPORTANT SAFETY INSTRUCTIONS, etc. for future reference.

____ The completed installation was photographed from both the front and back of the gate. Photo was dated.

Customer’s Signature

Date

Installer’s Signature

Date

 

Image 43
Contents Automatic Gate Operator Table of Contents Important Safety Instructions For the System Designer For the InstallerBefore Installation II. During InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325No ONE should Cross the Path of the Moving Gate For the CONSUMER/END UserPoint hazard Required Safety Precautions for GatesSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Overview of Operator Installation Single Gate Operator InstallationGate Preparation Mounting the Legs on the Slide Gate Operator Recommended Wiring and USE of ConduitCentered between roller posts and aligned with string Determining the Mounting Position and Mounting the OperatorProceeding to the next step Before Pouring Concrete 1 Make sure operator isTo Open the Gate Manually Installing the ChainNo more than 1000 ft Powering the SystemConnecting the Battery Installation of the GTO TransformerEstimated Maximum Number of Cycles Per Day Solar Zones and Gate ActivityStep 18VAC See Illustration KRight Control Board SettingsPotentiometers Setting the Personal Transmitter Code Run the cable through PVC conduit to protect it from damage Mounting the ReceiverCounter Clockwise Adjusting the Limit SwitchesIf your gate opens from Right to Left However, if your gate opens from Left to RightConnecting Additional Safety Devices Connecting Safety DevicesORG Orange Used with GRN Green Connecting AccessoriesWHT White Used with GRN Green BLU Blue Used with GRN GreenAttaching the Housing Maintenance Maintenance Trouble Shooting GuideConnected to these terminals System Test SpecificationsWarranty and Repair Service Limited Two Year WarrantyInstructions for the Installation Dual Slide Gate System Second Gate Auxiliary Operator Parts & Hardware Dual Gate System InstallationControl Unit Preparing the GatesThis Step is for SL-2000/2200 Installation only Wiring the Second OperatorRefer to the illustrations on the next Setting the Control Board for Dual Gate InstallationsStep Accessories #41 Slide Gate Chain RB207 Vehicular Gate Operator Class Categories When You Know Multiply By To Find SymbolInstallation of this operator conforms to Class Installation Check ListInstructions