3.Use Table 2-7 to determine the worst case loss for the 62.5/125 fiber cable (1700 meters x 5 dB = 8.5 dB). Add the losses to determine total path loss. The total path loss is 9.5 dB. Because the overall power budget is 10.0 dB, this leaves .5 dB to spare, so the link can be made.

Ensure you do not overdrive a receiver (that is, the received optical power level is not greater than the maximum received sensitivity level of the fiber connector). In this case, the maximum possible transmit power (-17 dB + 3.0) is -14.0 dB (see Table 2-3). The power loss over the link is 9.5 dB. This means that the power level of the signal will drop to -23.5 dB by the time it reaches the receiver. Because the maximum receiver sensitivity is -8.0 dB, there is no overdrive problem.

Example: 2000 Meter Fiber Link Through Two Patch Panels

In this example, two ONline concentrators are separated by 2000 meters of fiber cable with two patch panels between them

.

Figure 2-2. 2000 Meter Fiber Link Through Two Patch Panels

To calculate the maximum link distance:

1.Use Table 2-3 to determine the optical power budget for 50/125 cable (5.5 dB).

2.Use Table 2-6 to determine the worst case loss for two ST patch panels (1.5 dB).

Designing and Expanding the Network 2 - 13

Page 37
Image 37
3Com 5104M-FB1, 5102M-FBP, 510M-FBP installation and operation guide Example 2000 Meter Fiber Link Through Two Patch Panels