GTO SL-2000B, SL-1000B installation manual Installing the Chain, To Open the Gate Manually

Page 17

INSTALLING THE CHAIN

Illustration F

Chain Bracket

Quick Release Pin

Chain

Master Link

STEP 5

After the concrete has hardened, remove the string from the quick release pins. Attach the chain to one quick release pin with a master link (see Illustration F). Run the chain through the chain sprockets (see Illustration G).

STEP 6

Pull the chain to the second chain bracket leaving approximately four inches of slack (see Illustration G). Do not pull chain tight; a tight chain will interfere with the operation of the operator. Mark the chain where it meets the second quick release pin.

Chain Bracket

! WARNING

!WARNING

• Fingers, hands, and loose clothing may be dragged into chain

sprockets.

• Fingers and hands can be injured by rotating sprockets.

• Keep hands, fingers, and loose clothing away from chain and sprockets.

Illustration G

Chain Bracket

Sprockets

Chain

Allow 1" of slack for every 10' of chain

Gate

STEP 7

Drive the pin out of the chain link using a tool

such as a punch or chain break. Connect the Illustration HChain Bracket chain to the second quick release pin using a

master link (see Illustration H).

TO OPEN THE GATE MANUALLY:

1. LIFT the quick release pins UP, then PULL them OUT of the chain brackets (see illustration).

Quick Release Pin

2. Lay the chain down and manually slide the gate to the desired position.

To prevent unauthorized removal of the

Chain

 

quick release pins, install pin locks (see

Master Link

accessory catalog) above the quick release

 

pins in both chain brackets.

 

15

Image 17
Contents Automatic Gate Operator Table of Contents Important Safety Instructions Before Installation For the InstallerII. During Installation For the System DesignerIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325No ONE should Cross the Path of the Moving Gate For the CONSUMER/END UserPoint hazard Required Safety Precautions for GatesSL Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Gate Preparation Single Gate Operator InstallationOverview of Operator Installation Mounting the Legs on the Slide Gate Operator Recommended Wiring and USE of ConduitProceeding to the next step Determining the Mounting Position and Mounting the OperatorBefore Pouring Concrete 1 Make sure operator is Centered between roller posts and aligned with stringTo Open the Gate Manually Installing the ChainConnecting the Battery Powering the SystemInstallation of the GTO Transformer No more than 1000 ftEstimated Maximum Number of Cycles Per Day Solar Zones and Gate ActivityStep 18VAC See Illustration KRight Control Board SettingsPotentiometers Setting the Personal Transmitter Code Run the cable through PVC conduit to protect it from damage Mounting the ReceiverIf your gate opens from Right to Left Adjusting the Limit SwitchesHowever, if your gate opens from Left to Right Counter ClockwiseConnecting Additional Safety Devices Connecting Safety DevicesWHT White Used with GRN Green Connecting AccessoriesBLU Blue Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Maintenance Maintenance Trouble Shooting GuideConnected to these terminals System Test SpecificationsWarranty and Repair Service Limited Two Year WarrantyInstructions for the Installation Dual Slide Gate System Second Gate Auxiliary Operator Parts & Hardware Dual Gate System InstallationControl Unit Preparing the GatesThis Step is for SL-2000/2200 Installation only Wiring the Second OperatorRefer to the illustrations on the next Setting the Control Board for Dual Gate InstallationsStep Accessories #41 Slide Gate Chain RB207 Vehicular Gate Operator Class Categories When You Know Multiply By To Find SymbolInstructions Installation Check ListInstallation of this operator conforms to Class