GTO SL-1000B, SL-2000B installation manual System Test Specifications, Connected to these terminals

Page 32

The transformer: Two things can cause failure: the first is shorting the leads during the installation, or letting the strands touch at the terminal on the control board. The second is a static charge (generally associated with a lightning storm or power outage); use of a surge protector will help.

Testing the battery: This is a 12 volt 7 Ah battery. The proper way to test this is to perform a load test. Place the voltmeter on D.C.; put the red probe on the (+) positive terminal and place the black probe on (-) negative terminal. Then activate the unit and watch the voltmeter. The drop should not be more than 1 volt.

Note: A loose battery terminal will cause the same symptoms that a bad battery will cause. Terminals should be secure and corrosion free.

Remote control range: This will vary at each installation. (see FCC disclaimer on page 23), but generally varies from 50 ft. to 100 ft.

Make sure that the receiver is located above metal fences.

Moving the receiver even a few inches can change the range of operation.

Move the receiver as far from the motor as possible to avoid the chance of electrical interference.

Check or change the battery in the transmitter.

 

SYSTEM TEST SPECIFICATIONS

Transformer:

120 Vac / 60 Hz input

 

18 Vac / 40 VA output

10 W solar panel: 18-22 Vdc / 600 mA per hour

Battery:

12 Vdc / 7 Ah

Wire:

16 gauge, multi stranded, direct burial

Motor:

12 Vdc 90 rpm with case hardened gears. The motor current range

 

is 2.5 to 10 A if the gate is in good working order.

Receiver:

5 Vdc / digital communication. ONLY GTO receivers can be

 

connected to these terminals.

Control board:

Microprocessor driven. Powered by 12 Vdc.

The GTO, Inc. Technical Service Department is open

Monday – Friday 8:00 A.M. – 5:00 P.M. (Eastern Time)

TELEPHONE (800) 543-1236 OR (850) 575-4144

FAX (850) 575-8950E-M AIL: TECHSUP P ORT@GTOINC.COM WWW.GTOINC.COM

30

Image 32
Contents Automatic Gate Operator Table of Contents Important Safety Instructions For the Installer Before InstallationII. During Installation For the System DesignerIII. After Installation Entrapment Alarm UL 325 Secondary Means of Protection Against EntrapmentFor the CONSUMER/END User No ONE should Cross the Path of the Moving GateRequired Safety Precautions for Gates Point hazardSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Gate Preparation Single Gate Operator InstallationOverview of Operator Installation Recommended Wiring and USE of Conduit Mounting the Legs on the Slide Gate OperatorDetermining the Mounting Position and Mounting the Operator Proceeding to the next stepBefore Pouring Concrete 1 Make sure operator is Centered between roller posts and aligned with stringInstalling the Chain To Open the Gate ManuallyPowering the System Connecting the BatteryInstallation of the GTO Transformer No more than 1000 ftSolar Zones and Gate Activity Estimated Maximum Number of Cycles Per DayStep See Illustration K 18VACControl Board Settings RightPotentiometers Setting the Personal Transmitter Code Mounting the Receiver Run the cable through PVC conduit to protect it from damageAdjusting the Limit Switches If your gate opens from Right to LeftHowever, if your gate opens from Left to Right Counter ClockwiseConnecting Safety Devices Connecting Additional Safety DevicesConnecting Accessories WHT White Used with GRN GreenBLU Blue Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Maintenance Trouble Shooting Guide MaintenanceSystem Test Specifications Connected to these terminalsLimited Two Year Warranty Warranty and Repair ServiceInstructions for the Installation Dual Slide Gate System Dual Gate System Installation Second Gate Auxiliary Operator Parts & HardwarePreparing the Gates Control UnitWiring the Second Operator This Step is for SL-2000/2200 Installation onlySetting the Control Board for Dual Gate Installations Refer to the illustrations on the nextStep Accessories #41 Slide Gate Chain RB207 When You Know Multiply By To Find Symbol Vehicular Gate Operator Class CategoriesInstructions Installation Check ListInstallation of this operator conforms to Class